---
title: eCPR Meaning, PWCR and A-131 Defined | WellStanding
url: https://wellstanding.com/glossary/
description: What eCPR, PWCR, PWC-100, DIR project ID and Form A-1-131 mean on California public works, with the deadline, penalty and primary source where one applies.
updated: 2026-11-13
type: page
publisher: WellStanding Certified Payroll
---
# California public works glossary: eCPR, PWCR, A-131 and the rest

Plain-English definitions of the terms California public works contractors search for, checked against [Labor Code 1771.4](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1771.4), [Labor Code 1776](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1776) and the [DIR certified payroll page](https://www.dir.ca.gov/public-works/certified-payroll-reporting.html), with links to the deeper guides.

Last reviewed November 13, 2026 against the sources it cites

The short answer

eCPR means electronic certified payroll record, the payroll report California contractors send to DIR at least once every 30 days on most public works. PWCR is the legacy name of DIR's contractor registration system, and your PWCR number is your registration number. PWC-100 is project registration, and Form A-1-131 is the DLSE payroll form.

- eCPR is the electronic filing of certified payroll that each contractor and subcontractor must send directly to the Labor Commissioner at least once every 30 days while work is performed, under [Labor Code 1771.4](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1771.4).
- Late eCPR penalties are $100 per day up to $5,000 per project, and none can be levied until 14 days after the 30 day deadline, under [Labor Code 1771.4(a)(3)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1771.4).
- Your PWCR number is your public works contractor registration number, and DIR charges [$400, $800 or $1,200](https://www.dir.ca.gov/Public-Works/Contractor-Registration.html) to register or renew for one, two or three fiscal years running July 1 to June 30.
- DIR's own pages say project registration was [formerly known as PWC-100](https://www.dir.ca.gov/Public-Works/SupportCenter.html), and [the legacy PWC-100, PWCR and eCPR applications now redirect to the new system](https://www.dir.ca.gov/Public-Works/DIRs-Modernized-Public-Works-Website-Services.html).
- Projects run by the legacy labor compliance programs of Caltrans, the City of Los Angeles, LAUSD and the County of Sacramento, and projects under qualifying project labor agreements, are [exempt from reporting to DIR](https://www.dir.ca.gov/Public-Works/eCPR_exemptions.html) until further notice.
- When no work was performed in a payroll week, DIR's [XML guidelines](https://www.dir.ca.gov/Public-Works/CPR/eCPR-XML-Guidelines-V2.pdf) say to set statementOfNP to true and add no employee information.

## The terms people search most

### What does eCPR mean? What is eCPR filing?

eCPR stands for electronic certified payroll record. [Labor Code 1771.4](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1771.4) requires each contractor and subcontractor to furnish its certified payroll records directly to the Labor Commissioner, electronically on DIR's website, at least monthly. The statute defines monthly as a submission at least once every 30 days while work is performed, and within 30 days after the last day of work. DIR's [certified payroll page](https://www.dir.ca.gov/public-works/certified-payroll-reporting.html) offers two ways to file: enter payroll online, or upload an XML file built to the V2 schema. The step-by-step version is in [the eCPR system guide](https://wellstanding.com/guides/dir-ecpr-system/).

A late eCPR costs $100 for each day of violation, up to $5,000 per project. The Labor Commissioner cannot levy it until the records are 14 days late, and it falls only on the contractor that failed to file (all under [Labor Code 1771.4(a)(3)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1771.4)). This is separate from the records-request penalty under Labor Code 1776, covered below.

### Who does not file an eCPR with DIR?

DIR says only projects monitored and enforced by an [approved labor compliance program](https://wellstanding.com/data/california-labor-compliance-programs/), or covered by a qualifying project labor agreement, may be exempted. [Until further notice](https://www.dir.ca.gov/Public-Works/eCPR_exemptions.html), the exempt projects are those under the legacy programs of Caltrans, the City of Los Angeles, Los Angeles Unified School District and the County of Sacramento, plus qualifying project labor agreement projects. Under [subdivision (b)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1771.4) the Labor Commissioner may grant the exemption to an awarding body that has enforced an approved program continuously since December 31, 2011, or that has a binding collective bargaining agreement with a wage dispute mechanism. See [who is exempt from certified payroll in California](https://wellstanding.com/guides/who-is-exempt-from-certified-payroll-california/).

### What is a PWCR number? What does PWCR stand for?

PWCR is the name of DIR's legacy contractor registration system, and your PWCR number is your public works contractor registration number. DIR's [modernized services page](https://www.dir.ca.gov/Public-Works/DIRs-Modernized-Public-Works-Website-Services.html) tells contractors creating a new account to enter their PWCR number so their registration status is maintained. Registration runs by fiscal year, July 1 to June 30. DIR's [registration page](https://www.dir.ca.gov/Public-Works/Contractor-Registration.html) lists $400, $800 or $1,200 to register or renew for one, two or three years. If you bid on, were awarded, or worked on a public works project after your registration lapsed, a late renewal between July 1 and September 30 carries a $400 penalty when the lapse was accidental and $2,000 when it was not; after September 30 the penalty is $2,000 if you did any of those things in the past 12 months while unregistered. Renewal steps are in [DIR contractor registration renewal](https://wellstanding.com/guides/dir-contractor-registration-renewal/).

### What is PWC-100, and how is it different from the DIR project ID?

PWC-100 is the old name for project registration, which the awarding body files. DIR's [Support Center](https://www.dir.ca.gov/Public-Works/SupportCenter.html) calls project registration "formerly known as PWC-100," and DIR's [modernized services page](https://www.dir.ca.gov/Public-Works/DIRs-Modernized-Public-Works-Website-Services.html) says the legacy PWC-100, PWCR and eCPR applications redirect to the new system, where you register a new account. Each registered project has a unique DIR project ID, which DIR's [FAQ](https://www.dir.ca.gov/Public-Works/PublicWorksSB854FAQ.html) says you can find by searching project name, project ID or awarding body in the [DIR Public Works portal](https://services.dir.ca.gov/pw). That ID is what your eCPR files against. See [PWC-100 explained](https://wellstanding.com/guides/pwc-100-explained/) and [how to find your DIR project ID](https://wellstanding.com/guides/find-dir-project-id/).

### What is Form A-131 (A-1-131)?

Searchers write it A131, A-131 or "DIR A131." The form is the [Public Works Payroll Reporting Form](https://www.dir.ca.gov/dlse/forms/pw/dlseforma-1-131.pdf), DLSE's A-1-131, listed with the other [DLSE public works forms](https://www.dir.ca.gov/dlse/DLSE-Forms-PW.htm). It has columns for each worker's name, classification, hours worked each day, hourly rate, gross pay, deductions and net wages. Under [Labor Code 1776(c)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1776), records not filed directly with the Labor Commissioner must be on DLSE's forms or contain the same information, and printouts of payroll data work if they carry the same information and the signed declaration. On projects that file in DIR's system you enter the same data there. See [Form A-1-131 block by block](https://wellstanding.com/guides/form-a-1-131-public-works-payroll-reporting-form/).

### What is Labor Code 1776?

It is the records statute. Each payroll record carries a declaration under penalty of perjury that it is true and correct and that the employer complied with the prevailing wage requirements. If you do not comply within 10 days of a written request for the records, you forfeit $100 for each calendar day, or portion of a day, for each worker until you comply, and DLSE can have that withheld from progress payments ([subdivision (h)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1776)). From January 1, 2027, [SB 909](https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202520260SB909) raises it to $140; see [what SB 909 changes](https://wellstanding.com/guides/sb-909-prevailing-wage-penalty-increases-2027/) and [Labor Code 1776 explained](https://wellstanding.com/guides/california-labor-code-1776/).

### What is a statement of non-performance?

It is how you report a payroll week with no work on a project. DIR's [eCPR XML guidelines](https://www.dir.ca.gov/Public-Works/CPR/eCPR-XML-Guidelines-V2.pdf) say to set statementOfNP to true when no work was performed during the payroll week, and to add no employee information. See [no work performed weeks](https://wellstanding.com/guides/certified-payroll-no-work-performed/).

WellStanding prepares the WH-347 and the eCPR from the payroll export you already run, and a person reviews every filing. You review the finished filing and sign the certification in one step, and nothing is filed until you have signed; we never sign for you.

## The full glossary

**Certified payroll**
A payroll report signed under penalty of perjury, stating what each worker on a public works project was paid, in the detail and format the government requires. The signature is what makes it certified. See [the complete guide](https://wellstanding.com/guides/california-certified-payroll/).

**Prevailing wage**
The minimum wage package, base rate plus fringe benefits, that must be paid on public works, set by craft and locality in published determinations. What you must pay; certified payroll is how you prove you paid it. See [the distinction explained](https://wellstanding.com/guides/prevailing-wage-vs-certified-payroll/). See also [Labor Code 1771](https://wellstanding.com/guides/labor-code-1771-prevailing-wage-requirement/).

**Wage determination**
The published document stating prevailing rates for each craft in each locality, including fringe amounts and any predetermined increases. California determinations come from DIR; federal ones from the U.S. DOL under Davis-Bacon.

**DIR**
The California Department of Industrial Relations, the state agency that runs contractor registration, project registration, prevailing wage determinations, and the eCPR system, and whose Labor Commissioner enforces all of it.

**eCPR**
Electronic Certified Payroll Record: California's required electronic filing of certified payroll, submitted directly to DIR at least monthly on non-exempt public works. Filed through DIR's portal with the online form or by XML upload. See [the eCPR system explained](https://wellstanding.com/guides/dir-ecpr-system/). See also [how to confirm DIR received your eCPR submission](https://wellstanding.com/guides/ecpr-submission-status-accepted-california/).

**Online form (manual submission)**
The path for eCPR filing where you enter the payroll information directly using the online form, as opposed to uploading XML files.

**eCPR XML**
DIR's published file format for uploading certified payroll instead of typing it. Mainstream payroll systems do not produce it; making this file correctly is most of what certified payroll services and add-ons exist to do.

**PWCR**
Public Works Contractor Registration: the DIR registration every contractor and sub needs to work California public works, renewed by fiscal year, July 1 to June 30. Your eCPRs file under it. See [the difference between a DIR number, a PWCR number and a project ID](https://wellstanding.com/guides/dir-number-pwcr-number-project-id-difference/).

**PWC-100**
The project registration an awarding body files with DIR when it awards a public works project, listing the project, the location, and the contractors on it. PWC-100 filings are public data, which is what powers our [requirements pages](https://wellstanding.com/requirements/). See [the PWC-100 explained](https://wellstanding.com/guides/pwc-100-explained/).

**Form A-1-131**
California's own public works payroll reporting form, published by DLSE, the paper ancestor of the eCPR and still the shape of a certified copy when records are requested. See [Form A-1-131 block by block](https://wellstanding.com/guides/form-a-1-131-public-works-payroll-reporting-form/).

**DIR Project ID**
The number DIR assigns a registered public works project. Every eCPR files against one, so collecting your projects' IDs is step one of any filing setup. See [what a DIR number is](https://wellstanding.com/guides/dir-number-pwcr-number-project-id-difference/).

**Awarding body**
The public entity whose project it is: a school district, city, county, university, water district, transit agency, or state department. The awarding body sets the portal requirements and, in four legacy cases, holds the compliance program that changes your DIR duties. See [what an awarding body is](https://wellstanding.com/guides/what-is-an-awarding-body-california-public-works/).

**WH-347**
The federal certified payroll form for Davis-Bacon work, due weekly, with the Statement of Compliance on the back. See [WH-347 line by line](https://wellstanding.com/guides/wh-347/).

**Statement of Compliance**
The signed declaration attached to a weekly certified payroll, certifying correct payment and proper fringe handling, under penalty of federal prosecution. An unsigned certified payroll is just a spreadsheet.

**Davis-Bacon Act**
The federal prevailing wage law covering federally funded or assisted construction, the reason the WH-347 exists and is weekly.

**Fringe benefits**
The non-wage part of the prevailing wage package: health and welfare, pension, vacation and holiday, training. Payable to bona fide plans or as cash on the check, and your certified payroll must show which, correctly, in the right units. See [the fringe benefit statement, with an example](https://wellstanding.com/guides/fringe-benefit-statement/). See also [Labor Code 1773.1 on employer payments](https://wellstanding.com/guides/labor-code-1773-1-employer-payments/).

**Worker classification**
The craft and classification each worker is reported under on certified payroll, which sets the rate that applies. A worker who does two kinds of work in a week is reported under each, with the hours split. See [worker classification on certified payroll](https://wellstanding.com/guides/certified-payroll-worker-classification/), and the pages on [owner operators](https://wellstanding.com/guides/owner-operator-certified-payroll/) and [sole proprietors with no employees](https://wellstanding.com/guides/sole-proprietor-certified-payroll/).

**Overtime, shift, and holiday pay**
Premium rates the prevailing wage determination sets for hours beyond the daily or weekly limits, for shifts, and for holidays, each of which certified payroll must show at the right rate. See [overtime, shift, and holiday pay under prevailing wage](https://wellstanding.com/guides/overtime-shift-holiday-prevailing-wage/).

**LCPtracker**
The most widely mandated third-party labor compliance portal among California awarding bodies. An LCPtracker upload answers the awarding body; it does not satisfy the state's eCPR duty. See [LCPtracker vs DIR](https://wellstanding.com/guides/lcptracker-vs-dir/).

**Elation Systems**
A labor compliance portal used by awarding bodies including BART. Same rule as every portal: additive to the DIR filing, not a substitute.

**PRISM**
The compliance system the City of San Diego uses as its certified payroll system of record. Additive to the DIR filing.

**OCPS**
The City of Los Angeles' own online certified payroll system, run by its Bureau of Contract Administration, which bars substitutes. LA City is also a legacy LCP holder, which changes the DIR side.

**Labor Compliance Program (LCP)**
An awarding body's DIR-approved in-house enforcement program. Projects under the four legacy programs (Caltrans, City of LA, LAUSD, Sacramento County) are, until DIR says otherwise, [exempt](https://www.dir.ca.gov/Public-Works/eCPR_exemptions.html) from the direct DIR eCPR filing, as are qualifying project labor agreement projects. School districts run many of the programs a sub meets; see [school district labor compliance programs](https://wellstanding.com/guides/school-district-labor-compliance-program/).

**Compliance Monitoring Unit (CMU)**
The DIR unit that reviews certified payroll on public works and sends audit letters when the records do not add up. See [what to do with a CMU audit letter](https://wellstanding.com/guides/dir-compliance-monitoring-unit-audit-letter/).

**Noncompliance letter**
A written notice from an awarding body, its compliance program, a prime contractor, or DIR that your certified payroll is late, missing, or wrong, with a deadline to cure. See [what to do when one arrives](https://wellstanding.com/guides/certified-payroll-noncompliance-letter/).

**Notice of Withholding of Contract Payments**
The notice that contract payments are being held back over a prevailing wage or reporting violation, the point at which a paperwork problem becomes a cash problem. See [the notice of withholding, explained](https://wellstanding.com/guides/notice-of-withholding-contract-payments/).

**Civil Wage and Penalty Assessment**
The Labor Commissioner's formal assessment of unpaid wages and penalties on a public works project, which starts the clock on a request for review. See [how to appeal a certified payroll penalty](https://wellstanding.com/guides/appeal-certified-payroll-penalty-california/).

**Debarment**
Losing the right to bid on or work public works for a period after a prevailing wage violation. See [prevailing wage debarment in California](https://wellstanding.com/guides/prevailing-wage-debarment-california/).

**Flow-down clause**
The contract language that passes the prime's public works duties, certified payroll included, down to each subcontractor. See [flow-down clauses and certified payroll](https://wellstanding.com/guides/subcontractor-flow-down-clause/).

**Records retention**
How long certified payroll and its supporting records must be kept after a public works project. See [how long to keep certified payroll records](https://wellstanding.com/guides/certified-payroll-records-retention-period/) and [the audit-ready recordkeeping checklist](https://wellstanding.com/guides/prevailing-wage-recordkeeping-checklist/).

**Labor Code 1771.4**
The statute requiring contractors and subs to furnish certified payroll directly to the Labor Commissioner through DIR's electronic system, at least monthly, since 2016.

**Labor Code 1776**
The certified payroll records statute: keep accurate records, produce them within 10 days of a written request, or forfeit $100 per worker per calendar day (from January 1, 2027, [SB 909](https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202520260SB909) raises this to $140; see [what SB 909 changes](https://wellstanding.com/guides/sb-909-prevailing-wage-penalty-increases-2027/)), collectible from your progress payments. See [Labor Code 1776 explained](https://wellstanding.com/guides/california-labor-code-1776/), subdivision by subdivision, and [penalties explained](https://wellstanding.com/guides/certified-payroll-penalties-california/).

**Non-performance payroll**
The filing that covers a week with no work on a project. Required so your payroll sequence has no gaps; the eCPR format supports it directly. See [no work performed weeks](https://wellstanding.com/guides/certified-payroll-no-work-performed/).

**Amendment**
A corrected refiling of an already-submitted eCPR. In DIR's system an amendment must match the original filing's identifying fields, or it creates a new payroll instead of replacing the wrong one. See [how to amend a certified payroll report](https://wellstanding.com/guides/correct-certified-payroll-report/).

**Small project exemption**
The contract size below which some public works duties do not apply. The thresholds differ by duty, so check each one. See [project thresholds and the small project exemption](https://wellstanding.com/guides/prevailing-wage-project-thresholds/).

**DAS 140 and DAS 142**
California apprenticeship forms: the [DAS 140](https://wellstanding.com/guides/das-140-form/) notifies applicable apprenticeship committees of the contract, the DAS 142 requests dispatch of apprentices. Separate from certified payroll, with their own deadlines and penalties.

**Progress payment**
The periodic payment on a construction contract as work completes. On public works it doubles as the enforcement lever: certified payroll problems freeze it, which is usually how a paperwork issue first becomes a cash issue.

## Questions

**What does eCPR stand for?**

Electronic certified payroll record. It is the certified payroll that Labor Code 1771.4 requires contractors and subcontractors to send electronically to the Labor Commissioner at least once every 30 days on non-exempt public works.

**Is PWCR the same as the DIR number?**

No. The PWCR number identifies your company's contractor registration. The DIR project ID identifies a registered project, and DIR says project registration was formerly known as PWC-100.

**Is A131 the same as A-1-131?**

Yes. A131, A-131 and A 131 are all shorthand for DLSE's Public Works Payroll Reporting Form, A-1-131.

**Do I still use the PWC-100 form?**

The awarding body registers the project. DIR says project registration was formerly known as PWC-100 and that the legacy application redirects to the new system. As a contractor you look up the project ID and link your company to the project.

**How often must an eCPR be filed?**

At least once every 30 days while work is performed on the project, and within 30 days after the final day of work, unless your contract with the awarding body requires more often.

**Where do I see the full rules on a term?**

Each definition links to the guide that covers it, and each guide links its primary sources.

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [Labor Code 1771.4](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1771.4) leginfo.legislature.ca.gov
2. [Labor Code 1776](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1776) leginfo.legislature.ca.gov
3. [DIR certified payroll page](https://www.dir.ca.gov/public-works/certified-payroll-reporting.html) dir.ca.gov
4. [$400, $800 or $1,200](https://www.dir.ca.gov/Public-Works/Contractor-Registration.html) dir.ca.gov
5. [formerly known as PWC-100](https://www.dir.ca.gov/Public-Works/SupportCenter.html) dir.ca.gov
6. [the legacy PWC-100, PWCR and eCPR applications now redirect to the new system](https://www.dir.ca.gov/Public-Works/DIRs-Modernized-Public-Works-Website-Services.html) dir.ca.gov
7. [exempt from reporting to DIR](https://www.dir.ca.gov/Public-Works/eCPR_exemptions.html) dir.ca.gov
8. [XML guidelines](https://www.dir.ca.gov/Public-Works/CPR/eCPR-XML-Guidelines-V2.pdf) dir.ca.gov
9. [FAQ](https://www.dir.ca.gov/Public-Works/PublicWorksSB854FAQ.html) dir.ca.gov
10. [DIR Public Works portal](https://services.dir.ca.gov/pw) services.dir.ca.gov
11. [Public Works Payroll Reporting Form](https://www.dir.ca.gov/dlse/forms/pw/dlseforma-1-131.pdf) dir.ca.gov
12. [DLSE public works forms](https://www.dir.ca.gov/dlse/DLSE-Forms-PW.htm) dir.ca.gov
13. [SB 909](https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202520260SB909) leginfo.legislature.ca.gov

## Related

- [eCPR filing explained](https://wellstanding.com/guides/dir-ecpr-system/)
- [PWC-100 explained](https://wellstanding.com/guides/pwc-100-explained/)
- [Form A-1-131 block by block](https://wellstanding.com/guides/form-a-1-131-public-works-payroll-reporting-form/)
- [DIR contractor registration renewal](https://wellstanding.com/guides/dir-contractor-registration-renewal/)
- [How to find your DIR project ID](https://wellstanding.com/guides/find-dir-project-id/)
- [Labor Code 1776 explained](https://wellstanding.com/guides/california-labor-code-1776/)
