MoDOT Form CR-1: the wage interview and how it is checked against your payroll

The CR-1 is the Employee Interview form that MoDOT staff fill in with your workers on site. This page reads the CR-1 dated 09/2026, MoDOT's Engineering Policy Guide (EPG) 110.3 as last edited on September 3, 2026, and 29 CFR 5.5.

Last reviewed against the sources it cites

The short answer

Form CR-1 is MoDOT's Employee Interview form. A resident engineer or delegate fills it in with one of your workers on site, at least once per 10 days of your work activity, and the office checks it against your certified payroll. A mismatch is logged on the form. If it shows an underpayment, MoDOT asks for a corrected payroll, a new statement of compliance and, for larger errors, proof of restitution.

  • EPG 110.3.1 has the resident engineer or a delegate conduct the interviews, with a minimum of one for each 10 days of work activity by the contractor or subcontractor.
  • The CR-1 that MoDOT's forms list links today is dated 09/2026 and asks about wage rate posters, work and tools today, pay frequency, overtime at time and a half, withholdings and compensation concerns.
  • The 09/2026 form does not ask the worker for an hourly rate: its office box copies the classification, base wage, fringe and total wage from your certified payroll and compares the total with the required wage.
  • The archived 08/2015 copy asked the worker for pay per hour, base and fringe, and carried EEO and training questions that the 09/2026 form drops.
  • Under EPG 110.3.2, a corrected payroll keeps the same number, is marked "corrected" or "amended", and comes with a new statement of compliance.
  • On a contract with the federal clause, 29 CFR 5.5(a)(3)(iv) requires you to let authorized representatives interview workers during working hours on the job.

What the CR-1 is and who fills it in

The resident engineer or a delegated representative conducts wage rate interviews as part of MoDOT's compliance checks. EPG 110.3.1 says every interview is recorded on the CR-1, every question is asked, and the response is noted. The form has no line for the worker or the contractor to sign.

You do not submit it. The payroll checker compares it with your certified payroll: the EPG payroll checklist says to check interviews taken within the period the payroll covers and to record any discrepancy on the CR-1 and in AASHTOWare Project (AWP).

The EPG addresses MoDOT staff. The 2026 Standard Specifications, Sec 110.3.2, open your payroll records to inspection by the Department of Labor and Industrial Relations or the Commission and have you send certified payrolls to the engineer each week. They do not mention interviews, so read your contract for added terms. On a contract with the federal clause, 29 CFR 5.5(a)(3)(iv) requires you to let authorized representatives interview workers during working hours on the job. Refusal can lead to suspended payments after written notice and may be grounds for debarment. Our HUD-11 guide covers that federal duty.

The edition matters. EPG's Standard Forms list links a CR-1 whose footer reads "Form CR-1 Compliance 09/2026". Neither EPG article names a CR-1 revision; the 09/2026 date appears only in the form's footer. Archived copies dated 04/2009 and 08/2015 ask different questions. This page follows the 09/2026 form.

What the inspector asks and where each answer shows up in your payroll

The right column is a plain reading of where each answer meets your records, not MoDOT's method. It draws on the EPG 110.3 payroll checklist and EPG 110.1 (last edited August 1, 2025).

Question on the 09/2026 formWhere it shows up in your payroll
Name and last four digits of the Social Security numberThe name and employee ID columns. EPG bars full Social Security numbers and addresses on certified payrolls.
Job classification (craft)The classification column. EPG says each employee needs one, correct for the work your company subcontracted.
Apprentice or trainee?A worker in MoDOT's training program is shown in the classification enrolled in as trainee, such as Crane Operator Trainee. An apprentice needs written proof of the program, the registration and the percentage of prevailing wage.
Wage rate posters pointed out?No payroll column. EPG 110.1 has the full wage order on the bulletin board, or kept in the job trailer or foreman's truck with workers told where, or a one page county sheet on the board that says where the full order is.
Work today, tools and equipment today, work this past weekClassification and hours by day. A foreman or supervisor who uses the tools of the trade more than 20 percent of the day is not exempt, and the payroll shows each classification worked each day, on separate lines if the rates differ.
How often are you paid?The pay date and week on the payroll. EPG counts the 7 day submission clock from the payment date; our Missouri guide covers it. Under the federal clause, 29 CFR 5.5(a)(1)(i) requires pay at least once a week.
Overtime paid at time and a half?Overtime hours and rate. Where state and federal overtime rules differ on federally funded work, EPG says the worker must get the higher total for the pay period.
Do you understand your withholdings?The deduction columns and the statement of compliance. EPG has every deduction identified, an "other" explained, and a non-standard deduction backed by the employee's signed agreement kept with the payrolls.
Any concerns about your compensation?No payroll column. The interviewer notes what to follow up.

The office review box

The office copies your payroll's classification, base wage, fringe and total wage into the box and sets the total against the required wage. It then marks whether the trade is correct for the work, whether the total meets or exceeds the required wage, and any discrepancies. Under the EPG checklist, base plus fringe must match or exceed the wage order's base plus fringe, so a lower base can pass if the fringe makes up the gap.

When the interview does not match the payroll

EPG sets steps for particular findings rather than one path for every mismatch.

  1. The office records it. EPG checklist item 8c has the discrepancy recorded on the CR-1 and in AWP. Separately, the checklist has MoDOT notify you of payroll violations and track the actions taken until they are corrected (item 1b). The CR-1 box marks whether there are discrepancies and has a remarks line for the date and action.
  2. More interviews follow. EPG 110.3.1 says interviews should increase after inaccuracies, until the resident engineer is confident you comply.
  3. An underpayment gets a correction. EPG 110.3.2 has MoDOT ask for a corrected payroll with the same number, marked "corrected" or "amended", and a new statement of compliance. For non-trivial errors, especially across several payrolls, or corrections that follow an investigation, audit or inquiry, it requires proof of restitution to each employee, such as copies of checks or paystubs. Our Missouri guide compares how other owners label corrections.
  4. Hard cases go to the Division of Labor. The resident engineer investigates within limits and refers cases beyond MoDOT's ability. When a wage rate is believed to be below the contract's lawful minimum, EPG says the Division of Labor is notified. It opens a complaint at the request of MoDOT, the employee, the union or a third party, investigates, and closes it as a violation or a non-violation. Our Missouri guide covers the penalties and the PW-4-MODOT affidavit.

Example: a worker describes work in a trade with a higher required wage than your payroll shows, and the office marks "Correct trade based on work performed?" No. If you paid below that trade's required wage, step 3 applies.

EPG lists no separate steps for a mismatch with no effect on pay, such as a worker who does not recall the posters, and describes no dispute process for a CR-1 finding. If you disagree, give your records to the resident engineer. Neither EPG 110.3 nor the form, which is marked confidential, says whether you may see a completed CR-1, so ask.

How the older copies differ

The 04/2009 and 08/2015 copies asked the worker for pay per hour, base and fringe, whether the worker keeps a record of hours, how often overtime is worked, and whether the worker has seen the posters. They also carried sex and race boxes, EEO and harassment policy questions, and a training question. The 09/2026 form drops those and adds tools and equipment and compensation concerns.

How often MoDOT interviews, and whom

  • The minimum is one interview for each 10 days of work activity by the contractor or subcontractor, per EPG 110.3.1. EPG sets an average of one every two weeks when work is active and continuous, and a minimum of four per one-year term on a Job Order Contract.
  • Interviews increase during high activity. On small jobs MoDOT may interview every employee over time and need not interview anyone twice without a reason.
  • Operators who come with rented equipment go on a certified payroll and are subject to wage rate interviews, per EPG 110.3.
  • MoDOT logs each one in AWP, and EPG 110.1 has a monthly report of interviews required versus performed go to the resident engineer.

Before the inspector arrives

  1. Match each classification to the work, by day.
  2. Keep the wage order where workers can see it.
  3. Check overtime and deductions against the columns in our WH-347 guide.

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Does the CR-1 ask my worker what he or she is paid?
The 09/2026 form does not. The office takes the rate from your certified payroll. The 2009 and 2015 copies asked for pay per hour, base and fringe.
Can I refuse a MoDOT wage interview?
On a contract with the federal clause, 29 CFR 5.5(a)(3)(iv) requires you to permit interviews on the job, and refusal can lead to suspended payments and debarment. The Standard Specifications do not mention interviews, so read your contract and ask the resident engineer.
How many interviews will MoDOT do on my crew?
At least one for each 10 days of work activity by your firm, per EPG 110.3.1. Errors and busy periods raise the count.
Where does a completed CR-1 go?
EPG 110.3.1 has it saved in MoProjects, under the primary job number on combination projects. EPG 110.1 keeps wage interviews in the resident engineer's office for the length of the project and payrolls for three years after completion.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. CR-1 dated 09/2026 epg.modot.org
  2. Engineering Policy Guide (EPG) 110.3 epg.modot.org
  3. 29 CFR 5.5 ecfr.gov
  4. 08/2015 copy epg.modot.org
  5. 2026 Standard Specifications modot.org
  6. Standard Forms list epg.modot.org
  7. 04/2009 epg.modot.org
  8. EPG 110.1 epg.modot.org

Questions about your MoDOT project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us