# HUD maintenance wage rates on public housing: how they differ from Davis-Bacon

This page reads [form HUD-5370-C, Section II](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf), [chapter 8 of HUD Handbook 1344.1 REV-3](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf) (January 2023), [notice LR-04-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf) and [24 CFR 905.308](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-905/subpart-C/section-905.308). It covers HUD-determined wages on maintenance work. For Davis-Bacon weekly payroll mechanics, see our [housing authority certified payroll guide](https://wellstanding.com/guides/housing-authority-certified-payroll/).

Last reviewed November 6, 2026 against the sources it cites

The short answer

HUD-determined maintenance wage rates are the minimum wages HUD sets for maintenance laborers and mechanics in the operation of public housing. Under the Capital Fund rule, Davis-Bacon covers development and modernization work over $2,000, except nonroutine maintenance. On a HUD-determined contract you keep payroll records for three years, but HUD's guidance eliminated payroll certification and submission.

- [42 U.S.C. 1437j(a)](https://www.govinfo.gov/link/uscode/42/1437j) requires HUD-determined or adopted wages for maintenance laborers and mechanics employed in the operation of the project, and Davis-Bacon wages for laborers and mechanics in development.
- [24 CFR 905.308(b)(3)](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-905/subpart-C/section-905.308) sits in the Capital Fund rule and puts operations work, including routine and nonroutine maintenance, under HUD-determined rates, and development and modernization work over $2,000 under Davis-Bacon, except nonroutine maintenance.
- [HUD Labor Relations notice LR-04-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf) (issued October 26, 2006) eliminated payroll certification and submission for HUD-determined wages but kept the duty to make and maintain records for 3 years.
- [Form HUD-5370-C](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf) uses Section II for maintenance contracts of $2,000 to $250,000 and [Section I](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C1.pdf) and Section II above $250,000; Section II requires pay at least semi-monthly and three years of records, and neither section has a weekly payroll submission clause.
- Under [Handbook 1344.1 REV-3, paragraph 8-4](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf), an expired maintenance wage decision is void, and decisions run two years from the first day of the housing agency's fiscal year.

## What HUD-determined maintenance wages are

[Section 12(a) of the U.S. Housing Act of 1937, codified at 42 U.S.C. 1437j(a)](https://www.govinfo.gov/link/uscode/42/1437j), splits public housing work in two. Architects, technical engineers, draftsmen and technicians in development, and maintenance laborers and mechanics in the operation of the project, get wages "as determined or adopted" by HUD. Laborers and mechanics in development get wages predetermined by the Secretary of Labor under the Davis-Bacon sections of title 40. The statute counts as development a project of nine or more units assisted under section 8 (42 U.S.C. 1437f) where the housing agency or HUD and the builder or sponsor agree to Davis-Bacon wages before construction or rehabilitation starts.

HUD calls the maintenance rates a maintenance wage decision. The [Handbook](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf) (paragraph 8-1) says these decisions are "administered and enforced similar to" Davis-Bacon standards. They are a different wage schedule with a lighter paperwork load.

The payroll rules below come from HUD guidance and a HUD contract form. The statute sets the wage duty and does not itself list contractor payroll forms. It also says the Secretary "shall require certification as to compliance" with the section before making any payment under the contract. Ask the housing agency what compliance certification your contract requires.

## How HUD-determined wages differ from Davis-Bacon

The Handbook (January 2023) lists two differences in paragraph 8-9: how fast wages must be paid, and what records you keep. It does not mention payroll submission. The elimination of payroll certification and submission comes from [LR-04-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf) (October 26, 2006), which says it stays effective until amended, superseded or rescinded. The 2023 Handbook does not repeat it.

| Item | HUD-determined maintenance wages | Davis-Bacon |
| --- | --- | --- |
| Who sets the rate | HUD, on form HUD-52158 ([Handbook 8-3](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)) | The Secretary of Labor ([1437j(a)](https://www.govinfo.gov/link/uscode/42/1437j)) |
| Pay frequency | No later than one pay period after the period ends, with a pay period no longer than semi-monthly ([8-9(A)](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)) | Covered in our [Davis-Bacon housing guide](https://wellstanding.com/guides/housing-authority-certified-payroll/) |
| Payroll to the agency | Certification and submission eliminated ([LR-04-01, section II](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf)) | Weekly certified payroll, same guide |
| Records | Kept 3 years from completion of the work ([HUD-5370-C, paragraph 3(a)](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf)) | Same guide |

[LR-04-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf) says its relief covers HUD-determined maintenance wages and "does not pertain to construction work subject to Davis-Bacon."

## Does HUD require certified payroll on maintenance work?

Not as a default. [LR-04-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf) says earlier guidance had required weekly certified payroll reports, and that HUD was amending its guidance and form HUD-5370 to eliminate the certification, submission and weekly pay requirements. It adds that HUD was eliminating only the duty to certify and submit. You still create and keep records.

The current form is consistent with that. The applicability box on [form HUD-5370-C](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf) says maintenance contracts, including nonroutine maintenance, of more than $2,000 and up to $250,000 use Section II, and maintenance contracts above $250,000 use [Section I](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C1.pdf) and Section II. Section I holds the general non-construction contract conditions and has no payroll submission clause. [Section II](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf) (form dated 1/2014, OMB approval 2577-0157, expiring 1/31/2027) has these labor clauses:

- Pay at least semi-monthly, at the rates on the attached wage determination, for the classification of work actually performed (paragraph 1(a)).
- Post the wage determination at the site where workers can see it (paragraph 1(a)).
- Make and keep, for three years, each worker's name, address and Social Security number, classification, hourly rates, fringe benefits, hours, gross wages, deductions and actual wages paid (paragraph 3(a)).
- Make those records available to HUD or the housing agency, and let them interview employees during working hours (paragraph 3(b)).
- Pass every clause to subcontractors, with the prime contractor responsible for them (paragraph 7).

If a bid or kickoff package asks for weekly WH-347 payrolls on maintenance work, ask the housing agency which clause requires them, because neither section of HUD-5370-C does. Our [WH-347 guide](https://wellstanding.com/guides/wh-347/) explains the form. A contract that mixes maintenance with modernization is a different case, covered below.

## Maintenance, nonroutine maintenance or modernization

[24 CFR 905.308](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-905/subpart-C/section-905.308) is titled "Federal requirements applicable to all Capital Fund activities" and sits in the Capital Fund rule, part 905 (eCFR, current as of November 5, 2026). The eCFR source note for 905.308 lists 85 FR 61568 (September 29, 2020) as its last amendment. Its paragraph (b)(3) says:

- For "all operations work and contracts, including routine and nonroutine maintenance work," laborers and mechanics are paid HUD-determined wages.
- For work or contracts "exceeding $2,000" in development or modernization, "except for nonroutine maintenance work," Davis-Bacon wages apply.

The Capital Fund line reaches work a housing agency does with Capital Fund money. A maintenance contract paid from operating funds is outside part 905, and for it the HUD-5370-C applicability box and Handbook chapter 8 above are the sources. The point that the funding source does not decide the question comes from LR-93-01, below, which is limited to CIAP and CGP work.

[24 CFR 905.200(b)(5)](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-905/subpart-B/section-905.200) defines nonroutine maintenance as work that ordinarily would be done regularly but has become substantial because it was postponed, and says it includes replacement of obsolete utility systems and dwelling equipment.

[Notice LR-93-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-1993-01.pdf) (January 15, 1993) is older and narrower. Its subject line limits it to construction work financed or eligible for financing under the Comprehensive Improvement Assistance Program (CIAP) or Comprehensive Grant Program (CGP), and it says it stays effective until amended, superseded or rescinded. It says HUD's Office of Labor Relations is responsible for determining whether work is maintenance, nonroutine maintenance or development, and that scope and context decide. It warns that judging work to "appear" to be maintenance or construction is not an appropriate approach, and that a wrong call may leave agencies or contractors paying wage restitution. It says the source of funds, operating or development, does not decide the question. For heating and air conditioning, it lists upkeep and inspection as maintenance. It says nonroutine maintenance may include replacement of equipment and materials rendered unsatisfactory by normal wear and tear with items of substantially the same kind. It treats reconstruction, a substantial improvement in the quality or kind of original equipment, and betterment such as converting oil heat to gas, as development, subject to Davis-Bacon.

On an HVAC replacement the two sources fit together. Replacing worn or obsolete equipment can be nonroutine maintenance under both, and a conversion or substantial betterment is development under LR-93-01. LR-93-01 assigns that determination to HUD's Office of Labor Relations. The header of [form HUD-52158](https://www.hud.gov/sites/dfiles/OCHCO/documents/52158.pdf) names the Office of Davis-Bacon and Labor Standards, and [Handbook paragraph 8-3](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf) says the HUD Labor Standards Specialist issues maintenance wage decisions. Ask the housing agency to obtain HUD's written classification.

### Where HUD sources disagree

LR-93-01 says HUD-determined maintenance wage rates "are not applicable to nonroutine maintenance," while saying nonroutine maintenance takes wage rates HUD determines for similar work. The current regulation and form place nonroutine maintenance under HUD-determined rates, and LR-93-01's contrary sentence predates them. [Section 905.308(b)(3)(ii)](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-905/subpart-C/section-905.308) puts nonroutine maintenance under HUD-determined wages, the HUD-5370-C applicability box lists nonroutine maintenance under Section II, and [form HUD-52158](https://www.hud.gov/sites/dfiles/OCHCO/documents/52158.pdf) has a decision type box for routine and for nonroutine maintenance.

### Mixed contracts

If one contract covers both maintenance and modernization, the modernization part falls under 905.308(b)(3)(i). Ask which labor clauses the contract adopts for that part. The Davis-Bacon side is explained in our [HUD-4010 guide](https://wellstanding.com/guides/hud-4010-federal-labor-standards-provisions/).

## How the wage decision is issued and how long it lasts

1. The housing agency should send HUD its rate recommendation at least 60 days before the start of the fiscal year in which the current decision will expire. Form HUD-4750 is the recommendation form, and HUD-4751 and 4752 are the survey forms and summary sheet where it runs a survey ([Handbook 8-6](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)).
2. HUD reviews the recommendation and issues form HUD-52158, making every effort to issue it at least 30 days before the fiscal year begins ([8-3](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)). The [form](https://www.hud.gov/sites/dfiles/OCHCO/documents/52158.pdf) says the housing agency does not submit anything to HUD on receipt. You never apply for the decision yourself.
3. The decision runs two years from the first day of the agency's fiscal year, or for the length of a collective bargaining agreement if shorter ([8-4 and 8-6(C)](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)). [LR-18-02](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2018-02.pdf) (October 15, 2018) set the two-year cycle, and [LR-21-02](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR_21-02.pdf) (June 15, 2021) lets HUD stagger terms, so some agencies get a first decision of one year.
4. The bid and contract must carry the wage decision and form HUD-5370-C. A multi-year maintenance contract must pick up any later decision issued to the agency ([8-11](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)).

Handbook paragraph 8-4 also says the housing agency may use the decision for all routine maintenance work "without further review or approval from HUD." Form HUD-52158 has separate decision type boxes for routine and nonroutine maintenance. Paragraph 8-4 says an expired decision is void. If your contract lists a decision whose expiration date has passed, raise it with the agency before you price or start work.

If a classification you need is not listed, ask the agency to request an additional one. The employer requests it through the housing agency, and approval is generally not given for apprentices, trainees, helpers or welders ([8-13](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)). An approved additional classification applies retroactively to the date of the original decision, unless HUD specifies otherwise ([8-5](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)). Apprentices registered in a bona fide program can still be paid program rates under [HUD-5370-C paragraph 4](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf).

The decision can be challenged. The agency or another affected party writes to the Deputy Director within 30 calendar days of notice of the decision ([8-7](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)).

## Overtime, state wage rates and the $2,000 threshold

For maintenance contracts, HUD observes the $2,000 threshold used for Davis-Bacon ([8-10](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)). The overtime provisions of the [Contract Work Hours and Safety Standards Act](https://wellstanding.com/guides/cwhssa-overtime-liquidated-damages/) apply when the prime contract is over $100,000 ([HUD-5370-C paragraph 6](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf)). Agency employees working directly for the housing agency are outside that overtime rule ([8-8](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)).

State prevailing wage can be displaced. [24 CFR 965.101(a)](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-965/subpart-A/section-965.101) makes a state-determined rate inapplicable to PHA contracts for development, maintenance and modernization, where a state law would otherwise apply and the work is assisted with low-income public housing funds under the 1937 Act, whenever the state rate exceeds the applicable federal rate. Under 965.101(d) it does not reach work or contracts administered by Indian Housing Authorities. For a HUD-determined rate, the comparison leaves out state fringe benefits. HUD-5370-C paragraph 8 repeats that rule.

## What the housing agency checks

The agency does spot-check reviews of your records and interviews your workers, recording them on form HUD-11 ([8-14](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)). It compares each interview with your records, and any discrepancy must be brought to your attention and resolved. Our [HUD-11 guide](https://wellstanding.com/guides/hud-11-employee-interview-form/) explains the form. For other jurisdictions, see [certified payroll requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/).

Remedies include withholding payments due to you and wage restitution ([8-1 and 8-11(B)](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf)). The HUD-5370-C dispute procedure starts with a reconsideration letter postmarked within 30 calendar days of the notice of findings ([paragraph 5(a)](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf)). Overtime disputes under paragraph 6 follow Department of Labor procedures instead.

## Help with your project

We prepare certified payroll for public works contractors. Tell us about your project.

## Questions

**Do I have to submit weekly certified payroll on public housing maintenance work?**

HUD's notice [LR-04-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf) eliminated payroll certification and submission for HUD-determined wages, and Section II of [HUD-5370-C](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf) has no weekly submission clause. Read your contract, because it may add its own terms. This covers HUD-determined maintenance wages only; Davis-Bacon development or modernization work follows weekly certified payroll.

**Who gets form HUD-52158?**

The housing agency. Under [Handbook paragraph 8-3](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf), HUD issues the decision to each agency operating covered housing. Your contract should attach it.

**Is replacing an HVAC system on public housing maintenance or Davis-Bacon work?**

It depends on the scope. [LR-93-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-1993-01.pdf), a 1993 notice on CIAP and CGP work, says nonroutine maintenance may include replacing worn equipment with items of substantially the same kind, and that substantial betterment or conversion is development. LR-93-01 assigns that determination to HUD's Office of Labor Relations. Ask the housing agency to obtain HUD's written classification. The current definition at [24 CFR 905.200(b)(5)](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-905/subpart-B/section-905.200) also includes replacing obsolete utility systems and dwelling equipment.

**What if the wage decision in my contract has expired?**

[Handbook paragraph 8-4](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf) says an expired decision is void. Ask the housing agency for the current one before work starts.

**How long do I keep records?**

Three years from completion of the work, under [HUD-5370-C paragraph 3(a)](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf) and [LR-04-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf).

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [form HUD-5370-C, Section II](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf) hud.gov
2. [chapter 8 of HUD Handbook 1344.1 REV-3](https://www.hud.gov/sites/dfiles/OCHCO/documents/13441C8SECH.pdf) hud.gov
3. [notice LR-04-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2004-01.pdf) hud.gov
4. [24 CFR 905.308](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-905/subpart-C/section-905.308) ecfr.gov
5. [42 U.S.C. 1437j(a)](https://www.govinfo.gov/link/uscode/42/1437j) govinfo.gov
6. [Section I](https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C1.pdf) hud.gov
7. [24 CFR 905.200(b)(5)](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-905/subpart-B/section-905.200) ecfr.gov
8. [Notice LR-93-01](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-1993-01.pdf) hud.gov
9. [form HUD-52158](https://www.hud.gov/sites/dfiles/OCHCO/documents/52158.pdf) hud.gov
10. [LR-18-02](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR-2018-02.pdf) hud.gov
11. [LR-21-02](https://www.hud.gov/sites/dfiles/OCHCO/documents/LR_21-02.pdf) hud.gov
12. [24 CFR 965.101(a)](https://www.ecfr.gov/current/title-24/subtitle-B/chapter-IX/part-965/subpart-A/section-965.101) ecfr.gov

## Related

- [Housing authority certified payroll](https://wellstanding.com/guides/housing-authority-certified-payroll/)
- [HUD-11 employee interview form](https://wellstanding.com/guides/hud-11-employee-interview-form/)
- [HUD-4010 labor standards provisions](https://wellstanding.com/guides/hud-4010-federal-labor-standards-provisions/)
- [Certified payroll requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/)
- [WH-347 explained](https://wellstanding.com/guides/wh-347/)