# Does Davis-Bacon cover demolition, and when does it not?

This page reads the demolition paragraph of [29 CFR 5.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.2) (eCFR, up to date as of November 5, 2026), DOL's [2023 final rule](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations) and [HUD Notice LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf).

Last reviewed November 6, 2026 against the sources it cites

The short answer

Demolition on its own is generally not covered by Davis-Bacon. It is covered in three cases under 29 CFR 5.2: the work itself is alteration or repair, covered construction is contemplated at the site (same contract or a later one), or a statute requires it. Check the plans, funding and site plans before you bid.

- Under [29 CFR 5.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.2), paragraph (2)(v), demolition and removal is covered in three circumstances: (A) the work itself is construction, alteration or repair, (B) covered construction is contemplated at the site, and (C) a statute requires it.
- Paragraph (2)(v)(B) applies when covered construction is contemplated "either as part of the same contract or as part of a future contract," so a separate demolition bid can still be covered ([29 CFR 5.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.2)).
- The demolition paragraph took effect October 23, 2023 and the final rule applies to contracts entered into after that date ([88 FR 57526](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations)); the [August 2023 text](https://www.ecfr.gov/on/2023-08-23/title-29/subtitle-A/part-5/subpart-A/section-5.2) of 5.2 has no demolition paragraph.
- HUD's [Notice LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf) (August 12, 2009) says the demolition rule is the same whether HUD funds or other funds pay for it.
- The [June 24, 2026 final judgment](https://storage.courtlistener.com/recap/gov.uscourts.txnd.383006/gov.uscourts.txnd.383006.108.0_1.pdf) vacating parts of the 2023 rule lists a truck driver paragraph, one material supplier sentence and 29 CFR 5.5(e); it does not list the demolition paragraph.

## The short rule

Demolition alone is generally not Davis-Bacon work. DOL's final rule says the Attorney General concluded in 1935 that the statute's words "construction, alteration, and/or repair" do not include demolition of existing structures alone, and that DOL has long held standalone demolition is generally not covered ([88 FR 57602 to 57603](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations)). HUD says the same: [Notice LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf) calls demolition by itself "not necessarily considered to be construction, alteration or repair."

The exceptions matter more than the rule. A demolition bid with no wage determination can turn out to be covered if construction follows on the site.

## The three cases where demolition is covered

Paragraph (2)(v) of the "construction, prosecution, completion, or repair" definition in [29 CFR 5.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.2) says demolition and/or removal is covered under any of these circumstances.

| Case | What 5.2 says | Typical example |
| --- | --- | --- |
| (A) The work is itself construction, alteration or repair | The activities "themselves constitute construction, alteration, and/or repair of an existing building or work." | Removing asbestos, paint, components, systems or parts from a facility that will not be demolished. Hazardous waste, land recycling or reclamation contracts with substantial earth moving, contaminated soil removal, re-contouring or habitat restoration. |
| (B) Covered construction is contemplated at the site | Covered construction is contemplated "either as part of the same contract or as part of a future contract." | A building is razed, and a federally funded or federally assisted new building is planned for the lot. |
| (C) A statute requires it | "Where otherwise required by statute." | HUD's notice points to the Housing Act of 1949 urban renewal program. |

HUD's notice calls statutory coverage one of "very few exceptions" and gives the 1949 Act as its example ([LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf), footnote 2). I did not find a list of other statutes in the sources I read, so ask the funding agency which statute governs your money.

## The demolition-then-construction test

Case (B) is the one that catches people. Read it as three questions.

1. **Is construction planned or contemplated at the same site?** It can be in your contract or in a later one. A separate demolition bid does not take you outside the rule.
2. **Would that construction be covered by labor standards?** 5.2 says "covered in whole or in part by the labor standards in this part." On the plain reading of that text, the later construction has to be covered by some labor standards under the rule.
3. **Is there evidence it is contemplated?** 5.2 lists factors, "but not limited to": engineering or architectural plans or surveys of the site; the allocation of, or an application for, Federal funds; contract negotiations or bid solicitations; the stated intent of the relevant government officials; and the disposition of the site after demolition.

HUD's notice reaches the same place from the program side. It says coverage "would necessarily involve knowledge" of the later covered construction, and that this implies "documented evidence," such as specifications, disposition plans, budgets and applications for assistance ([LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf)). It adds that CDBG money spent on demolition can trigger coverage when the later construction is paid from other sources, and tells readers to contact HUD Labor Relations staff in that case.

### Examples DOL gave

In the 2023 preamble, DOL said coverage may apply to removing and disposing of contaminated soil to prepare for a building, or demolishing a parking lot for a future public park. It said coverage likely would not apply to demolishing an abandoned, dilapidated or condemned building to remove a public hazard, to reduce squatters, or to make land more attractive to private buyers for purely private construction ([88 FR 57603](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations)). The preamble is DOL's explanation, not the regulation itself.

## What the 2023 rule changed

DOL added paragraph (2)(v) in the 2023 rule. It said the language "is not an expansion of Davis-Bacon coverage" but a codification of existing policy found in earlier guidance, including All Agency Memorandum 190 ([88 FR 57603 to 57604](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations)). Trade groups disagreed. The preamble records the National Demolition Association's objection that the change would expand covered demolition.

| Contract entered into | Where the demolition test sits |
| --- | --- |
| After October 23, 2023 | In the regulation: [29 CFR 5.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.2), paragraph (2)(v). The rule's provisions apply to contracts entered into after that date ([88 FR 57526](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations)). |
| On or before October 23, 2023 | The [August 2023 text](https://www.ecfr.gov/on/2023-08-23/title-29/subtitle-A/part-5/subpart-A/section-5.2) of 5.2 has no demolition paragraph. DOL's guidance carried the same test, as the preamble and HUD's 2009 notice describe. |

DOL's own site refused my automated request for All Agency Memorandum 190, Memorandum 54 and the Field Operations Handbook chapter on this subject. I rely on the preamble and HUD's notice, which cite them.

### The June 2026 judgment

A federal court in Texas vacated parts of the 2023 rule on June 24, 2026. The [final judgment](https://storage.courtlistener.com/recap/gov.uscourts.txnd.383006/gov.uscourts.txnd.383006.108.0_1.pdf) lists three provisions: a truck driver paragraph and a material supplier sentence in 5.2, and all of [29 CFR 5.5(e)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.5), which put the contract clauses into prime contracts by operation of law. The demolition paragraph is not on the list. Section 5.5(e) matters here because it is why a bid that left out the clauses could still carry them, and it only ever applied to contracts entered into after October 23, 2023. The eCFR still prints (e) with no note about the judgment, so check that your contract carries the wage determination and clauses rather than relying on it. The [HUD-4010 guide](https://wellstanding.com/guides/hud-4010-federal-labor-standards-provisions/) shows how the clauses reach a HUD job.

## Character of work: which wage rates apply

If demolition is covered, the next question is which wage determination applies: building, residential, highway or heavy. HUD's notice says the "end result of the work at that site" decides it. Demolishing a 16-story apartment building before 2-story townhomes uses a residential decision. Demolishing an office building before a parking lot uses a highway decision. If the end result is not yet known, such as low-rise or high-rise apartments, a heavy decision applies ([LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf), part III). This is HUD guidance from 2009 for HUD-assisted work. Other agencies may apply their own practice, so ask yours.

## When demolition is not covered

Demolition with no contemplated covered construction is generally outside Davis-Bacon unless case (A) or (C) applies. DOL said coverage likely would not apply to the condemned building example above. Two points follow.

- On a federal contract, uncovered demolition is generally a service contract under the Service Contract Act, and DOL uses Davis-Bacon rates as a basis for that wage determination ([88 FR 57603, footnote 167](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations)).
- Federally funded demolition run by a State or local government that does not meet a Related Act's criteria generally carries no federal prevailing wage requirement (same footnote). State prevailing wage law may still apply; see the [state table](https://wellstanding.com/guides/certified-payroll-requirements-by-state/).

## What to do before you bid or start

1. Look for a wage determination and the federal labor standards clauses in the bid documents. If they are missing on a federally assisted job, ask in writing.
2. Ask the contracting officer or funding agency whether covered construction is planned at the site, and keep the answer. Check the factors above: plans, funding applications, bid solicitations, disposition of the site.
3. Ask whether your scope includes abatement or soil removal that is covered in its own right under case (A).
4. If it is covered, pay the determination rates and submit weekly certified payrolls for each week of covered work ([29 CFR 5.5(a)(3)(ii)(A)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.5)). See the [closeout guide](https://wellstanding.com/guides/davis-bacon-final-certified-payroll-closeout/) for the final payroll.
5. If a Wage and Hour letter arrives claiming back wages, see the [findings letter guide](https://wellstanding.com/guides/davis-bacon-findings-letter-response-alj-hearing/). On public housing work, see [housing authority certified payroll](https://wellstanding.com/guides/housing-authority-certified-payroll/).

We prepare certified payroll for public works contractors. Tell us about your project.

## Questions

**Is demolition covered by Davis-Bacon if it is a separate contract from the new building?**

It can be. Paragraph (2)(v)(B) of [29 CFR 5.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.2) covers demolition where covered construction is contemplated at the site "as part of a future contract."

**Does the rule change if HUD money is not involved?**

HUD says the demolition principle is the same whether HUD funds or other funds pay for it ([LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf)). Under the plain reading of paragraph (B), what matters is whether the later construction is "covered in whole or in part by the labor standards in this part."

**Is asbestos removal covered?**

Under case (A), removing asbestos, paint, components, systems or parts from a facility that will not be demolished is covered because the removal is itself alteration or repair ([29 CFR 5.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.2)). Section 5.2 names removal from a facility that will not be demolished as the example under (A), and (B) covers "demolition or removal" where covered construction is contemplated at the site. Ask the agency how it treats abatement ahead of a demolition.

**Did the 2023 rule expand coverage of demolition?**

DOL says no: it called the language a codification of current policy ([88 FR 57603 to 57604](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations)). Some commenters disagreed. The text applies to contracts entered into after October 23, 2023.

**Which wage determination applies to covered demolition?**

On HUD-assisted work, the one that matches the end result at the site, with a heavy decision if the end result is not known yet ([LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf)). Ask your contracting agency which classification it used.

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [29 CFR 5.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.2) ecfr.gov
2. [2023 final rule](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations) federalregister.gov
3. [HUD Notice LR-09-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2009-01.pdf) hud.gov
4. [August 2023 text](https://www.ecfr.gov/on/2023-08-23/title-29/subtitle-A/part-5/subpart-A/section-5.2) ecfr.gov
5. [June 24, 2026 final judgment](https://storage.courtlistener.com/recap/gov.uscourts.txnd.383006/gov.uscourts.txnd.383006.108.0_1.pdf) storage.courtlistener.com
6. [29 CFR 5.5(e)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.5) ecfr.gov

## Related

- [HUD-4010 federal labor standards provisions](https://wellstanding.com/guides/hud-4010-federal-labor-standards-provisions/)
- [Housing authority certified payroll](https://wellstanding.com/guides/housing-authority-certified-payroll/)
- [Responding to a Wage and Hour findings letter](https://wellstanding.com/guides/davis-bacon-findings-letter-response-alj-hearing/)
- [The final certified payroll and closeout](https://wellstanding.com/guides/davis-bacon-final-certified-payroll-closeout/)
- [Certified payroll requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/)