---
title: Certified Payroll Requirements for County of San Bernardino - Project Management Division Projects
url: https://wellstanding.com/requirements/county-of-san-bernardino-project-management-division/
description: County of San Bernardino - Project Management Division public works projects: the portal situation, the DIR eCPR duty, deadlines and penalties, with live.
type: body
publisher: WellStanding Certified Payroll
---
# Certified payroll requirements for County of San Bernardino - Project Management Division projects

What California public works subcontractors owe, and keep owing every payroll week, when the awarding body is County of San Bernardino - Project Management Division. With live registration data from DIR project filings.

Data updated 2026-10-18

12projects registered 2026-06-26 to 2026-10-18

19subcontractor listings on those projects

Requireddirect DIR eCPR filing on this body's projects

## Recent County of San Bernardino - Project Management Division project registrations

New PWC-100 project registrations naming County of San Bernardino - Project Management Division as the awarding body, from DIR's public project registry. Every one of these projects means certified payroll for every contractor and sub on it, starting with the first week worked.

| Project | Registered | Scope |
| --- | --- | --- |
| 10.10.1475 Linac Replacement | 2026-10-06 | JOC: OCPW - Los Alamitos Pump Station Heat Exchanger Replacement |
| 303 W 5th Street Design Build | 2026-10-01 |  |
| SHR EVOC Asphalt & Lighting (Fire Alarm) | 2026-09-30 | Remodel of an existing bathroom facility, demolition and expansion of the existing splash pad, upgraded primar |
| Yucaipa Pedestrian Bridge Repair | 2026-09-29 |  |
| SHR HDDC Rec Cntr Yd Dvdrs | 2026-09-25 |  |
| VV DA Parking Lot Repairs | 2026-09-17 |  |
| PRB Training Center Ext. Maintenance | 2026-09-17 | PAINTING OF KITCHEN AT HESPERIA JR. HIGH SCHOOL |
| 412 Exterior Lighting Improvements | 2026-09-14 |  |

## The portal situation

We have not verified a dedicated compliance portal for County of San Bernardino - Project Management Division. Your contract documents are the source of truth: if a system like LCPtracker, Elation, or PRISM is named, uploads there are the awarding body's monitoring copy. Either way the direct DIR eCPR filing under your own registration is a separate, standing obligation on non-exempt projects ([DIR eCPR FAQ](https://www.dir.ca.gov/Public-Works/ecprfaq.html)).

## Your filing duties on these projects

- **Direct DIR eCPR filing.** On a registered public works project you submit electronic certified payroll records directly to DIR at least monthly, or more often when the contract says so, under your own PWCR registration ([Labor Code 1771.4](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1771.4)). DIR is explicit that submitting certified payroll to the awarding body, the prime, or a portal "does not put you in compliance with the state unless you submit eCPRs directly to DIR" ([DIR eCPR FAQ](https://www.dir.ca.gov/Public-Works/ecprfaq.html)).
- **Federal WH-347 weekly** when federal money is in the project, with the Statement of Compliance signed ([U.S. Department of Labor](https://www.dol.gov/agencies/whd/forms/wh347)).
- **Records on demand.** A written request for certified payroll records starts a 10 day clock. Miss it and the penalty is $100 per worker per calendar day, enforceable by withholding from your progress payments ([Labor Code 1776](https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=LAB&sectionNum=1776)). From January 1, 2027, [SB 909](https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=202520260SB909) (Chapter 660, Statutes of 2026) raises it to $140 per worker per calendar day; [what SB 909 changes](https://wellstanding.com/guides/sb-909-prevailing-wage-penalty-increases-2027/).

## Working for a county

County public works departments buy across every trade, and several of the large counties run third-party compliance portals. A county portal upload is the county's monitoring copy. Unless the county is one of the four legacy Labor Compliance Programs, the direct DIR eCPR filing is still owed under your own registration.

## Trades recently listed on County of San Bernardino - Project Management Division work

- General building (B): 9 contractors
- General engineering (A): 5 contractors
- Electrical (C-10): 4 contractors
- Painting and decorating (C-33): 2 contractors
- Concrete (C-8): 2 contractors
- Building moving and demolition (C-21): 2 contractors

### Keep reading

- [California certified payroll: the complete guide](https://wellstanding.com/guides/california-certified-payroll/)
- [LCPtracker vs DIR: why the GC's portal does not make you compliant](https://wellstanding.com/guides/lcptracker-vs-dir/)
- [Certified payroll penalties in California](https://wellstanding.com/guides/certified-payroll-penalties-california/)

### Other county requirements

- [County of Sacramento](https://wellstanding.com/requirements/county-of-sacramento/)
- [County of Los Angeles](https://wellstanding.com/requirements/county-of-los-angeles/)
- [County of Santa Barbara General Services, Procurement Services](https://wellstanding.com/requirements/county-of-santa-barbara-general-services-procurement-services/)
- [San Joaquin County - Purchasing & Support Services](https://wellstanding.com/requirements/san-joaquin-county-purchasing-support-services/)
- [County of Orange/OC Public Works](https://wellstanding.com/requirements/county-of-orange-oc-public-works/)
- [All county pages](https://wellstanding.com/requirements/type/county/)

### Works with the payroll you already run

- [QuickBooks Online](https://wellstanding.com/for/quickbooks-online/)
- [QuickBooks Desktop](https://wellstanding.com/for/quickbooks-desktop/)
- [ADP](https://wellstanding.com/for/adp/)
- [Paychex](https://wellstanding.com/for/paychex/)
- [Gusto](https://wellstanding.com/for/gusto/)
- [Sage](https://wellstanding.com/for/sage/)
