Colorado SBP-2.1 and SBP-2.4: the apprenticeship certification and the owner-operator affidavit

This page reads two forms from the Office of the State Architect, the SBP-2.1 Apprenticeship Utilization Certification and the SBP-2.4 Owner Operator Affidavit, against C.R.S. 24-92-115 and the OSA prevailing wage and apprenticeship page.

Last reviewed against the sources it cites

The short answer

SBP-2.1 is the apprenticeship certification a general contractor gives the state on a non-federal state project of $1 million or more, naming the mechanical, sheet metal, fire suppression, sprinkler, plumbing and electrical subs. From July 1, 2026 those subs need a 20 percent graduation record. SBP-2.4 is the affidavit an owner who works personally signs in the first week, with proof of ownership.

  • C.R.S. 24-92-115(1)(a) applies, unless prohibited by applicable federal law, to a public works contract of one million dollars or more that receives no federal money, and covers mechanical, sheet metal, fire suppression, sprinkler fitting, electrical and plumbing work.
  • The graduation record the subs must show is 15 percent through June 30, 2026, 20 percent from July 1, 2026 through June 30, 2031, and 30 percent from July 1, 2031, in at least three of the past five years (24-92-115(1)(a)(II)).
  • The SBP-2.1 form, marked Rev. 06/2026, prints the 20 percent figure and says a willful falsification means the agency directs the general contractor to terminate the sub immediately.
  • The SBP-2.4 affidavit must be submitted the first week on the job, and a W-9 or a bare federal ID number is not accepted as proof of ownership.
  • Without proof of ownership, the SBP-2.4 instructions say you are not an owner-operator and must pay and report prevailing wages for yourself.

What the two forms are

Both forms come from the Office of the State Architect (OSA), which runs prevailing wage and apprenticeship for Colorado public projects that receive no federal money (OSA page). They are different forms for different people.

SBP-2.1SBP-2.4
Who signsThe general contractorAn owner who performs work personally
What it is aboutWhether the mechanical, electrical and plumbing type subs run registered apprenticeship programsWhether you are a bona fide owner-operator or must be paid and reported as an employee
Dollar line$1 million or more, no federal moneyNone printed
Edition readRev. 06/2026Revised June 25 (OSA lists it as Rev 6/2025)

The weekly payroll rules, the $500,000 prevailing wage line and the LCPtracker steps are on our Colorado certified payroll guide. This page does not repeat them.

SBP-2.1: when a state project requires it

Section 24-92-115(1)(a) says that, unless prohibited by applicable federal law, the contract for a public works project that receives no federal money, in the amount of one million dollars or more, must require the general contractor to submit documentation to the agency. The same text appears in the 2024 Colorado Revised Statutes. OSA says the same: federal-funded projects are exempt, and $1 million or more triggers the apprenticeship duty.

Who is outside it

Subsection (1)(b) says the section does not apply to the Colorado Department of Transportation, whatever the amount or funding. It also does not apply to a county, city, municipality, town, school district, special district or any other political subdivision of the state. A school district or city job of any size is outside SBP-2.1. CDLE INFO #13 (April 30, 2024) repeats these exclusions. For CDOT federal-aid work, see our FHWA-1273 guide.

Which trades

The statute lists six in subsection (1)(a): mechanical, sheet metal, fire suppression, sprinkler fitting, electrical and plumbing. Subsection (7), effective January 1, 2024, sets a separate track for energy sector public works projects as defined in 24-92-303(5), and INFO #13 addresses it. The SBP-2.1 form cites only 24-92-115 and does not mention subsection (7). The form lists the same six and labels sheet metal as MEP work. The statute does not carry that label; it names all sheet metal work required on the project. If you are a sheet metal sub on a covered job, ask the agency which reading it applies.

The apprenticeship test, and the July 1, 2026 change

Each firm named must participate in an apprenticeship program registered with the U.S. Department of Labor or a state apprenticeship agency it recognizes. It must also have a record of graduating apprentices at a minimum percentage in at least three of the past five years (24-92-115(1)(a)(II)).

PeriodMinimum graduation record
July 1, 2021 through June 30, 202615 percent
July 1, 2026 through June 30, 203120 percent
July 1, 2031 and each year after30 percent

The current SBP-2.1 already prints twenty percent. "Graduating" means completing a multi-year program, including the classroom and on-the-job requirements, with a certificate of completion from the U.S. Department of Labor's Office of Apprenticeship or under article 15.7 of title 8 (subsection (1)(c)). A sub that qualified at 15 percent can fall short at 20, so ask your general contractor for the figure it needs before bid day. A registered program without the three-year record may petition CDLE for conditional approval under 24-92-115(6) (see INFO #13).

What goes on SBP-2.1

FieldWhat the form asks
Institution/Agency, Project No./Name, General ContractorThe project identifiers
Trade and SubcontractorOne row each for mechanical, sheet metal, fire suppression, sprinkler fitting, plumbing and electrical, with the firm named
Union CertificationA column beside each sub
AttachmentsFor each trade, documentation that all firms named participate in apprenticeship programs as the statement describes
Certification statementThe general contractor certifies the registration and graduation record, agrees to supply supporting documentation from the Department of Labor's apprenticeship office, and agrees to give the agency more documentation on request
Signature blockDate, full legal name of the general contractor, and the person signing

The form says the contracting agency makes the documentation public within thirty days of submission, as subsection (2) does. The statute and the form both say the general contractor supplies the supporting documentation from the Department of Labor's apprenticeship office.

When it is due

The statute says the documentation is due "at the time the mechanical, electrical, or plumbing subcontractor is put under contract" (subsection (1)(a)). OSA's FAQ words it differently: general contractors submit the certification prior to the execution of the contract for the six trades. The SBP-2.2 waiver form likewise says it must be submitted before contract execution. So the statute says when the MEP sub is put under contract, and OSA's FAQ and the SBP-2.2 form say before contract execution. Either way, have the certification in before the MEP sub is signed.

What happens on a false certification

The sources state a consequence only for willful falsification or misrepresentation. Under subsection (3), which names mechanical, electrical or plumbing subcontractors (the form says subcontractor), if the agency decides a sub willfully falsified documentation or willfully misrepresented its qualifications, it must direct the general contractor to terminate that subcontract immediately, and the sub is removed from the project. The Director of the Department of Personnel may start debarment of the general contractor under section 24-109-105, and the state may pursue other remedies. INFO #13 states the practical rule: on these projects the contractor must use firms that participate in registered programs for these six trades.

The waiver

Under subsection (4) the agency may waive the section after evaluating bids if there is substantial evidence that no responsive, eligible subcontractors were available for the mechanical, electrical or plumbing work. It must publish each waiver and its reasons. OSA's Request for Apprentice Waiver (SBP-2.2) has two boxes: no responsive, eligible subcontractors bid, or no responsive, eligible apprenticeship program within 50 miles one way of the project. The second box is on the form but not in the statute text. The SBP-2.2 form says it must be submitted to OSA before contract execution, and each option carries an OSA-use-only "Confirmed - Approved" line.

SBP-2.4: the owner-operator affidavit

The SBP-2.4 is for contractors who perform work personally. They must submit it the first week on the job to establish that they are a bona fide owner-operator: a sole proprietor or partnership, or an owner of a corporation or limited liability company. The form states no dollar threshold. It sits on OSA's list of labor compliance forms for state projects.

What counts as proof

Enclose a copy of at least one document that proves you own the business. The form says more than one may be needed.

AcceptedNotes
Form 1040 Schedule C
IRS Federal ID Number letter
Trade name registration
Articles of Organization or Incorporation
Vehicle registration, certificate of insurance, employees' driver licensesTruck Companies Only

A W-9 is not acceptable, and giving a federal ID number is not acceptable. If the paper does not prove ownership, the form says you will not be treated as an owner-operator and must pay and report prevailing wages for yourself.

How it connects to payroll

  1. Sign the affidavit. Fill in the signatory's name and title, the firm, a description of all the work or the specific classes of work, the company address and phone, your signature and date, and your title as owner.
  2. Attach the proof. Add the documents above.
  3. Upload it. The form says to scan it and upload it to LCPtracker eDocuments with the backup documentation.
  4. Still enter your hours. The form says hours worked on the job must be submitted in LCPtracker. The affidavit does not replace that.

The signature block carries an oath. The form's notice says a materially false statement made to induce payment by the auditor may lead to criminal prosecution for perjury. Do not sign unless you personally do the work you list. Our state requirements table shows where Colorado sits among the states.

Which edition to use

The PDF read for this page says "Revised June 25" in its footer, and OSA's page lists it as Rev 6/2025. Download it from OSA's page, not from a project manual, so you have the current edition.

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Does SBP-2.1 apply to a CDOT job or a school district job?
No. Subsection (1)(b) of 24-92-115 excludes CDOT whatever the amount, and political subdivisions including school districts and cities.
Does the 20 percent rate apply to every apprentice program?
It applies to each firm named on the form for the six trades, measured over at least three of the past five years, from July 1, 2026. The exception is a program with conditional approval under subsection (6).
Who signs SBP-2.1, the sub or the general contractor?
The general contractor. The signature block names the general contractor, and the statute and form say the general contractor supplies the supporting documentation from the Department of Labor's apprenticeship office.
Can I use a W-9 as owner proof on SBP-2.4?
No. The form says a W-9 and a bare federal ID number are not acceptable. Use a Schedule C, an IRS ID letter, a trade name registration or articles.
If I sign SBP-2.4, do I still enter hours in LCPtracker?
Yes. The form says hours worked on the job must be submitted in LCPtracker.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. SBP-2.1 Apprenticeship Utilization Certification osa.colorado.gov
  2. SBP-2.4 Owner Operator Affidavit osa.colorado.gov
  3. C.R.S. 24-92-115 colorado.public.law
  4. OSA prevailing wage and apprenticeship page osa.colorado.gov
  5. 2024 Colorado Revised Statutes leg.colorado.gov
  6. CDLE INFO #13 cdle.colorado.gov
  7. SBP-2.2 waiver form osa.colorado.gov

Questions about your project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us