# NYC SCA Daily Signature Log: how it works and what goes with each request for payment

This page covers the School Construction Authority (SCA) Daily Signature Log and the officer certification for each request for payment. It draws on the SCA's [Labor Law Compliance page](http://nycsca.org/Doing-Business/Labor-Law-Compliance) (read November 2026), its [DSL instructions](http://www.nycsca.org/Portals/0/DSL%20-%20How%20to%20Complete.pdf), its [upload guide](http://www.nycsca.org/Portals/0/LCMS%20DSL%2011-05-21%20Update.pdf) and its [DSL Upload Certification](http://www.nycsca.org/Portals/0/DSL%20Upload%20Certification_1.pdf).

Last reviewed November 6, 2026 against the sources it cites

The short answer

The Daily Signature Log (DSL) is the SCA's sign-in and sign-out timesheet for the laborers, mechanics, journeypersons and apprentices on an SCA job. The DSL Upload Certification, signed by an officer of the contractor, must be included with all request for payment documents, and General Conditions 15.01(B) says a request must be fully and properly completed to be processed.

- The SCA's [DSL Upload Certification](http://www.nycsca.org/Portals/0/DSL%20Upload%20Certification_1.pdf) (form DSLU 6-2021) says a copy of the completed form must be included with all request for payment documents, and an officer of the contractor must sign it.
- Workers sign the DSL in pen at the start and end of each shift, and the SCA's [instructions for the DSL](http://www.nycsca.org/Portals/0/DSL%20-%20How%20to%20Complete.pdf) say no worker should sign a log that is not pre-filled with the job details, the worker's name and the base wage for the trade.
- The SCA's [Labor Law Compliance page](http://nycsca.org/Doing-Business/Labor-Law-Compliance) says the DSL for every certified payroll rendered into LCMS must be uploaded immediately, while its [upload guide](http://www.nycsca.org/Portals/0/LCMS%20DSL%2011-05-21%20Update.pdf) (a file named 11-05-21) says within 30 days of the work completion date.
- A DSL is uploaded as a PDF, daily or weekly, either inside LCMS or on the separate DSL Submission web page, per the SCA's [upload guide](http://www.nycsca.org/Portals/0/LCMS%20DSL%2011-05-21%20Update.pdf).
- LCMS access requires SCA University training, and a contractor must be assigned to a project before it can register for an LCMS training class, per the SCA's [Labor Law Compliance page](http://nycsca.org/Doing-Business/Labor-Law-Compliance).

## What goes with a request for payment

The SCA's [DSL Upload Certification](http://www.nycsca.org/Portals/0/DSL%20Upload%20Certification_1.pdf) (form DSLU 6-2021) says a copy of the completed form must be included with all request for payment documents. An officer of the contractor must sign it. The SCA's [General Conditions for Construction Projects](https://dnnhh5cc1.blob.core.windows.net/portals/0/General/General%20Conditions/ConstructionGCFinalHBProjects101122R.pdf?sv=2017-04-17&sr=b&si=DNNFileManagerPolicy&sig=ZNSrFdPFPYdpjeXTuGRX2cd0m6vuVoG7icqpbMOCpPs%3D), revised October 11, 2022, say in section 15.01(B) that a request for payment must be fully and properly completed to be processed. Check which version your contract uses.

The SCA documents confirm these requirements for a request for payment; they do not say which one caused your return. The [Labor Law Compliance page](http://nycsca.org/Doing-Business/Labor-Law-Compliance) says failure to submit certified payroll reports or provide accurate information can result in penalties, including the withholding of payments. Check this list.

1. **The Request for Payment form is complete.** It is Appendix C of the General Conditions (form revised 08/01/12), with a Labor Law 220 certificate and a notary block.
2. **Certified payrolls are with it.** Section 15.01(D) calls for them with every requisition, in a form the SCA accepts, including a certification of compliance with the OSHA course training requirements in Labor Law Section 220-h, certified for each worker on the first requisition that names the worker. It also requires the other documents the State Labor Law calls for before any payment. On SCA jobs they go into LCMS. The [New York certified payroll guide](https://wellstanding.com/guides/new-york-certified-payroll/) covers the payroll cycle and the DOL portal question.
3. **The DSLs are uploaded** for the whole request period, yours and your subcontractors'.
4. **The Upload Certification is signed** and dated by an officer, and a copy is in the package.

### What goes on the certification

| Part of the form | What you enter |
| --- | --- |
| To | The SCA Project Officer's name |
| From | The general contractor's name and address |
| Re | SCA contract number, solicitation number, project or school, and address |
| Request for payment | The RFP number, its date, and the period it covers, from and to |
| Certification line | The officer's name, signature and date |

The officer certifies that the complete and correct original DSLs for the contractor and its subcontractors, for that job and period, are uploaded into LCMS and available for inspection. Because it covers subcontractors' logs, tell your general contractor when your uploads are done.

## What the Daily Signature Log is

The SCA's [upload guide](http://www.nycsca.org/Portals/0/LCMS%20DSL%2011-05-21%20Update.pdf) calls the DSL, formerly the DSOL, a timesheet that every laborer, mechanic, journeyperson and apprentice signs at the start and end of each shift, every workday. It shows the worker the required base wage and benefit rate and records start and quit times and trade. The General Conditions, section 11.02, have the contractor and its subcontractors complete it each day for all hourly employees on the site. On PLA jobs, the PLA FAQ on the SCA's [Labor Law Compliance page](http://nycsca.org/Doing-Business/Labor-Law-Compliance) says managers and supervisors should be listed on the DSL and payroll for insurance purposes. Its FAQ on security guards on SCA construction projects says they should be listed too.

The current form is SCA PM-15 Exhibit 4a ([PDF](http://nycsca.org/Portals/0/DSL-Daily%20Signature%20Log.pdf)) and Exhibit 4b ([Excel](http://nycsca.org/Portals/0/DSL-SCA%20PM%20rev4%20%2804-18_1.xlsx)), both rev 4 (04-18). It is not the certified payroll report, a separate LCMS submission. The SCA documents linked here do not say how DSL hours are compared with payroll hours, so keep the two consistent.

## How to complete it

The SCA's [DSL instructions](http://www.nycsca.org/Portals/0/DSL%20-%20How%20to%20Complete.pdf), written for the rev 4 (04-18) form, say a DSL must be completed every workday for all SCA construction job sites, kept visible, and kept on site for SCA officials.

| When | Fields | Who |
| --- | --- | --- |
| Before anyone signs | Company name and Contractor or Subcontractor box, address, supervisor, make-up day if any, day, date, school project name and address, PLA Y or N, SCA solicitation and contract numbers. Per worker: printed name, last 4 of SSN, classification (J, A1, A2, A3), trade, base wage rate, supplemental benefit rate, union or "None". | Whoever prepares the log |
| Start of shift | Starting time and a pen sign-in signature. Not filled in earlier. | The worker |
| End of shift | Quitting time, total hours this shift excluding meal time, and a pen sign-out signature. | The worker |
| Once final | The company officer's name, title, signature and date. | An officer |

- **No blank signing.** A worker must never sign a log that is not pre-filled with the job details, the worker's name and the base wage for the trade.
- **Absent workers.** Draw a line through the name. Do not scribble or use white-out.
- **PLA jobs.** The base wage field takes the base wage rate, not the PLA rate.
- **Make-up days.** The form's footnote covers Saturday make-up days after severe weather, power failure, fire or disaster.
- **Officer signature.** It certifies the log is complete and correct. The instructions call falsification a punishable offence.

## How to upload it

The [upload guide](http://www.nycsca.org/Portals/0/LCMS%20DSL%2011-05-21%20Update.pdf) (a file named 11-05-21) says to scan and save the hard copy DSL first, then use LCMS or the dedicated DSL Submission web page. Have the contract number, week-ending date and work days ready.

1. **Find the contract.** In LCMS, go to Certified Payrolls, then Manage CPRs, and search the last five digits of the contract number. Select the school and click Upload DSL, which signs you into the DSL Submission page. You can also go to that page directly and search by Contract No.
2. **Pick the contractor,** and click Upload DSL.
3. **Set the dates.** Unlock the calendar and choose the week, or the Daily option for one day. The DSL week-ending date is the same as the payroll week-ending date. Select at least one work day.
4. **Attach the PDF.** The guide says the file must be a PDF and prints a limit of 10 KB. If your scan will not load, check its size against that limit. The Labor Law Compliance page says the SCA's manuals, FAQs and videos are inside LCMS under Activities, Support, Help.
5. **Certify and save.** Tick the certification box and click Save.

### Two SCA statements on timing

The [Labor Law Compliance page](http://nycsca.org/Doing-Business/Labor-Law-Compliance) says CPRs are expected to be rendered into LCMS within 30 days, and that for every CPR rendered, the corresponding DSL must be uploaded immediately. The upload guide, a file named 11-05-21, says daily or weekly, within 30 days of the work completion date. The two statements differ. Uploading with each payroll meets both, and do it before the officer signs the certification. Section 11.02 of the General Conditions requires the contractor and its subcontractors to deliver the DSL originals to the SCA Mail Room, Attention: Labor Law Compliance, every month, and separately to submit the DSL to the SCA electronically, each "in accordance with the SCA's directions and procedures." The upload guide says the DSOL timesheets were historically mailed to the SCA and that the DSL process lets users input the information electronically, and the certification says the originals must be available for inspection.

## Getting access to LCMS

The [Labor Law Compliance page](http://nycsca.org/Doing-Business/Labor-Law-Compliance) says contractors and subcontractors must use LCMS for both certified payrolls and DSLs. SCA University training must be completed to gain entry, and a contractor must be assigned to a project before it can register for an LCMS class. Manuals, FAQs and videos are inside LCMS under Activities, Support, Help. The FAQ on that page adds that every subcontractor must submit DSLs to the hiring contractor, and ultimately to the general contractor and the SCA Labor Law Compliance Division.

## The public database

The SCA's [public certified payroll database](https://laborlaw.nycsca.org/Public/CPRPublicDirectory) searches by contractor name, borough, week-ending dates, school name or contract number, and zip code. The Labor Law Compliance page says it holds payrolls submitted starting December 31, 2025. It describes certified payroll records and does not say DSLs appear there. For city jobs outside the SCA, see the [NYC Comptroller guide](https://wellstanding.com/guides/nyc-comptroller-certified-payroll-report/) and the [NYCHA guide](https://wellstanding.com/guides/nycha-certified-payroll/). Other states are in the [requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/) table.

## If the hold is about wages or benefit funds

A held payment is not always paperwork. On PLA projects, General Conditions section 15.03(D) says that when a union or fund gives written notice of missed fringe benefit contributions, the contractor has five calendar days to furnish proof of payment or notice of a dispute. Otherwise the SCA withholds from the general contractor the amount the fund claims, limited to the payment tied to the delinquent contractor's work and capped at that work's monthly invoice. A disputed amount is held in a separate account. This version of the General Conditions names the 2021-2025 PLA, and the PLA controls over 15.03(D) in a conflict. The SCA page now also lists a PLA for fiscal years 2025 to 2029 (PLA-E), so read the PLA that governs your contract. Section 15.05(B) covers wages paid below the prevailing rate. The SCA's [Getting Paid page](http://nycsca.org/Doing-Business/Getting-Paid) says Labor Law 220 violations go into its lien system, and funds are held when the approved payment request reaches Finance.

We prepare certified payroll for public works contractors. Tell us about your project.

## Questions

**Is the Daily Signature Log the same as the certified payroll report?**

No. The DSL is the timesheet each worker signs at the start and end of a shift. The payroll report is a separate LCMS submission.

**Who signs the DSL Upload Certification?**

An officer of the contractor. The form is from the general contractor and covers its subcontractors' logs. Reading the form: it is addressed from the general contractor and signed by an officer of the Contractor, which the [General Conditions](https://dnnhh5cc1.blob.core.windows.net/portals/0/General/General%20Conditions/ConstructionGCFinalHBProjects101122R.pdf?sv=2017-04-17&sr=b&si=DNNFileManagerPolicy&sig=ZNSrFdPFPYdpjeXTuGRX2cd0m6vuVoG7icqpbMOCpPs%3D) define in section 1.01 as “any entity with whom the Contract is made by the SCA to perform the Work”, so a subcontractor's general contractor signs it. This is a reading of the form, not an SCA statement.

**How soon must a DSL be uploaded?**

The SCA's Labor Law Compliance page says a DSL must be uploaded immediately for every certified payroll rendered into LCMS. The upload guide, a file named 11-05-21, says within 30 days of the work completion date.

**My request for payment was returned. What do I do first?**

Work through the checklist at the top of this page. The SCA documents do not say which item causes a return.

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [Labor Law Compliance page](http://nycsca.org/Doing-Business/Labor-Law-Compliance) nycsca.org
2. [DSL instructions](http://www.nycsca.org/Portals/0/DSL%20-%20How%20to%20Complete.pdf) nycsca.org
3. [upload guide](http://www.nycsca.org/Portals/0/LCMS%20DSL%2011-05-21%20Update.pdf) nycsca.org
4. [DSL Upload Certification](http://www.nycsca.org/Portals/0/DSL%20Upload%20Certification_1.pdf) nycsca.org
5. [General Conditions for Construction Projects](https://dnnhh5cc1.blob.core.windows.net/portals/0/General/General%20Conditions/ConstructionGCFinalHBProjects101122R.pdf?sv=2017-04-17&sr=b&si=DNNFileManagerPolicy&sig=ZNSrFdPFPYdpjeXTuGRX2cd0m6vuVoG7icqpbMOCpPs%3D) dnnhh5cc1.blob.core.windows.net
6. [PDF](http://nycsca.org/Portals/0/DSL-Daily%20Signature%20Log.pdf) nycsca.org
7. [Excel](http://nycsca.org/Portals/0/DSL-SCA%20PM%20rev4%20%2804-18_1.xlsx) nycsca.org
8. [public certified payroll database](https://laborlaw.nycsca.org/Public/CPRPublicDirectory) laborlaw.nycsca.org
9. [Getting Paid page](http://nycsca.org/Doing-Business/Getting-Paid) nycsca.org

## Related

- [New York certified payroll: portal rules](https://wellstanding.com/guides/new-york-certified-payroll/)
- [The NYC Comptroller certified payroll report](https://wellstanding.com/guides/nyc-comptroller-certified-payroll-report/)
- [eComply certified payroll: login and rejections](https://wellstanding.com/guides/ecomply-certified-payroll/)
- [NYCHA certified payroll in eComply](https://wellstanding.com/guides/nycha-certified-payroll/)
- [Certified payroll requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/)