title: Davis-Bacon Wage Determination on SAM.gov | WellStanding
url: https://wellstanding.com/guides/davis-bacon-wage-determination-lookup-sam/
description: Find the Davis-Bacon wage determination in your contract, pull it on SAM.gov, and check whether a modification applies: the 10-day, 90-day and post-award rules.
updated: 2026-11-06
type: guide
publisher: WellStanding Certified Payroll
---
# Finding the right Davis-Bacon wage determination on SAM.gov

This page covers which Davis-Bacon wage determination governs your payroll and when a later modification applies. It rests on [29 CFR 1.6](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6) (eCFR, up to date as of November 3, 2026) and the [SAM.gov wage determinations page](https://sam.gov/content/wage-determinations).

Last reviewed November 6, 2026 against the sources it cites

The short answer

Use the wage determination, with its modification number and date, attached to your contract. Once incorporated, it generally governs for the contract's life, so the newest revision may not be yours. On SAM.gov, search by WD number or pick Public Buildings or Works. On contracts entered into after October 23, 2023, a later revision applies if issued before award under the bid-opening rules, or with a change order, option, anniversary, DOL correction or missing-determination fix; earlier contracts differ.

- A wage determination incorporated into a contract generally applies for the duration of the contract or project, except as the rest of the section provides ([29 CFR 1.6(a)(1)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)).
- On a sealed-bid contract, on contracts entered into after October 23, 2023, a revision issued at least 10 calendar days before bid opening applies, and one issued later applies unless the agency finds there is no reasonable time to notify bidders ([29 CFR 1.6(c)(2)(ii)(A)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)).
- On contracts entered into after October 23, 2023, if a sealed-bid contract is not awarded within 90 days after bid opening, any revised general determination issued before award applies unless the agency head obtains an extension from the Administrator ([29 CFR 1.6(c)(2)(ii)(D)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)).
- A revision issued after award is generally not effective, except for a change order adding substantial work or time, an option exercise, and the anniversary update on open-ended contracts ([29 CFR 1.6(c)(2)(iii)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)).
- The SAM.gov [wage determinations page](https://sam.gov/content/wage-determinations) offers a Search by WD Number box with a Show active only option, and a Public Buildings or Works category for Davis-Bacon determinations.
- Except for 1.6(c)(2)(iii), the 2023 rule applies only to contracts entered into after October 23, 2023 ([88 FR 57526](https://www.govinfo.gov/content/pkg/FR-2023-08-23/html/2023-17221.htm)).

## Your contract's determination governs, not the newest one on SAM.gov

Your contract clause ties pay to "the wage determination of the Secretary of Labor which is attached hereto and made a part hereof" ([29 CFR 5.5(a)(1)(i)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.5)). Once incorporated, a determination "generally applies for the duration of the contract or project, except as specified in this section" ([29 CFR 1.6(a)(1)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)). So the revision on SAM.gov today may not be the one you owe.

1. **Open the determination attached to your contract or subcontract.** A prime must pass the applicable determinations down in each subcontract ([29 CFR 5.5(a)(6)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.5)).
2. **Write down** the WD number, the modification number and date, the counties listed, and the construction type.
3. **If you do not have it, ask the prime or agency in writing** which determination and revision went into the contract. Agencies make the first call and must incorporate it (1.6(b)(1)), but the contractor "has an affirmative obligation to ensure that its pay practices are in compliance" (1.6(b)(2)).

## How to pull a determination on SAM.gov

These steps follow the [SAM.gov page](https://sam.gov/content/wage-determinations) as it read in early November 2026.

1. **Know the number?** Use Search by WD Number, which sits beside a Show active only box. A revised, superseded or canceled determination becomes inactive, and inactive ones can still be viewed on the website "for informational purposes only" ([1.6(a)(2)(iii)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)). If your contract's revision has been replaced, make sure that box is not ticked.
2. **Do not know it?** Choose Public Buildings or Works, the category the page describes as wage rates for laborers and mechanics under the Davis-Bacon Act. Service Contracts is the Service Contract Act category.
3. **Check each result.** A general determination lists rates "for specified type(s) of construction in a given area" ([1.5(a)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.5)). Then match its revision to the number and modification date from your contract.
4. **Watch for revisions.** The page links help articles titled "Follow a wage determination" and "Save searches," and the FAR names an Alert Service for monitoring ([FAR 22.404-6(a)(3)](https://www.acquisition.gov/far/22.404-6)).

## Pick the right county and construction type

"Area" is the city, town, village, county or other civil subdivision where the work is performed. For highways it may be a state DOT highway district, and a multi-county project may use all its counties ([29 CFR 1.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.2)). Construction type is the category DOL uses to publish general determinations, and section 1.2 lists building, residential, heavy and highway as examples. [FAR 22.404-2(c)](https://www.acquisition.gov/far/22.404-2) gives the Wage and Hour Division's general guidelines.

| Type | General guideline |
| --- | --- |
| Building | Enclosed structures with walk-in access, with incidental grading, utilities and paving, unless area practice differs |
| Residential | Single family houses or apartment buildings of no more than four stories, with incidental site work and utilities, unless area practice differs |
| Highway | Roads, streets, runways, taxiways, parking areas and similar work not incidental to the other types |
| Heavy | The catch-all for what is not building, residential or highway, such as dams or sewer line |

A contract with more than one type "anticipated to be substantial" must carry the determination for each, and the agency designates the work each covers (1.6(b)(1)). SAM.gov's [All Agency Memorandums list](https://sam.gov/content/wage-determinations/resources/all-agency-memos) shows AAM 236 (December 14, 2020), which generally treats other-category work as substantial above 20 percent of total contract costs or $2.5 million, and the same listing shows AAM 251 (August 15, 2025), titled an update to the $2.5 million threshold. This page did not read the AAM 251 text, so ask the agency which dollar figure it applied.

You do not choose the type. Questions about applying a determination "must be referred to the Administrator for resolution" (1.6(b)(3)); SAM.gov's [Labor Advisors page](https://sam.gov/wage-determinations/resources/labor-advisors) lists the federal agency Labor Advisors, whom your contracting agency can consult. Start with the prime or agency.

## When a modification applies to your contract

A revised determination replaces the earlier one. "Revision" covers changed rates and a full re-issue ([1.6(c)(1)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)). Whether it reaches your contract depends on when it was "issued": the publication date on the DOL-approved website for a general determination, or the date the agency receives written notice for a project determination (1.6(c)(2)(i)).

| When the revision was issued | Does it apply? | Source |
| --- | --- | --- |
| Before award (or before construction starts if there is no award) | Yes, except the sealed-bid and housing cases noted below | 1.6(c)(2)(ii) |
| Sealed bids: 10 or more calendar days before bid opening | Yes | 1.6(c)(2)(ii)(A) |
| Sealed bids: under 10 days before bid opening | Yes, unless the agency finds there is no reasonable time to notify bidders and records it in the contract file | 1.6(c)(2)(ii)(A) |
| Sealed bids: after bid opening, before award | Under 1.6(c)(2)(ii) the revision is effective and no report is required. FAR 22.404-6(b)(2) says such a modification "shall not be effective." The two conflict, see below | 1.6(c)(2)(ii)(A); FAR 22.404-6(b)(2) |
| Sealed bids: no award within 90 days after bid opening | Any revised general determination issued before award applies, unless the Administrator grants the agency head an extension | 1.6(c)(2)(ii)(D) |
| After award (or after construction starts if there is no award) | No, except the cases below | 1.6(c)(2)(iii) |

### The post-award exceptions

- **A change adding substantial work outside the original scope or time not originally obligated, including an option exercise.** The agency must include the most recent revision at that time (1.6(c)(2)(iii)(A)). More time to finish the original commitment, or merely incidental added work, does not count.
- **Open-ended contracts** such as indefinite-delivery construction, long-term operations and maintenance, and schedule contracts. The most recent revision applies on each anniversary of award, unless DOL approved another process, to work that begins or is obligated in the next 12 months, until it is complete (1.6(c)(2)(iii)(B)).

DOL can correct clerical errors at any time, retroactive to the start of construction ([1.6(d)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)). If a contract lacks the correct determination, the agency must either terminate and resolicit or incorporate it, retroactive to award unless the Administrator directs otherwise (1.6(f)(3)(i)), and the contractor must be compensated for increases from a missing one (1.6(f)(3)(iv)). For National Housing Act and Section 8 projects, the earlier of the start of construction or initial endorsement (or signing of the housing assistance agreement) is the cutoff, and the 90-day rule applies if construction has not begun within 90 days after that endorsement or signing (1.6(c)(2)(ii)(B) to (D)); see our [HUD-4010 guide](https://wellstanding.com/guides/hud-4010-federal-labor-standards-provisions/).

### Where the sources differ

For a general determination, 1.6(c)(2)(i) dates a revision by its website publication. [FAR 22.404-6(a)(3)](https://www.acquisition.gov/far/22.404-6) (FAC 2026-01, effective March 13, 2026) uses the earlier of publication or the agency's receipt of written notice from DOL. The FAR text is written for federal contracting officers. Near award or bid opening, ask the agency which date it used and to refer the question to the Administrator.

The sources also conflict on a revision issued after bid opening and before award. Section 1.6(c)(2)(ii) makes a before-award revision effective for the project and says no report is required if it is issued after bid opening, while [FAR 22.404-6(b)(2)](https://www.acquisition.gov/far/22.404-6) says a modification published after bid opening shall not be effective. Ask the agency which one it applied, and have it refer the question to the Administrator if you disagree.

## Contracts entered before and after October 23, 2023

The [final rule at 88 FR 57526](https://www.govinfo.gov/content/pkg/FR-2023-08-23/html/2023-17221.htm) took effect October 23, 2023. Except for 1.6(c)(2)(iii), it applies only to contracts entered into after October 23, 2023, and agencies must apply 1.6(c)(2)(iii) to existing contracts of its types, whatever their date, "if practicable and consistent with applicable law." For earlier contracts, the preamble says the terms and regulations in effect when they were entered continue to govern.

| Point | Entered before October 23, 2023 | Entered after |
| --- | --- | --- |
| Revision issued after award | Under the [October 22, 2023 text](https://www.ecfr.gov/on/2023-10-22/title-29/subtitle-A/part-1/section-1.6), a modification published after award "shall not be effective" (1.6(c)(3)(vi)), though 1.6(c)(2)(iii) still reaches option, added-work and open-ended contracts if practicable | 1.6(c)(2)(iii), above |
| How a general revision is dated | The earlier of publication on WDOL or the agency's actual written notice (1.6(c)(3)(v)) | Website publication (1.6(c)(2)(i)) |
| Determination missing from the contract | For contracts entered into before the effective date, the [88 FR 57526 preamble](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations) says DOL will seek to address omissions "solely through the modification provisions" of 1.6(f) | Effective by operation of law (5.5(e)) |

## If the determination has no rate for your classification

Workers are paid the rate for the classification of work actually performed (5.5(a)(1)(i)). If yours is not listed, it needs an approved additional classification. The [SAM.gov DBA conformances page](https://sam.gov/wage-determinations/resources/dba-conformances) describes the procedure, and our [SF-1444 guide](https://wellstanding.com/guides/sf-1444-additional-classification/) covers the form. The right revision's rates then go on your weekly payroll ([WH-347 guide](https://wellstanding.com/guides/wh-347/)). If you used the wrong revision, see [how to correct a certified payroll report](https://wellstanding.com/guides/correct-certified-payroll-report/).

This page is not from DOL, GSA or SAM.gov, and it is not agency support. We prepare certified payroll for public works contractors. Tell us about your project.

## Questions

**Do I use the determination in my contract or the current one on SAM.gov?**

The one incorporated in your contract, plus any later revision that reached it under the rules above (1.6(a)(1)). The current listing governs only if your contract picked it up.

**A modification was posted after we were awarded. Do I pay the new rates?**

Generally no (1.6(c)(2)(iii)), unless it came with a change order adding substantial work or time, an option, an open-ended contract anniversary, or a DOL clerical correction (1.6(d)). Ask the agency in writing.

**Does a project wage determination expire?**

It is effective for 180 calendar days from its date, and it is void if it is not incorporated into a contract in that period ([1.6(a)(3)(i)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6)). A general determination has no expiration date (1.6(a)(2)(i)).

**What if the determination in my contract is the wrong one?**

The agency must either terminate and resolicit or incorporate the correct one, retroactive to award unless the Administrator directs otherwise (1.6(f)(3)). The table above shows how earlier contracts differ.

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [29 CFR 1.6](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.6) ecfr.gov
2. [SAM.gov wage determinations page](https://sam.gov/content/wage-determinations) sam.gov
3. [88 FR 57526](https://www.govinfo.gov/content/pkg/FR-2023-08-23/html/2023-17221.htm) govinfo.gov
4. [29 CFR 5.5(a)(1)(i)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/section-5.5) ecfr.gov
5. [1.5(a)](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.5) ecfr.gov
6. [FAR 22.404-6(a)(3)](https://www.acquisition.gov/far/22.404-6) acquisition.gov
7. [29 CFR 1.2](https://www.ecfr.gov/current/title-29/subtitle-A/part-1/section-1.2) ecfr.gov
8. [FAR 22.404-2(c)](https://www.acquisition.gov/far/22.404-2) acquisition.gov
9. [All Agency Memorandums list](https://sam.gov/content/wage-determinations/resources/all-agency-memos) sam.gov
10. [Labor Advisors page](https://sam.gov/wage-determinations/resources/labor-advisors) sam.gov
11. [October 22, 2023 text](https://www.ecfr.gov/on/2023-10-22/title-29/subtitle-A/part-1/section-1.6) ecfr.gov
12. [88 FR 57526 preamble](https://www.federalregister.gov/documents/2023/08/23/2023-17221/updating-the-davis-bacon-and-related-acts-regulations) federalregister.gov
13. [SAM.gov DBA conformances page](https://sam.gov/wage-determinations/resources/dba-conformances) sam.gov

## Related

- [SF-1444 additional classification request](https://wellstanding.com/guides/sf-1444-additional-classification/)
- [How to fill out Form WH-347](https://wellstanding.com/guides/wh-347/)
- [A Davis-Bacon Wage and Hour investigation](https://wellstanding.com/guides/davis-bacon-wage-and-hour-investigation/)
- [How to correct a certified payroll report](https://wellstanding.com/guides/correct-certified-payroll-report/)
- [HUD-4010 federal labor standards provisions](https://wellstanding.com/guides/hud-4010-federal-labor-standards-provisions/)
- [When DOL denies a conformance request](https://wellstanding.com/guides/davis-bacon-conformance-denied/)