# California prevailing wage for solar installers: when it applies

Three statutes cover the common cases: [Labor Code 1720](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1720), [Labor Code 1720.6](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1720.6), and [Public Utilities Code 769.2](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=769.2). DIR's [Public Works Manual](https://www.dir.ca.gov/dlse/PWManualCombined.pdf) (October 2023) summarizes the first two.

Last reviewed November 13, 2026 against the sources it cites

The short answer

Yes, in three common cases. Solar is public works when public money pays for it (Labor Code 1720), when it is built on state or local government property and the government buys over half the power or the work cuts its energy costs (Labor Code 1720.6), or when a facility built after 2023 takes service under a net metering or net billing tariff (PUC 769.2), unless an exemption such as a single-family home applies. Other rules may also apply.

- [Public Utilities Code 769.2](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=769.2)(a) makes construction after December 31, 2023 of a renewable generation facility and its battery storage public works for prevailing wage purposes when it receives service under the tariff developed under section 2827.1.
- [Section 769.2](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=769.2)(f) exempts a residential facility of 15 kilowatts or less, a residential facility on a single-family home, and a facility serving only a modular home, modular community, or multiunit housing of two stories or fewer.
- [Labor Code 1720.6](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1720.6) covers private-contract renewable energy work on state or local government property when the government buys more than 50 percent of the energy or the efficiency work is meant to cut its energy costs.
- A contractor on a 769.2 project must submit digital copies of certified payroll to the Public Utilities Commission on July 1 and December 31 each year, per section 769.2(b)(3) and the [CPUC prevailing wage page](https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/prevailing-wage-for-qualified-renewable-energy-facilities).
- Since January 1, 2026 the prime contractor is the awarding body on a 769.2 project for the limited purpose of DIR project registration (Labor Code 1773.3, PUC 769.2(g)), according to the [SURGE awarding body fact sheet](https://cpucsurge.org/wp-content/uploads/2026/05/AB-2143-Awarding-Body-Update-1.pdf).

## Does a solar installer owe prevailing wage in California?

Yes, when one of three common triggers is present. The trigger decides, not the technology or the customer type. Other parts of Labor Code 1720 and the federal IRA rules can apply separately.

| Trigger | Rule | Typical job |
| --- | --- | --- |
| Public money | [Labor Code 1720](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1720)(a)(1) and (b): work paid for in whole or in part out of public funds | A city, school district, or county contracts for the array |
| Public property | [Labor Code 1720.6](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1720.6): private contract work on state or local government property | A developer builds on a school roof and sells the school the power |
| Net metering or net billing tariff | [Public Utilities Code 769.2](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=769.2): facility built after 2023 on a section 2827.1 tariff | A privately owned warehouse array that exports to the grid |

The Public Works Manual lists only the first two routes by section number. The third came from AB 2143, which the [CPUC](https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/prevailing-wage-for-qualified-renewable-energy-facilities) describes as requiring prevailing wages for large customer-sited renewable generation, and any battery storage, that enrolls in net metering or net billing tariffs beginning January 1, 2024.

## Trigger 1: public money

### Public funds

Section 1720(a)(1) covers construction, installation, and repair done under contract and paid for in whole or in part out of public funds. Subdivision (b) defines that broadly: money paid by the state or a political subdivision directly or on its behalf, a transfer of an asset for less than fair market price, and rents, fees, or loans charged below fair market value or waived. Whether a below-market lease of public land counts depends on subdivision (b), which reaches rents or fees "that would normally be required in the execution of the contract" when charged below fair market value. Our [public works coverage guide](https://wellstanding.com/guides/is-my-project-public-works-california/) walks through the exclusions, including the small-subsidy rule in subdivision (c)(3).

### One exclusion to know

Section 1720(a)(1) carves out work done directly by a public utility company under an order of the Public Utilities Commission or other public authority.

## Trigger 2: public property

### Private contract on government property

Section 1720.6 applies, for the limited purposes of Article 2 (commencing with section 1770), when all three conditions hold:

1. The work is in connection with building or maintaining renewable energy generating capacity or energy efficiency improvements.
2. It is performed on the property of the state or a political subdivision.
3. Either more than 50 percent of the energy generated is or will be purchased by the state or a political subdivision, or the efficiency improvements are primarily intended to reduce energy costs the government would otherwise pay.

The Public Works Manual (section 2.4.4) paraphrases the energy test as "50 percent". The statute says "more than 50 percent", so use the statute. Article 2 is where the duty to pay the prevailing rate and to keep payroll records sits.

## Trigger 3: a net metering or net billing tariff (AB 2143)

Under section 769.2(a), construction of a renewable electrical generation facility, and associated battery storage, after December 31, 2023 is public works for Article 2 purposes when it receives service under the standard contract or tariff developed under Public Utilities Code 2827.1. This applies "notwithstanding" section 1720(a)(1), so no public money is needed. The CPUC lists the tariffs for PG&E, SCE, and SDG&E, among them NEM, NEM2, and NBT. Section 769.2(a) names only tariffs developed under section 2827.1, while subdivision (d) refers to both section 2827 and section 2827.1, and the CPUC list is broader and includes NEM and NEM2, so confirm your tariff against the [CPUC list](https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/prevailing-wage-for-qualified-renewable-energy-facilities).

### Exemptions in section 769.2(f)

- A residential facility eligible for the tariff with a maximum capacity of 15 kilowatts or less.
- A residential facility eligible for the tariff that is installed on a single-family home.
- A project that is already public works under section 1720 and subject to Article 2.
- A facility that serves only a modular home, a modular home community, or multiunit housing of two stories or fewer.

### Which date counts

The CPUC says [Decision 23-11-068](https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M520/K977/520977266.PDF) uses the interconnection application date as the starting point for eligibility, and that ongoing work that started before January 1, 2024, with an active and open interconnection application before that date, is not considered subject to prevailing wage requirements for purposes of accessing the net energy or net billing tariffs. The CPUC adds that loss or rejection of such an application may adjust requirements. The CPUC warns that "If qualified construction work occurs before the application is submitted and assessed," the applicant and its project may be out of compliance with state law.

## What a private commercial installer must check

1. **Who owns the property.** State or local government ownership points to section 1720.6.
2. **Who buys the power.** Over 50 percent bought by a public body satisfies 1720.6(c)(1). A private offtaker does not, by itself.
3. **Any public money or below-market public asset.** Grants, loans, waived fees, or discounted rent from a public body point to section 1720.
4. **The interconnection tariff.** A net metering or net billing application filed for a building that is not on the 769.2(f) exemption list points to section 769.2.
5. **The project date and size.** Check the construction date against December 31, 2023 and the interconnection application date.

### Worked examples

| Job | Result under the statutes above |
| --- | --- |
| Developer installs an array on a school roof and the district buys all the output | Public works under section 1720.6 |
| Private warehouse, non-residential array on a net billing tariff, interconnection application filed after 2023 | Public works under section 769.2, no exemption in subdivision (f) fits |
| Array on a single-family home on a tariff | Exempt from section 769.2 under subdivision (f)(2) |
| Private building, no tariff, no public money, no public property | None of the three common triggers apply, though other parts of Labor Code 1720 or the IRA rules could still matter. Confirm in writing with the owner |

If a job is also claiming federal credits, that is a separate test. Our [IRA prevailing wage guide](https://wellstanding.com/guides/inflation-reduction-act-prevailing-wage-california/) covers it.

## What classification do solar installers fall under?

There is no single "solar installer" rate. DIR sets rates by craft and county, so you pay the classification that matches the work. DIR's current Ironworker scope of work says that for installation of solar and photovoltaic systems in Imperial, Los Angeles, and San Diego Counties, the [minimum rate of pay is that of Electrician: Inside Wireman](https://www.dir.ca.gov/oprl/2026-2/PWD/Scope/Statewide/C-020-X-1-Sco.pdf). DIR's [February 22, 2010 laborers notice](https://www.dir.ca.gov/oprl/Important_Notices_Archive/02-22-2010(so_laborers).pdf) says the same minimum for those counties and says laborer rates for solar energy installations shall not be applied there. That notice is old, so confirm it against the current determinations. Notices for other crafts are in DIR's [important notices archive](https://www.dir.ca.gov/oprl/Important_Notices_Archive/Important_notices_archive.htm). For other counties, read the scope of work for each craft on your crew. Our [scope of work guide](https://wellstanding.com/guides/prevailing-wage-scope-of-work-classification-california/) shows how.

## Registration and payroll filings

Section 769.2(b) requires the contractor to pay each construction worker at least the general prevailing rate, pay registered apprentices at least the apprentice rate, and keep and verify payroll records under [Labor Code 1776](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1776). The filings stack, per the [CPUC SURGE site](https://cpucsurge.org/):

1. **DIR contractor registration.** Prime contractors and subcontractors obtain a public works contractor registration number. See [DIR contractor registration](https://wellstanding.com/guides/public-works-contractor-registration-dir/) and [Labor Code 1725.5](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1725.5).
2. **DIR awarding body and project registration.** Under AB 1104 (see [section 769.2(g)](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=769.2)), effective January 1, 2026, the prime contractor is the awarding body for the limited purpose of [DIR project registration](https://wellstanding.com/guides/pwc-100-explained/) (Labor Code 1773.3, PUC 769.2(g)) and registers the project with DIR. SURGE says to do it within 30 days of award and no later than the first day workers are employed on the project.
3. **DIR eCPR.** SURGE says submitting to SURGE does not replace uploading certified payroll to DIR. See the [eCPR guide](https://wellstanding.com/guides/dir-ecpr-system/).
4. **SURGE contractor registration, project registration, and payroll copies.** Payroll copies are due July 1 and December 31, and the CPUC keeps them as public records for five years under section 769.2(b)(3).

Section 769.2(c) lets the Labor Commissioner issue a [civil wage and penalty assessment](https://wellstanding.com/guides/civil-wage-and-penalty-assessment-california/) within 18 months after the facility is completed. An underpaid worker or a joint labor-management committee can also sue. Under subdivision (d), a facility with an enforced willful violation stays eligible for the tariff if restitution is made and penalties are paid.

## What to do next

1. Run the five checks above before you bid, and put the answers in the contract file.
2. Pull the determination for each craft and county, and register with DIR, the project, and SURGE if section 769.2 applies.
3. Set up weekly payroll that can feed the eCPR and the SURGE copies. See [certified payroll deadlines](https://wellstanding.com/guides/certified-payroll-deadlines-california/).

WellStanding prepares the WH-347 and the eCPR from the payroll export you already run, and a person reviews every filing. You review the finished filing and sign the certification in one step, and nothing is filed until you have signed; we never sign for you.

## Questions

**Do commercial solar installers have to pay prevailing wage in California?**

When a trigger applies: public money, government property with a government power purchase or energy cost purpose, or a net metering or net billing tariff facility built after 2023 that no subdivision (f) exemption covers. Without a trigger, the statutes on this page do not require it.

**Does a private rooftop job need prevailing wage?**

Not on the strength of the building being private. Check the tariff: a non-residential facility on a section 2827.1 tariff is covered by Public Utilities Code 769.2 unless an exemption applies.

**Is a single-family home solar install exempt?**

From section 769.2, yes: subdivision (f)(2) exempts a residential facility on a single-family home that is eligible for the tariff. Labor Code 1720(c)(1) separately excludes private residential projects on private property unless built under an agreement with a state agency, redevelopment agency, or local public housing authority.

**When is solar certified payroll due to the CPUC?**

July 1 and December 31 each year, under section 769.2(b)(3). It is in addition to the eCPR upload to DIR.

## Sources

Every figure on this page links to its source where it first appears. The full list, in order:

1. [Labor Code 1720](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1720) leginfo.legislature.ca.gov
2. [Labor Code 1720.6](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1720.6) leginfo.legislature.ca.gov
3. [Public Utilities Code 769.2](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=769.2) leginfo.legislature.ca.gov
4. [Public Works Manual](https://www.dir.ca.gov/dlse/PWManualCombined.pdf) dir.ca.gov
5. [CPUC prevailing wage page](https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/prevailing-wage-for-qualified-renewable-energy-facilities) cpuc.ca.gov
6. [SURGE awarding body fact sheet](https://cpucsurge.org/wp-content/uploads/2026/05/AB-2143-Awarding-Body-Update-1.pdf) cpucsurge.org
7. [Decision 23-11-068](https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M520/K977/520977266.PDF) docs.cpuc.ca.gov
8. [minimum rate of pay is that of Electrician: Inside Wireman](https://www.dir.ca.gov/oprl/2026-2/PWD/Scope/Statewide/C-020-X-1-Sco.pdf) dir.ca.gov
9. [February 22, 2010 laborers notice](https://www.dir.ca.gov/oprl/Important_Notices_Archive/02-22-2010(so_laborers).pdf) dir.ca.gov
10. [important notices archive](https://www.dir.ca.gov/oprl/Important_Notices_Archive/Important_notices_archive.htm) dir.ca.gov
11. [Labor Code 1776](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1776) leginfo.legislature.ca.gov
12. [CPUC SURGE site](https://cpucsurge.org/) cpucsurge.org
13. [Labor Code 1725.5](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1725.5) leginfo.legislature.ca.gov

## Related

- [Is my project public works in California?](https://wellstanding.com/guides/is-my-project-public-works-california/)
- [IRA prevailing wage rules](https://wellstanding.com/guides/inflation-reduction-act-prevailing-wage-california/)
- [DIR contractor registration](https://wellstanding.com/guides/public-works-contractor-registration-dir/)
- [The DIR eCPR system](https://wellstanding.com/guides/dir-ecpr-system/)
- [Project thresholds](https://wellstanding.com/guides/prevailing-wage-project-thresholds/)