---
title: Louisiana Certified Payroll: DOTD and LCDBG | WellStanding
url: https://wellstanding.com/guides/louisiana-certified-payroll/
description: Louisiana repealed its prevailing wage law in 1988. Federal-aid DOTD and most LCDBG jobs still need weekly payroll, with different rules on clocks and fixes.
updated: 2026-11-06
type: guide
publisher: WellStanding Certified Payroll
---
# Louisiana certified payroll on DOTD and LCDBG jobs

This page compares two Louisiana channels that take weekly payroll: the [DOTD Labor Compliance Program Manual (September 2024)](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) for federal-aid highway work and [Section B of the Office of Community Development grant manual (revised April 2024)](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) for CDBG construction. It means the state, not Los Angeles.

Last reviewed November 6, 2026 against the sources it cites

The short answer

Louisiana repealed its prevailing wage statute in 1988. Two federal-money channels there run rules that differ. On a DOTD highway job, the prime submits through AASHTOWare for every period through final inspection, and a late payroll delays the payment estimate. On an LCDBG job, payrolls go through the prime to the local government within seven working days, and a no-work week is reported by phone or email.

- [R.S. 38:2301](https://www.legis.la.gov/legis/Law.aspx?d=94992), in Part VI, Payment of Prevailing Wages, was repealed by Acts 1988, No. 18 and No. 90, effective June 27, 1988.
- The [DOTD manual (September 2024)](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) requires the prime to submit payrolls for every period from the start of work to final inspection, whether or not it worked, while subcontractors submit when active.
- The same [DOTD manual](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) says a delay in submitting payroll delays processing of payment estimates, and it tells project engineers to make sure payrolls arrive within 7 days after employees are paid.
- OCD's [Section B (revised April 2024)](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) tells local governments to require LCDBG payrolls through the prime within seven working days after the payroll ending date, numbered consecutively.
- [Section B](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) says no payroll is due for a week with no work, but the local government should be told by phone or email, and the next payroll takes the next consecutive number.
- [Section B](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) lets a local government withhold from the prime if restitution is not corrected within 30 calendar days from the first notice of underpayment.

## Louisiana has no state prevailing wage law

In Part VI, Payment of Prevailing Wages, section 2301 ([R.S. 38:2301](https://www.legis.la.gov/legis/Law.aspx?d=94992)) is marked repealed. It was repealed by Acts 1988, No. 18 and No. 90, effective June 27, 1988. On the two channels below, the [DOTD](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) and [OCD](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) manuals both rest the weekly payroll on federal Davis-Bacon rules. See the [WH-347 guide](https://wellstanding.com/guides/wh-347/) for the form and the [state table](https://wellstanding.com/guides/certified-payroll-requirements-by-state/) for other states. This page does not cover terms a parish, city or school board writes into its own contract.

## Which Louisiana channel is your job in?

Look at who pays. The DOTD manual covers [federally funded highway construction contracts](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) with Davis-Bacon wages. The OCD manual covers [Louisiana Community Development Block Grant (LCDBG)](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) construction through a local government. Most LCDBG construction is covered, but the manual says housing projects are rarely covered and force account labor (local government employees) does not have to pay the Davis-Bacon wage rates (pages B-2 to B-4 and B-15), so check your contract for a Davis-Bacon wage decision. OCD's [CDBG programs page](https://locd.la.gov/local-government-assistance/cdbg-and-cdbg-cv-programs) lists sewer, water and street improvements.

| Question | DOTD highway job | OCD LCDBG job |
| --- | --- | --- |
| Where payroll goes | AASHTOWare Civil Rights and Labor, with paper payroll references deleted (section 4.1.1). [29 CFR 5.5(a)(3)(ii)(A)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.5) lets an agency or prime require an electronic system only if it permits other methods when the contractor is unable or limited in its ability to use or access the system | Through the prime to the local government, with no portal named (page B-16) |
| Clock | Project engineers check that payrolls are received within 7 days after employees are paid (section 3.2(f)); a separate 30-day window sets which periods must be in before an estimate (section 4.1.1) | Local governments require them within seven working days after the payroll ending date (page B-17) |
| A week with no work | The prime submits anyway, through final inspection (section 4.1.1) | No payroll. Tell the local government by phone or email (page B-16) |
| Late payroll | The payment estimate is delayed (section 4.1.3) | The local government may withhold contractor payment (page B-17) |
| Underpayment | Discrepancy notice, back wages, supplemental payroll and check copy (section 3.2(g)) | Notice of Restitution Due, then a Certified Correction Payroll (page B-23) |

## Louisiana DOTD jobs: a late payroll delays your payment estimate

A delay in submitting payroll delays processing of payment estimates (section 4.1.3). The 7 days in the table is the project engineer's receipt check (section 3.2(f)). The 30-day window decides which periods must be in before an estimate: a payroll is due for each pay period that ends within 30 days before the current estimate period begins (section 4.1.1). Assembly-period, zero-dollar and negative-dollar estimates need no payroll, nor do estimates for projects taken over by a surety or estimates with lapsed dates from a project number change, a new contractor or surety, or lump-sum emergency force account payments, and closeout estimates need payrolls up to the final inspection date (section 4.1.6). On design-build projects no payrolls are entered during the design phase, and invoices or a Statement of Material and Labor are used for estimates instead (section 4.1.5). For system steps, see the [AASHTOWare guide](https://wellstanding.com/guides/aashtoware-civil-rights-labor-certified-payroll/).

### Louisiana DOTD: the prime submits even when no one worked

The prime submits the payroll and Statement of Compliance for every period from the date work begins to the final inspection date, whether or not it worked (section 4.1.1). A subcontractor submits for the periods in which it works, and the project engineer decides whether it is active. The [FHWA-1273 edition DOTD posts (revised October 23, 2023)](https://dotd.la.gov/media/ofkdgcum/fhwa-form-1273-rev-1023.pdf), Section IV, paragraph 3.b.(1), asks for payrolls weekly for each week in which covered work is performed. DOTD's manual cites Section IV(3) for the through-final-inspection span, but Section IV.3 of the posted form has no final-inspection endpoint. FHWA's [form page](https://www.fhwa.dot.gov/construction/cqit/form1273.cfm) now lists a June 25, 2026 edition, covered in our [FHWA-1273 guide](https://wellstanding.com/guides/fhwa-1273-changes-2026/).

### Louisiana DOTD: a wage discrepancy notice

The manual says Labor Compliance calculates back wages, notifies the contractor in writing or by email, and requires restitution within a set period with documents showing payment (section 3.1(f)). After the back wages are paid, a supplemental payroll and a copy of the check go to the project engineer's office (section 3.2(g)). The manual gives no number of days, so use the period in your notice. For failure to submit or make records available, the manual says the federal agency may, after written notice, suspend further payment, and that it may be grounds for debarment (section 4.1.3). See [withheld contract payments](https://wellstanding.com/guides/davis-bacon-withholding-of-contract-payments/) and [debarment](https://wellstanding.com/guides/davis-bacon-debarment/).

## Louisiana LCDBG jobs: through the prime, within seven working days

Under the OCD manual (page B-16), each contractor and subcontractor submits numbered weekly payrolls from the day work begins until it is done. A subcontractor's payroll goes to the prime, who reviews it, may require corrections and forwards it to the local government. The local government is told to require every payroll within seven working days after the payroll ending date (page B-17). As a suggestion, give your prime an earlier deadline of your own. If payrolls are late, the local government may withhold contractor payment until acceptable ones arrive (page B-17). Late payrolls can also put the local government out of compliance, and OCD may then suspend its next payment request (page B-27).

### Louisiana LCDBG: no-work weeks and numbering

If no work is performed in a workweek, no payroll is due, but tell the local government by phone or email that no work was done. When work resumes, use the next consecutive number. In the manual's example, work in weeks 1, 2, 3 and 7 makes the week 7 payroll Payroll #4 (page B-16).

### Louisiana LCDBG: who signs the Statement of Compliance

An owner, officer or designated employee signs each weekly Statement of Compliance, and the manual calls for an original signature. A designated employee needs a written authorization signed by a company officer (page B-16). The manual does not mention electronic signatures, while [29 CFR 5.5(a)(3)(ii)(E)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.5) accepts a handwritten or legally valid electronic one. [DOL's instructions](https://www.dol.gov/agencies/whd/forms/wh347) say "Photocopies or scanned copies of signatures do not satisfy this requirement." Ask the local government in writing whether it takes a legally valid e-signature or wants original ink. See the [HUD signature guide](https://wellstanding.com/guides/hud-statement-of-compliance-signature/).

### Louisiana LCDBG: underpayment, correction payroll and withholding

1. **Notice.** The local government sends a written Notice of Restitution Due naming the workers, correct classification and rate, dates and amount owed, plus a liquidated damages calculation for overtime violations (page B-23).
2. **Certified Correction Payroll.** You pay the workers, then submit a payroll listing those workers and the restitution amounts, with a signed Statement of Compliance. For one week, number it like the original with a revision, such as Payroll #2, Revision #1. For several weeks, show the weeks covered (page B-24).
3. **Liquidated damages.** Tell the local government in writing whether you will pay, by wire transfer, or ask for a waiver. HUD may waive for an unintentional error with due care or a mathematical mistake, and you have 60 days to appeal a refusal (page B-25).
4. **Withholding.** If restitution is not corrected within 30 calendar days from the first notice, the local government may withhold from the prime the amount it considers necessary, with a second notice. OCD is told if restitution is not made within 30 days of that notice (pages B-26 and B-27).

The manual disagrees with itself on the dollar figure: [$31 per worker per day as of January 16, 2023](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) (page B-22), but $27 in its worked example (page B-24). The current [29 CFR 5.5(b)(2)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.5), current to November 5, 2026, reads $33 per calendar day. Check the clause in your contract and ask the local government to show the calculation its notice should contain.

## Who to ask about your Louisiana job

For DOTD work, ask the project engineer's office or Labor Compliance (section 2.2.2). For LCDBG work, ask the local government's Labor Compliance Officer (page B-3); see [OCD's contact page](https://locd.la.gov/contact-us). OCD's [manuals page](https://locd.la.gov/grant-implementation-manuals) showed no edition dates, so confirm April 2024 is current. We prepare certified payroll for public works contractors. Tell us about your project.

## Questions

**How do I add a classification that is not on the Louisiana wage decision?**

On a DOTD job, [the manual](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) says Labor Compliance supplies Standard Form 1444 and forwards it to USDOL (section 3.1(b)). On an LCDBG job, under [Section B](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf), you tell the prime, the local government sends the SF-1444 to OCD, and OCD sends it to DOL. Meanwhile you may pay the requested rate. If DOL rejects it and sets a higher rate, that rate applies from the first day of work. The manual says to expect about 60 days ([page B-10](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf)). The [copy DOTD posts](https://dotd.la.gov/media/n2sg0t3m/sf1444.pdf) is the 4/2013 edition. [GSA](https://www.gsa.gov/reference/forms/request-for-authorization-of-additional-classification-and-rate) lists a current revision date of 10/2023, while [FAR 53.222(f)](https://www.ecfr.gov/current/title-48/chapter-1/subchapter-H/part-53/subpart-53.2/section-53.222) still names Rev. 4/2013, as the [SF-1444 guide](https://wellstanding.com/guides/sf-1444-additional-classification/) explains. Use the revision printed on the form you submit.

**Can I list a helper on a Louisiana LCDBG payroll?**

The [OCD manual](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) says no (page B-14), because a helper classification "is not found on any of the Louisiana wage decisions." A worker listed as a helper who uses a trade's tools must be paid as a mechanic from the first day of work, and one doing laborer work as a laborer.

**Will anyone interview my workers on a Louisiana job?**

Both manuals call for it. [DOTD](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) interviews one employee per federal-aid contract with a wage decision and compares the form to your payroll, and compliance can add interviews as needed (section 3.2(h)). [OCD](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) has the local government interview employees of every prime and of subcontractors awarded $100,000 or more, plus any subcontractor with a large number of payroll problems and other subcontractors present on the jobsite on an interview day, aiming for at least 50% of the laborers present (pages B-12 and B-13).

**Where does a self-employed owner-operator go on a Louisiana payroll?**

On an LCDBG job, [the manual](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) says a self-employed worker with no crew cannot sign their own payroll and goes on the prime's payroll. B-21 lists the minimum information as "name address, classification(s), hours worked, estimated hourly pay, and estimated gross pay" (pages B-21 and B-22). That conflicts with B-16, which says the address and full Social Security number must not be listed and that the last four digits of the Social Security number go on payrolls, and [29 CFR 5.5(a)(3)(ii)(B)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.5) bars full Social Security numbers and addresses on submitted payrolls. Keep the address in the prime's own records and ask the local government in writing. A truck owner-operator is listed with the notation owner-operator and no hours or rates, as the [DOTD manual](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) (Part 6) also says, but that does not extend to owners of other equipment such as bulldozers, backhoes or cranes.

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [DOTD Labor Compliance Program Manual (September 2024)](https://dotd.la.gov/media/xodmr4md/labor-compliance-manual-updated.pdf) dotd.la.gov
2. [Section B of the Office of Community Development grant manual (revised April 2024)](https://doa.la.gov/media/wwodpvgu/section-b-w-toc.pdf) doa.la.gov
3. [R.S. 38:2301](https://www.legis.la.gov/legis/Law.aspx?d=94992) legis.la.gov
4. [CDBG programs page](https://locd.la.gov/local-government-assistance/cdbg-and-cdbg-cv-programs) locd.la.gov
5. [29 CFR 5.5(a)(3)(ii)(A)](https://www.ecfr.gov/current/title-29/subtitle-A/part-5/subpart-A/section-5.5) ecfr.gov
6. [FHWA-1273 edition DOTD posts (revised October 23, 2023)](https://dotd.la.gov/media/ofkdgcum/fhwa-form-1273-rev-1023.pdf) dotd.la.gov
7. [form page](https://www.fhwa.dot.gov/construction/cqit/form1273.cfm) fhwa.dot.gov
8. [DOL's instructions](https://www.dol.gov/agencies/whd/forms/wh347) dol.gov
9. [OCD's contact page](https://locd.la.gov/contact-us) locd.la.gov
10. [manuals page](https://locd.la.gov/grant-implementation-manuals) locd.la.gov
11. [copy DOTD posts](https://dotd.la.gov/media/n2sg0t3m/sf1444.pdf) dotd.la.gov
12. [GSA](https://www.gsa.gov/reference/forms/request-for-authorization-of-additional-classification-and-rate) gsa.gov
13. [FAR 53.222(f)](https://www.ecfr.gov/current/title-48/chapter-1/subchapter-H/part-53/subpart-53.2/section-53.222) ecfr.gov

## Related

- [AASHTOWare Civil Rights and Labor by state DOT](https://wellstanding.com/guides/aashtoware-civil-rights-labor-certified-payroll/)
- [HUD Statement of Compliance: ink or e-sign](https://wellstanding.com/guides/hud-statement-of-compliance-signature/)
- [Certified payroll requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/)
- [Davis-Bacon back wages withheld from your contract payment](https://wellstanding.com/guides/davis-bacon-withholding-of-contract-payments/)
- [SF-1444 additional classification request](https://wellstanding.com/guides/sf-1444-additional-classification/)
- [Arkansas certified payroll](https://wellstanding.com/guides/arkansas-certified-payroll/)
