# SCDOT OJT forms B-04 and D-04: how they work and what happens when the D-04 is late

OJT reporting is not payroll, but on a contract with a Training Special Provision SCDOT's resident engineer checks it against your certified payroll. The rules below come from SCDOT's [On-the-Job Training Manual](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf), whose cover is dated March 4, 2025, and the [External EO and OJT page](https://www.scdot.org/business/bus-development-equal-opportunity.html) that links it.

Last reviewed November 6, 2026 against the sources it cites

The short answer

On a contract with a Training Special Provision (TSP), the D-04 is a monthly report on each OJT trainee, due to SCDOT's resident engineer by the 10th of the next month, even for zero hours. The engineer verifies its hours against your certified payroll. The manual sets no late penalty, but repeated non-compliance can bring a Stop Pay Memo. On a TSP contract, the B-04 training schedule is approved before work starts.

- SCDOT's [OJT Manual](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf), dated March 4, 2025 on its cover, requires on a contract with a Training Special Provision (TSP) a Monthly Training Status Report (D-04) for each trainee by the 10th of the month after the training hours, and a report showing zero hours when a trainee has none.
- On a TSP contract, the resident construction engineer or consultant verifies the D-04 training hours against the certified payroll, signs the form, and forwards the original to the Office of Civil Rights Programs ([manual, page 34](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf)).
- The manual says trainees should be identified as trainees, preferably in their specified training classification, on the certified payroll ([page 19](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf)).
- On a TSP contract, the OJT Program Coordinator may issue a Stop Pay Memo to withhold the monthly estimate for repeated failure to comply with the training requirements, and persistent failure can restrict bidding on future projects ([page 10](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf)).
- Transfer hours from other projects are capped at 25 percent of the required hours, and copies of the payrolls for those hours must be attached to the D-04 ([pages 5 and 6](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf)).
- On a TSP contract, SCDOT must approve the B-04 initial training schedule before work begins on the project, and a trainee may not accumulate hours until the C-04 enrollment is approved ([pages 3 and 4](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf)).

## OJT reporting is not payroll, but the two have to agree

The B-04 and D-04 are training forms, not part of your weekly certified payroll. They sit next to it for two reasons in SCDOT's [OJT Manual](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf). Trainees should be identified as trainees, preferably in their specified training classification, on the certified payroll (page 19). And, on a TSP contract, the resident construction engineer (RCE) or consultant verifies the D-04 training hours against the certified payroll, signs, and forwards the report to the Office of Civil Rights Programs (page 34). The RCE receives both documents: SCDOT's [April 2023 AASHTOWare guide](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/aashtoware/april-2023/12.%20Contractor%20Payrolls%20-%20Apr%2023.pdf) says prime and subcontractors on federally funded contracts submit certified payrolls to the RCE.

The manual says "should" about the marking. SCDOT's [2023 contractor presentation](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/2023-Contractor-TSP-Presentation.pdf) says on its transfer hours slide that trainees must be denoted as trainees on the certified payroll and initialed by the contractor while actively training. Use the stricter marking and ask the RCE. Payroll basics are in the [WH-347 guide](https://wellstanding.com/guides/wh-347/).

## Does the OJT manual apply to your job?

It applies in full when your contract carries a Training Special Provision (TSP). The [manual's cover letter](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf) says SCDOT assigns OJT slots to some federal-aid projects and that contractors in South Carolina must use the manual to meet TSP requirements. The state highway agency decides which contracts carry a TSP ([23 CFR 230.111(a)](https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-230/subpart-A/section-230.111)). Without a TSP, the manual calls its general-program guidelines suggested (page 13). Under that general program the D-04 is prepared by the 10th and kept in the contractor's training records, and the A-04, B-04 and G-04 are not submitted (pages 20, 23, 34, 35 and 51). On a local public agency (LPA) project whose contract includes a TSP, SCDOT's External EO and OJT page says to use the [LPA OJT Manual](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/SCDOT%20LPA%20OJT%20Manual.pdf) (dated March 4, 2025), which has the contractor send the D-04 to the LPA or its consultant by the 10th.

One source conflict: the cover letter says FHWA-1273 requires a general OJT program, but FHWA's [June 25, 2026 summary of changes](https://www.fhwa.dot.gov/construction/cqit/fhwa1273_changes260625.pdf) says training mandates were removed from the nondiscrimination section, and the [June 25, 2026 form](https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf) drops the general OJT-program requirement but keeps the trainee wage clause in Section III, paragraph 4.c (23 CFR 230.111(e)(2)). The manual (March 2025) has the SCDOT OJT Program Coordinator ensuring contractor compliance with general OJT on the basis of FHWA-1273, with on-site reviews (page 17). Because the June 2026 form no longer has that requirement, whether SCDOT still enforces a general program is not stated. A TSP is a contract clause, so follow the manual if your contract has one ([FHWA-1273 changes](https://wellstanding.com/guides/fhwa-1273-changes-2026/)).

## The D-04 Monthly Training Status Report

The D-04 is one report per trainee per month, cumulative until its columns are full ([manual, page 33](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf)). It records training hours, not all hours worked. Rows 11 and 12 take hours on the project where the trainee is approved, and hours from other projects go on rows 13 and 15. The weekly training logs, sample Form D-04-01 or D-04-02, are kept and not submitted unless the RCE asks (page 34).

### When it is due

On a TSP contract, the contractor submits the D-04 to the RCE or consultant by the 10th of the month after the training hours (pages 9 and 33). With calendar months, March hours are due April 10. A subcontractor sends its D-04s to the prime by the 5th, and the prime submits the whole project's reports by the 10th (page 12).

### Zero hours and the month definition

A report showing zero hours is required for a month with no training, until the trainee completes training or terminates (page 33). The contractor must tell the RCE whether its month is the calendar month or ends with the last complete week, the partial final week counting in the next month (page 33).

## What happens when the D-04 is late

On a TSP contract, the manual states no late fee, grace period, or count of late reports that triggers action. Its remedies are in [section 5, page 10](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf). The OJT Program Coordinator may issue a Stop Pay Memo to withhold the monthly estimate if the contractor shows repeated failure to cooperate and comply with the training requirements and procedures. Persistent failure can restrict future bidding for a specified period. SCDOT's 2023 presentation, under its "Steps To Ensure Compliance" heading, says the monthly or final pay estimate can be withheld on the entire project for failure to comply with TSP requirements. It drops the manual's word "repeated" and adds the final estimate. The manual is the contract-level document and controls.

That is a remedy for training non-compliance, not the withholding for unpaid wages and monetary relief in [FHWA-1273, section III, paragraph 2](https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf), covered in [Davis-Bacon withholding of contract payments](https://wellstanding.com/guides/davis-bacon-withholding-of-contract-payments/). The Stop Pay clause does not name the D-04, so how SCDOT counts late reports as "repeated" is a question for the Office of Civil Rights Programs.

If a D-04 is overdue, reconcile to payroll first (next section), then send the missing months, signed, to the RCE. The newest report carries the earlier months.

## Matching the D-04 to your certified payroll

The manual does not say what the RCE does when they disagree, so reconcile before you send. For each trainee:

1. **Find the trainee on every payroll in the report month,** marked as a trainee, preferably in the specified classification.
2. **Total this project's hours** for your month definition. Row 11 counts only hours the trainee was engaged in training activities (page 33), so it can be fewer than hours worked.
3. **Check the rate.** FHWA-1273 Section III, paragraph 4.c leaves trainee wage rates to the particular certified programs (23 CFR 230.111(e)(2)). The manual's minimum is 60 percent of the contract rate for the first half of training, 75 percent for the third quarter, 90 percent for the last, then 100 percent (pages 6 and 7).
4. **Attach payrolls for transfer hours,** which are capped at 25 percent of the required hours, so 260 of 1,040 (pages 5 and 6). Certified payrolls, or non-certified for private jobs.
5. **Confirm enrollment.** No hours accumulate until the coordinator approves the C-04 (page 4), and the 2023 presentation says earlier hours cannot be counted.

## The B-04 Initial Training Schedule

On a TSP contract, the B-04 is the per-project plan for filling the training slots ([manual, pages 2 and 23](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf)). Each line gives prime or sub, road or bridge slot, classification, required hours and the month training begins. The prime lists any subcontractor's slots (pages 11 and 12).

Send it to the Office of Civil Rights Programs (OJT Program Coordinator), not the RCE. SCDOT must approve it before work begins on the project, citing 23 CFR Part 230 (page 3). The 2023 presentation sets the due date at 30 calendar days after the OJT Awards Letter. Changes go on a new B-04 marked Revised. C-04 forms should wait until the B-04 is approved and an A-04 is on file (page 26).

## The other OJT forms at a glance

From the [manual's forms section](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf), pages 18 to 53. Under the general program the A-04, B-04 and G-04 are not submitted and the C-04 should not be sent to SCDOT (pages 20, 23, 27 and 51). The manual names the Coordinator as recipient in some places (page 11) and the Office of Civil Rights Programs in others (page 51), and the 2023 presentation says the Office, so the table uses both names:

| Form | What it is | Goes to (TSP contracts) | When (TSP contracts) |
| --- | --- | --- | --- |
| A-04 | Annual Update Form, signed by the company's OJT coordinator, covering all projects that year | Office of Civil Rights Programs (OJT Program Coordinator) | At first use, then when SCDOT requests it. The 2023 presentation says January 1 |
| C-04 | Trainee Enrollment Form, approved project by project | Office of Civil Rights Programs (OJT Program Coordinator), who answers in 2 to 3 days | Before training starts |
| E-04 | Trainee Termination Form, for any reason a trainee leaves | RCE, who signs and forwards it | On leaving, with the final D-04 |
| F-04 | Training Certificate; the original goes to the trainee | A copy with the final D-04 and E-04 | On completing all required hours |
| G-04 | Request for Payment, an original with signatures, at $0.80 an hour | Office of Civil Rights Programs (OJT Program Coordinator), prime for all subs | When SCDOT's letter asks for it |

## Which edition of the manual to use

SCDOT's External EO and OJT page links the edition dated March 4, 2025. Copies dated [January 3, 2025](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/SCDOT%20OJT%20Manual.pdf) and [April 14, 2023](https://www.scdot.org/business/pdf/businessDevelop/OJT-Manual.pdf) are still online. The D-04, Stop Pay Memo, transfer hour and payroll language read the same in all three; the 2025 editions differ in the poverty guideline table. The download address printed inside the manual returned a not-found page on November 6, 2026. For other states, see [certified payroll requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/).

We prepare certified payroll for public works contractors. Tell us about your project.

## Questions

**When is the SCDOT D-04 due?**

On a TSP contract, the contractor submits it to the RCE or consultant by the 10th of the month after the training hours. A subcontractor sends its reports to the prime by the 5th.

**Do I send a D-04 when a trainee had no training hours?**

Yes. The manual requires a zero-hour report each month until the trainee completes training or terminates.

**Can SCDOT withhold payment over a late D-04?**

On a TSP contract, the manual lets the OJT Program Coordinator issue a Stop Pay Memo for repeated failure to comply with the training requirements. It does not name the D-04 or say how many late reports count as repeated.

**Where do I send the OJT forms?**

On a TSP contract, address the A-04, B-04, C-04 and G-04 to the Office of Civil Rights Programs (OJT Program Coordinator), and the D-04, E-04 and F-04 to the RCE or consultant. The manual names the Coordinator in some places and the Office in others (pages 11 and 51). SCDOT's External EO and OJT page, read November 6, 2026, lists the coordinator post as vacant, so address OJT forms to the Office of Civil Rights Programs and confirm routing with your RCE ([SCDOT contact page](https://www.scdot.org/scdotcontactus.html)).

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [On-the-Job Training Manual](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/March%202025%20Edit%20Template%20for%20SCDOT%20OJT%20Manual%20Updated%20-%20March%203,%202025.pdf) scdot.org
2. [External EO and OJT page](https://www.scdot.org/business/bus-development-equal-opportunity.html) scdot.org
3. [April 2023 AASHTOWare guide](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/aashtoware/april-2023/12.%20Contractor%20Payrolls%20-%20Apr%2023.pdf) scdot.org
4. [2023 contractor presentation](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/2023-Contractor-TSP-Presentation.pdf) scdot.org
5. [23 CFR 230.111(a)](https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-230/subpart-A/section-230.111) ecfr.gov
6. [LPA OJT Manual](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/SCDOT%20LPA%20OJT%20Manual.pdf) scdot.org
7. [June 25, 2026 summary of changes](https://www.fhwa.dot.gov/construction/cqit/fhwa1273_changes260625.pdf) fhwa.dot.gov
8. [June 25, 2026 form](https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf) fhwa.dot.gov
9. [January 3, 2025](https://www.scdot.org/content/dam/scdot-legacy/business/pdf/businessdevelop/SCDOT%20OJT%20Manual.pdf) scdot.org
10. [April 14, 2023](https://www.scdot.org/business/pdf/businessDevelop/OJT-Manual.pdf) scdot.org
11. [SCDOT contact page](https://www.scdot.org/scdotcontactus.html) scdot.org

## Related

- [Certified payroll requirements by state](https://wellstanding.com/guides/certified-payroll-requirements-by-state/)
- [How to fill out the WH-347](https://wellstanding.com/guides/wh-347/)
- [FHWA-1273 changes in 2026](https://wellstanding.com/guides/fhwa-1273-changes-2026/)
- [The FHWA-1391 report in 2026](https://wellstanding.com/guides/fhwa-1391-report/)
- [Davis-Bacon withholding of contract payments](https://wellstanding.com/guides/davis-bacon-withholding-of-contract-payments/)
- [SCDOT certified payroll](https://wellstanding.com/guides/scdot-certified-payroll/)