# Georgia certified payroll: DCA CDBG labor standards and GDOT federal-aid payrolls

This page covers two procedures with published payroll steps: the Department of Community Affairs (DCA) on the CDBG grants it awards and the Georgia Department of Transportation (GDOT) on federal-aid highway contracts. Sources: DCA's [2025 Federal Labor Standards presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) and [CDBG Recipients Manual Appendix 1](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download), and GDOT's [Construction Manual](https://www.dot.ga.gov/partnersmart/business/source/construction/cm001.pdf).

Last reviewed November 6, 2026 against the sources it cites

The short answer

No Georgia state prevailing wage law was found, so certified payroll there comes from federal money. On a DCA-awarded CDBG grant, contractors submit payrolls to the grant recipient, and DCA says construction drawdowns are withheld if the Notice of Contract Action is not submitted. On most GDOT federal-aid highway jobs, when the contract requires payrolls, they go to the Construction Manager, who reviews them.

- The [Georgia Department of Labor's list of employment laws and rules](https://dol.georgia.gov/employment-laws-and-rules) names child labor, new hire reporting and unemployment insurance rules, among others, and no prevailing wage statute.
- DCA's [2025 federal labor standards presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) says contractors submit all payrolls to the grant recipient, and that every payroll is numbered with the last one labeled "Final Payroll".
- DCA's [presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) also says construction drawdowns are withheld if the Notice of Contract Action, with a certified itemized bid tabulation, is not submitted.
- GDOT's [Construction Manual](https://www.dot.ga.gov/partnersmart/business/source/construction/cm001.pdf) (version 2.01, April 2026) says primes and subcontractors submit payrolls within three weeks after the pay period ends, and that payments may be withheld when payrolls are delinquent.
- [29 CFR 5.8(a)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.8), as eCFR shows it current to November 5, 2026, sets overtime liquidated damages at $33 per calendar day for each underpaid worker, while DCA's [presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) still prints $10.
- GDOT's undated [Special Notice to Contractors](https://www.dot.ga.gov/PartnerSmart/Business/Documents/ElectronicPayroll/CRLMS_NoticeToContractors.pdf) says AASHTOWare Project CRLMS will replace its manual payroll collection, and that CRLMS does not replace a contractor's own payroll system.

## Does Georgia require certified payroll?

No Georgia state prevailing wage law was found. That is a finding from absence: the [Georgia Department of Labor's list of employment laws and rules](https://dol.georgia.gov/employment-laws-and-rules) names child labor, new hire reporting and unemployment insurance rules, among others, and no prevailing wage statute. Certified payroll comes from federal money under the [Davis-Bacon and Related Acts](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download). See the [state-by-state table](https://wellstanding.com/guides/certified-payroll-requirements-by-state/) and the [WH-347 guide](https://wellstanding.com/guides/wh-347/) for the federal rule.

| Money behind the job | What the source says about payroll |
| --- | --- |
| CDBG grant awarded by DCA | Payrolls [go to the grant recipient](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download), the CDBG recipient named on DCA's [Appendix 1 forms](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download). |
| Federal-aid highway contract (GDOT) | On most federal-aid contracts, when the contract requires payrolls, they [go to the project's Construction Manager](https://www.dot.ga.gov/partnersmart/business/source/construction/cm001.pdf). |
| Local project with federal-aid highway money | The local agency does labor interviews and payroll inspections ([LAP Manual](https://www.dot.ga.gov/PartnerSmart/DesignManuals/LocalAdministeredProjectLAP/GDOT-LAP-Manual.pdf) section 4.11, a chapter dated 8/27/24 in a manual whose cover reads Rev 3.7, 11/24/2025). |

## DCA CDBG: the procedure in order

[DCA's presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) gives six steps for construction on a DCA-awarded CDBG grant, and the first four are below. On a CDBG-funded job from any other funding agency, ask that agency for its procedure.

Steps 1 to 3 are the grant recipient's paperwork, not the contractor's: the [Appendix 1 forms](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download) name the CDBG Recipient or Grantee on each form. Your part is to confirm with the grant recipient or its grant administrator that the wage decision, clearance and Notice of Contract Action are done before work starts, and to supply any figures the bid tabulation needs.

1. **Wage decision.** The request, on DCA's [form](https://dca.georgia.gov/document/forms/wage-determination-request-form/download), goes to DCA 30 days before the bid is advertised, a 10-day wage check follows 10 days before bid opening.
2. **Contractor clearance.** Before it enters a contract, the contractor must be cleared as not on the federal debarred list. The [Appendix 1 clearance form](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download) has a line for DCA staff to clear it.
3. **Notice of Contract Action.** Construction drawdowns are withheld if the notice, with a certified itemized bid tabulation, is not submitted to DCA. The deck's step slide points to the [Appendix 1 form](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download) (marked V. 9.2018), and the recipient submits the form within 7 days of contract execution, with the certified bid tabulation attached. DCA's [compliance page](https://dca.georgia.gov/financing-tools/infrastructure/community-development-block-grants-cdbg/compliance-administration-0) still posts an older [2012 version](https://dca.georgia.gov/document/forms/notice-contract-action/download) of the form, with Notice of Award and Start of Construction triggers instead.
4. **Preconstruction conference.** Mandatory. The architect or engineer, grant administrator, contractor and local government attend, and it covers Davis-Bacon and Section 3 (see [Section 3 labor hours](https://wellstanding.com/guides/hud-section-3-labor-hours-reporting/)).

## What the payroll must show

[DCA's presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) lists the usual payroll content (see the [WH-347 guide](https://wellstanding.com/guides/wh-347/)) and deductions permitted by [29 CFR 3.5](https://www.ecfr.gov/current/title-29/subtitle-A/part-3/section-3.5) (see [Copeland Act deductions](https://wellstanding.com/guides/copeland-act-payroll-deductions/)). These points are specific to DCA:

- **Where payrolls go.** Contractors submit all payrolls to the grant recipient, and the prime keeps every subcontractor's payrolls and subcontracts for three years after completion.
- **Final Payroll.** Each payroll is numbered and the last one is labeled "Final Payroll". Digital signatures are acceptable.
- **Sole proprietors and self-employed mechanics.** DCA's slide lists four points: cannot self-certify to wages without a crew; must be reported on "responsible employer" payroll; can certify to hours when working with a crew; only report hours worked and list owner as classification.
- **Job site posting.** The wage decision and the posters must be posted on the job site where employees can view them, protected from the weather.

## Does this reach your job?

[The presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) says Davis-Bacon covers contracts over $2,000 involving federal funds and the entire project, not just the CDBG-funded part, and that overtime rules apply over $100,000.

| Exemption | What the source says |
| --- | --- |
| Residential property under 8 units | [42 U.S.C. 5310(a)](https://www.govinfo.gov/link/uscode/42/5310) covers rehabilitation of residential property only if it has not less than 8 units. |
| Volunteers | [42 U.S.C. 5310(b)](https://www.govinfo.gov/link/uscode/42/5310) exempts an individual who volunteered, gets no pay beyond expenses, reasonable benefits or a nominal fee, and is not otherwise employed at any time in the construction work. |
| Prison labor | [DCA's presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) lists it with a letter from the Department of Corrections, when the grantee uses the labor directly. |

## Missing classifications, interviews and closeout

If the wage decision has no classification for the work, DCA [requires](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) a conformance request. The work cannot fit another classification in the decision, the classification cannot come from another wage decision when multiple wage decisions are used in the contract, and the rate must bear a "reasonable" relationship to existing rates. The request goes to DCA with a signed grantee letter, the wage decision, the prime's SF-1444 and a description of the work (see the [SF-1444 guide](https://wellstanding.com/guides/sf-1444-additional-classification/)).

Payrolls are reviewed for all trades and compared with the wage decision and the job site interviews, which cover a representative number of workers in each classification. DCA lists the HUD-11 on its [compliance page](https://dca.georgia.gov/financing-tools/infrastructure/community-development-block-grants-cdbg/compliance-administration-0) (see the [HUD-11 guide](https://wellstanding.com/guides/hud-11-employee-interview-form/)). Underpayments go on the Final Wage Compliance Report, required at closeout, whose [form](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download) records restitution paid by the contractor or by the recipient from funds withheld from the contractor.

### Overtime damages: $10 or $33?

[DCA's presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) gives Contract Work Hours liquidated damages as $10 per day per violation, which is below the current federal amount. [29 CFR 5.8(a)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.8), current on eCFR to November 5, 2026, sets $33 for each calendar day in the workweek on which a worker worked over 40 hours without required overtime pay, and [29 CFR 5.5(b)(2)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.5) says $33 too. Use the amount written in your contract's Contract Work Hours clause (the 5.5(b)(2) text), and ask the grant administrator which amount DCA will apply, since its presentation still prints $10.

## GDOT federal-aid highway contracts

GDOT's [Construction Manual](https://www.dot.ga.gov/partnersmart/business/source/construction/cm001.pdf) is version 2.01 of April 2026 and embeds FHWA-1273 text revised October 23, 2023. Both predate [FHWA's final rule effective June 10, 2026 and its revised Form FHWA-1273](https://www.fhwa.dot.gov/construction/cqit/form1273.cfm) (see [FHWA-1273 changes in 2026](https://wellstanding.com/guides/fhwa-1273-changes-2026/)), so read the payroll provision in your own contract.

### Where payroll goes and how fast

The manual says GDOT collects payrolls on most federal-aid contracts under the special provision "Required Contract Provisions for Federal-Aid Construction Contracts." The prime gives the project's Construction Manager two copies of weekly payrolls, and electronic submission is preferred. Payrolls are due within three weeks after the pay period ends, and the manual's FHWA-1273 text, paragraph 3.b.(1), says a contractor or subcontractor must submit certified payrolls weekly for each week in which covered work is performed. If payrolls are delinquent, the Construction Manager notifies the contractor that all payments may be withheld until payrolls are current.

### CRLMS, the electronic system

GDOT's [Special Notice to Contractors](https://www.dot.ga.gov/PartnerSmart/Business/Documents/ElectronicPayroll/CRLMS_NoticeToContractors.pdf), which carries no date, says AASHTOWare Project CRLMS will replace manual payroll collection on federal-aid highway contracts that require electronic submission, for primes and all subcontractors. CRLMS does not replace your payroll system: it lets you report what you paid each employee and fringe contributions. Confirm the method with the Construction Manager. See the [AASHTOWare guide](https://wellstanding.com/guides/aashtoware-civil-rights-labor-certified-payroll/).

### Who goes on a GDOT payroll

For truck drivers, the [manual](https://www.dot.ga.gov/partnersmart/business/source/construction/cm001.pdf) says no payroll is required for delivering materials from a remote commercial source, but one is required for drivers working on the job site. An owner-operator working on the site need not show a rate or hours, only the notation "Owner Operator" (see [truck drivers and the site of the work](https://wellstanding.com/guides/davis-bacon-site-of-the-work-truck-drivers/)). The manual also says a trainee in Georgia's on-the-job training program is paid a progressive 60, 75 and 90 percent schedule (see [apprentices and trainees](https://wellstanding.com/guides/davis-bacon-apprentices-and-trainees/)).

### The Certified Payroll Review Form

You do not complete GDOT's [Certified Payroll Review Form](https://www.dot.ga.gov/PartnerSmart/Local/Documents/LAPManual/CertifiedPayrollReviewForm.pdf) (Rev. August 2014). The form says the Project Engineer signs it, while the manual names the Construction Manager, who completes, signs and dates it for every payroll, spot checks included.

## Forms and contacts

DCA posts more than one copy of the WH-347, all marked Rev. Dec. 2008, with printed OMB expiry dates from 2011 to 2024: one [linked from its compliance page](https://dca.georgia.gov/document/forms/davis-bacon-weekly-payroll-report-wh347/download), one [in its manuals](https://dca.georgia.gov/document/manuals/davis-bacon-reporting-form-wh-347/download) and one in [Appendix 1](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download). See [which WH-347 version to use](https://wellstanding.com/guides/which-wh-347-version-to-use/) for the current revision. On a DCA-awarded CDBG grant, start with the grant administrator and [DCA's contact page](https://dca.georgia.gov/organization/about-department-community-affairs/contact-us). On GDOT work, ask the Construction Manager.

We prepare certified payroll for public works contractors. Tell us about your project.

## Questions

**Does Georgia have a prevailing wage law?**

None was found. The [Georgia Department of Labor's list](https://dol.georgia.gov/employment-laws-and-rules) names no prevailing wage statute.

**Where do I send certified payroll on a Georgia CDBG project?**

To the grant recipient, according to [DCA's presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download). DCA's [Appendix 1 forms](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download) name the CDBG recipient on each form.

**What if the Notice of Contract Action is not submitted?**

DCA's [presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) says construction drawdowns are withheld.

**Does GDOT require electronic certified payroll?**

On contracts that require it. The [Construction Manual](https://www.dot.ga.gov/partnersmart/business/source/construction/cm001.pdf) calls electronic submission the preferred method, and GDOT's [notice](https://www.dot.ga.gov/PartnerSmart/Business/Documents/ElectronicPayroll/CRLMS_NoticeToContractors.pdf) says CRLMS will replace manual collection on contracts that require it. Read the payroll provision in your contract for the method it requires.

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [2025 Federal Labor Standards presentation](https://dca.georgia.gov/document/presentations/2025-federal-labor-standards/download) dca.georgia.gov
2. [CDBG Recipients Manual Appendix 1](https://dca.georgia.gov/document/manuals/2025-cdbg-recipients-manual-appendix-1/download) dca.georgia.gov
3. [Construction Manual](https://www.dot.ga.gov/partnersmart/business/source/construction/cm001.pdf) dot.ga.gov
4. [Georgia Department of Labor's list of employment laws and rules](https://dol.georgia.gov/employment-laws-and-rules) dol.georgia.gov
5. [29 CFR 5.8(a)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.8) ecfr.gov
6. [Special Notice to Contractors](https://www.dot.ga.gov/PartnerSmart/Business/Documents/ElectronicPayroll/CRLMS_NoticeToContractors.pdf) dot.ga.gov
7. [LAP Manual](https://www.dot.ga.gov/PartnerSmart/DesignManuals/LocalAdministeredProjectLAP/GDOT-LAP-Manual.pdf) dot.ga.gov
8. [form](https://dca.georgia.gov/document/forms/wage-determination-request-form/download) dca.georgia.gov
9. [compliance page](https://dca.georgia.gov/financing-tools/infrastructure/community-development-block-grants-cdbg/compliance-administration-0) dca.georgia.gov
10. [2012 version](https://dca.georgia.gov/document/forms/notice-contract-action/download) dca.georgia.gov
11. [29 CFR 3.5](https://www.ecfr.gov/current/title-29/subtitle-A/part-3/section-3.5) ecfr.gov
12. [42 U.S.C. 5310(a)](https://www.govinfo.gov/link/uscode/42/5310) govinfo.gov
13. [29 CFR 5.5(b)(2)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.5) ecfr.gov
14. [FHWA's final rule effective June 10, 2026 and its revised Form FHWA-1273](https://www.fhwa.dot.gov/construction/cqit/form1273.cfm) fhwa.dot.gov
15. [Certified Payroll Review Form](https://www.dot.ga.gov/PartnerSmart/Local/Documents/LAPManual/CertifiedPayrollReviewForm.pdf) dot.ga.gov
16. [linked from its compliance page](https://dca.georgia.gov/document/forms/davis-bacon-weekly-payroll-report-wh347/download) dca.georgia.gov
17. [in its manuals](https://dca.georgia.gov/document/manuals/davis-bacon-reporting-form-wh-347/download) dca.georgia.gov
18. [DCA's contact page](https://dca.georgia.gov/organization/about-department-community-affairs/contact-us) dca.georgia.gov

## Related

- [Certified payroll requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/)
- [AASHTOWare CRL certified payroll by state DOT](https://wellstanding.com/guides/aashtoware-civil-rights-labor-certified-payroll/)
- [SF-1444 additional classification requests](https://wellstanding.com/guides/sf-1444-additional-classification/)
- [Which WH-347 version to use](https://wellstanding.com/guides/which-wh-347-version-to-use/)
- [HUD Section 3 labor hours reporting](https://wellstanding.com/guides/hud-section-3-labor-hours-reporting/)