---
title: Metrolink Certified Payroll: Monthly Rules | WellStanding
url: https://wellstanding.com/guides/metrolink-certified-payroll/
description: Metrolink (SCRRA) State-Only checklist: certified payroll kept weekly, submitted monthly, a signed Statement of Compliance per record, plus records penalties.
updated: 2026-11-13
type: guide
publisher: WellStanding Certified Payroll
---
# Metrolink certified payroll: the State-Only checklist

Metrolink is run by the Southern California Regional Rail Authority (SCRRA). This page follows the Authority's State-Only [State Labor Compliance Pre-Construction Conference Checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf) (Version 12.2020), which applies to contracts governed by state prevailing wage, and the state rule it cites, [8 CCR 16421](https://www.dir.ca.gov/t8/16421.html).

Last reviewed November 13, 2026 against the sources it cites

The short answer

Under the Authority's State-Only labor compliance checklist, for contracts governed by state prevailing wage, contractors keep certified payroll records weekly and submit them monthly. Each record needs a Statement of Compliance with an original signature, and an idle week needs a Non-Performance record. Your contract documents control.

- Metrolink's [State-Only Labor Compliance checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf), for contracts governed by state prevailing wage, says certified payroll records are maintained weekly and submitted monthly to the Authority's online prevailing wage reporting system.
- The same [checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf) requires a Statement of Compliance with an original signature for each certified payroll record, whatever form of payroll is submitted.
- A certified payroll record marked Non-Performance is submitted for each week in which no work activity occurred, per the [Authority's checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf).
- The [checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf) states that a contractor forfeits to the Authority $100 per day per worker for failing to comply strictly with the Authority's requests for adequate payroll records, citing Labor Code 1776(h).
- Under [8 CCR 16421](https://www.dir.ca.gov/t8/16421.html)(a)(3), a labor compliance program requires certified payroll records to be furnished at least monthly or within 10 days of an awarding body's request.
- The [checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf), Version 12.2020, also says all certified payrolls must be uploaded into DIR's eCPR system and that the last payroll is marked Final.

## The Metrolink payroll rule in one table

The Authority's checklist is a pre-construction conference document. It lists what a contractor on a state-prevailing-wage Metrolink contract is told at the start of the job. The payroll items are below, all from that [checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf).

| Item | What the checklist says |
| --- | --- |
| Who | Certified payroll records for all contractors performing work on the jobsite. |
| Keep | Maintained weekly. |
| Submit | Monthly, to the Authority's online prevailing wage reporting system. |
| Signature | A Statement of Compliance with an original signature for each certified payroll record. |
| Idle week | A record marked Non-Performance for any week with no work activity. |
| Identification | The contract number and project name on every certified payroll record and related document. |
| Final payroll | The last payroll record is marked Final. The prime contractor sends a Form 107 with it. |
| Retention | At least 3 years past the Notice of Completion date. |

If you are comparing this with another agency, [SANDAG](https://wellstanding.com/guides/sandag-certified-payroll/) runs a different system and schedule.

## Weekly records, monthly submission

The checklist separates two clocks. You keep a certified payroll record for every week of work. You submit the records once a month. The monthly submission goes to the Authority's online prevailing wage reporting system. The checklist also says originals are submitted with monthly progress payments to the Authority's designated Project Manager and Construction Manager, and it describes the submission channel in more than one way. Confirm the channel in your contract and at the pre-construction conference.

The monthly cycle matches the state rule the checklist cites. [8 CCR 16421(a)(3)](https://www.dir.ca.gov/t8/16421.html) requires an awarding body's labor compliance program to have payroll records furnished at times set in the contract, which "shall be at least monthly, or within 10 days of any request by the Awarding Body." For the general state deadlines that apply on any California public works job, see [certified payroll deadlines in California](https://wellstanding.com/guides/certified-payroll-deadlines-california/) and [the 10 day records request](https://wellstanding.com/guides/certified-payroll-records-request-10-days/).

### Submitting in the Authority's form

The checklist allows a form other than the Authority's Public Works Payroll Reporting Form and Statement of Compliance. The checklist says an alternate form must contain all information that is included in the Authority's Public Works Payroll Reporting Form and Statement of Compliance.

## The Statement of Compliance needs an original signature

The checklist says a Statement of Compliance must be submitted with an original signature for each certified payroll record. It also says the Statement of Compliance must go in with each payroll report no matter what form of payroll is submitted. That means one signed statement for each certified payroll record.

### Deductions marked Other

Under the checklist, any "Other" deduction on the payroll form must be explained on the Statement of Compliance. Supporting documents go with the first payroll on which the deduction appears.

## Weeks with no work: the Non-Performance record

A week with no activity on the contract still gets a record. The checklist says a certified payroll record marked "Non-Performance" is submitted for weeks for which no work activity has occurred. Skipping the idle weeks leaves a gap in the monthly submission.

## What else goes in with the first payroll

Several checklist items attach to the first payroll or to the start of work. A monthly duty follows the list.

1. A [Fringe Benefit Statement](https://wellstanding.com/guides/fringe-benefit-statement/) with the first payroll, then again only when fringe benefit rates change or additional trades are used.
2. Proof of state registration for every apprentice, a copy of the certificate, attached to the first payroll on which the apprentice appears.
3. The Owner-Operator Listing and the Truck Owner-Operator Certification of Ownership, if you employ owner-operators. The contractor that directly hires and pays the owner-operator completes the listing, and the Authority will not accept it from the owner-operator.
4. The [DAS 140](https://wellstanding.com/guides/das-140-form/) sent to the apprenticeship committee within ten days of contract execution and no later than the first day of work, with a copy to the Authority at the same time. See [DAS 140 and DAS 142](https://wellstanding.com/guides/das-140-142/).

Separately, item 6 says a contractor that is not signatory to a local union or apprenticeship program submits a copy of the CAC-2 to the Authority monthly. See [CAC training fund contributions](https://wellstanding.com/guides/cac-training-fund-contributions/).

## DIR eCPR as well

The checklist says the project is subject to monitoring and enforcement by the Department of Industrial Relations and the Authority's DIR [approved Labor Compliance Program](https://wellstanding.com/data/california-labor-compliance-programs/). It says all contractors and subcontractors must furnish electronic certified payroll records to the Authority's labor compliance and to the Labor Commissioner, and that all certified payrolls must be uploaded into DIR's eCPR system. The monthly Authority submission and the eCPR are two separate duties. For the DIR side, read [the DIR eCPR system](https://wellstanding.com/guides/dir-ecpr-system/).

## The $100 per day per worker forfeiture

Item 10 of the checklist covers the penalty for payroll records. It cites Labor Code 1776(h) and says the contractor forfeits to the Authority $100 per day per worker for failing to comply strictly with the Authority's requests for adequate payroll records. The checklist ties the forfeiture to the Authority's requests for adequate payroll records.

The checklist adds a payment consequence. Item 23 says the Authority will issue Discrepancy Notices for violations. If a violation is not corrected as requested, the Authority may withhold all or part of a progress payment or the final or retention payment. This matches [8 CCR 16421(a)(6)](https://www.dir.ca.gov/t8/16421.html), which requires contracts to provide that payments are not made when payroll records are delinquent or inadequate.

If a violation is not corrected as requested, the Authority may withhold payment. If the Authority is alleging unpaid wages, talk to an attorney about representation.

## Your prime contractor and subcontractors

The checklist says the prime contractor is responsible for the compliance of all subcontractors, regardless of tier. It also requires flow down provisions, so each subcontractor's contract carries the same payroll duties. Check your subcontract for the submission date it sets.

## A note on the date of this source

The checklist is marked Version 12.2020. This page covers only its payroll items, not the registration and threshold items on it, and the weekly, monthly and signature rules are the Authority's own wording. The checklist covers state prevailing wage contracts, and your contract documents control. Check your Metrolink contract and the pre-construction conference notes for the current forms and dates.

WellStanding prepares the WH-347 and the eCPR from the payroll export you already run, and a person reviews every filing. You review the finished filing and sign the certification in one step, and nothing is filed until you have signed; we never sign for you.

## Questions

**How often is certified payroll due on a Metrolink contract?**

On a state-prevailing-wage contract, records are kept weekly and submitted monthly to the Authority's online prevailing wage reporting system, per the [SCRRA checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf). Your contract may set a specific monthly date.

**Do I have to submit a payroll for a week with no work?**

Yes. The checklist calls for a record marked Non-Performance for weeks with no work activity.

**Does each certified payroll record need its own signed statement?**

Yes. The checklist requires a Statement of Compliance with an original signature for each certified payroll record.

**What is the penalty for inadequate payroll records?**

The checklist states a forfeiture of $100 per day per worker for failing to comply strictly with the Authority's requests for adequate payroll records, citing Labor Code 1776(h). The Authority may also withhold progress or retention payments.

**Do I still file with DIR if I submit to Metrolink?**

The checklist says all certified payrolls must be uploaded into DIR's eCPR system and that electronic records must go to the Labor Commissioner as well as the Authority. See [the DIR eCPR system](https://wellstanding.com/guides/dir-ecpr-system/).

**How long do I keep the records?**

The checklist says to retain all certified payroll records for at least 3 years past the Notice of Completion date.

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [State Labor Compliance Pre-Construction Conference Checklist](https://metrolinktrains.com/globalassets/about/dbe/3.-state-only-labor-compliance-checklist.pdf) metrolinktrains.com
2. [8 CCR 16421](https://www.dir.ca.gov/t8/16421.html) dir.ca.gov

## Related

- [The DIR eCPR system](https://wellstanding.com/guides/dir-ecpr-system/)
- [Certified payroll deadlines](https://wellstanding.com/guides/certified-payroll-deadlines-california/)
- [DAS 140 and DAS 142, explained](https://wellstanding.com/guides/das-140-142/)
- [The 10 day records request](https://wellstanding.com/guides/certified-payroll-records-request-10-days/)
- [SANDAG certified payroll](https://wellstanding.com/guides/sandag-certified-payroll/)
