Pennsylvania LLC-25: the payroll form L&I links for public works, not an LLC form
This page follows the form itself, the Pennsylvania Department of Labor & Industry's (L&I) Prevailing Wage FAQs, and 34 Pa. Code Subchapter E, the prevailing wage regulations.
Last reviewed against the sources it cites
The short answer
LLC-25 is the Pennsylvania Department of Labor and Industry's Weekly Payroll Certification for Public Works Projects, not an LLC form. The prevailing wage regulation requires contracts to provide for a weekly sworn payroll statement in a form satisfactory to the Secretary, and the Department links the LLC-25 as its Certified Payroll Form. PennDOT's 2026 specification calls for forms it furnishes, and a Philadelphia Code copy dated 2019 by its URL names the WH-347, so confirm with the public body.
- L&I's prevailing wage page links the LLC-25 as its Certified Payroll Form, and the form is printed as revision REV 10-03, an October 2003 revision.
- 34 Pa. Code 9.103(12) requires the contract to provide that each contractor and subcontractor files a weekly statement and a final statement with the contracting agency, under oath and in a form satisfactory to the Secretary, and it never names the LLC-25.
- PennDOT's Pub. 408/2026 Initial Edition (107.22(c)) says to use forms furnished by the Department, and the Philadelphia Code 17-107(4) posting this page read, uploaded in April 2019 according to its URL, names the WH-347, so confirm which form your contract wants.
- The form says the notarization must be completed on first and last submissions only, while 34 Pa. Code 9.110(a) describes each statement as filed under oath, so ask the public body which payrolls need a notary.
- L&I's FAQs say falsifying certified payrolls may be prosecuted as a misdemeanor, the form warns that willful falsification may bring civil or criminal prosecution under the Act, and 34 Pa. Code 9.110(c) sets up to $2,500, up to 5 years in prison, or both for a knowingly false sworn statement required under section 10 of the Act, but no source read says in terms whether the weekly LLC-25 is such a statement, so ask L&I or counsel.
- L&I's Prevailing Wage FAQs state a $25,000 threshold and $100,000 for locally funded highway and bridge projects contracted after January 1, 2014, but the Act's posted text shows only the $25,000 figure and no amendment after 1963, so on a locally funded highway or bridge job between those amounts, ask the public body or L&I before assuming either.
What the LLC-25 is
LLC-25 is the number of a form titled Weekly Payroll Certification for Public Works Projects, issued by L&I's Bureau of Labor Law Compliance. It has nothing to do with forming a limited liability company. L&I's prevailing wage page lists it as the "Certified Payroll Form." The printed revision is "REV 10-03," an October 2003 revision (the PDF's own creation date is October 14, 2003). The form has no instructions on where to submit it. Its header prints the Bureau of Labor Law Compliance's Harrisburg address (7th & Forster Streets) and 1-800-932-0665, but nothing there tells you to send the form to L&I, and the FAQs say payrolls go to the public body.
The regulations do not name the LLC-25. Section 9.103(12) says the contract shall provide that each contractor and subcontractor files a weekly statement and a final statement, under oath and "in form satisfactory to the Secretary," and 9.110(a) makes it the duty of the officer who disburses public funds to require those statements. The L&I FAQs do not name a payroll form either. So the LLC-25 is the form L&I links, and your contract or the public body may name another.
When it applies
The FAQs describe covered work as construction, reconstruction, demolition, alteration or repair work, other than maintenance, done under contract and paid for at least in part with public funds on a project estimated to cost over $25,000. They set the line at $100,000 for locally funded highway and bridge projects contracted after January 1, 2014. The text of the Prevailing Wage Act posted by the General Assembly, which shows amendments through 1963 and none later, defines public work at $25,000 in section 2(5) and does not show the $100,000 highway and bridge rule the FAQs state. The FAQs are L&I's own statement of what it enforces, and the posted Act text carries no amendment note after 1963, so it may lag behind them. On a locally funded highway or bridge job between $25,000 and $100,000, ask the public body or L&I before assuming either figure. L&I's prevailing wage page, in its Act 101 notice, says questions can go to laborlaw@pa.gov. The Bureau of Labor Law Compliance main line is 1-800-932-0665 (select the prevailing wage option).
The FAQs exclude projects where the U.S. Government requires federal prevailing wages and the cost exceeds $2,000. On federal-aid construction contracts, the contract text in Pub. 408/2026 (Initial Edition), Appendix C, says weekly payroll information may be submitted on Optional Form WH-347 or in another format. See our WH-347 guide.
Who receives it
The L&I FAQs say contractors and subcontractors "are required to submit certified payrolls to these public bodies" (FAQs). The regulation says to file with "the contracting agency" (9.103(12)) and does not define that term in its definitions section. Subcontractors should ask in writing whether their payroll goes to the prime contractor or to the public body. The Philadelphia Code posting this page read, uploaded in April 2019 according to its URL, routes subcontractor payroll through the prime contractor, but the City's current page may reflect later changes (see the table).
| Your job | Where the payroll goes | What the source says about the form |
|---|---|---|
| School district, township, county, authority or state agency contract other than PennDOT | The public body, per the FAQs | L&I links the LLC-25 as its Certified Payroll Form. The regulation asks for a statement "in form satisfactory to the Secretary." |
| PennDOT contract | PennDOT: the District Executive, and PPCC (PennDOT Project Collaboration Center) | Pub. 408/2026, 107.22(c): "Use forms furnished by the Department," submit within 7 days after the regular payment date, and furnish payrolls via PPCC. It does not name the LLC-25. The Initial Edition covers projects let after April 10, 2026, and Change No. 1 covers those let after October 9, 2026, with 107.22(c) the same in substance. Earlier lettings use earlier editions, which this page did not read. Federal-aid projects follow the federal rules and provisions set out in the proposal (107.22(g)). |
| City of Philadelphia contract | The Code posting this page read, uploaded in April 2019 according to its URL, says through the prime contractor, with a copy to the Labor Standards Unit. The City's current page names the Office of Labor Standards and says weekly payroll goes into LCP Tracker, so routing may have changed. | Code 17-107(4), in that posting, names the WH-347, weekly, within 7 days after the work week. It does not name the LLC-25. The current Code, which the City's page links, could not be read because its host refused the fetch. |
See also the Pennsylvania certified payroll guide and the state-by-state table.
How often, and when it needs a notary
Weekly, plus a final statement (9.103(12)). Neither that paragraph nor 9.110 gives a number of days for "each week," so read your contract's payroll clause or ask the public body.
L&I's own form says the notarization must be completed on first and last submissions only, and all other information must be completed weekly. The regulation says each weekly and final statement is made under oath, in a form satisfactory to the Secretary (9.110(a)). No source read says in terms whether an unnotarized weekly sheet meets the oath requirement, so ask the public body in writing which payrolls it wants notarized and which it treats as the last.
Fill it out, field by field
This follows the printed REV 10-03 form and says where it is silent. Notes come from the FAQs and the regulations.
Page 1: the payroll grid
| Printed on the form | What it asks | Note |
|---|---|---|
| Contractor or Subcontractor (check one); name and address; Payroll number; Week ending date | Check your role; complete the block, payroll number and week ending date. | The form gives no numbering rule. |
| Project and location; Project serial #; Project # | The project, its place and two numbers. | The form does not say where the numbers come from. L&I's LLC-68, which the public body returns within five days of award, also has a serial number line. Ask the public body. |
| Employee name; Work classification; Appr. rate (%) | One block per worker, five per page, with the apprentice's rate in percent. | Apprentices must be in a program registered with the Pennsylvania Apprenticeship and Training Council (9.103(9)). |
| Hours worked each day; S-TIME and 0-TIME | Hours for each day, with two sub-rows. | The form does not define S-TIME or 0-TIME. The FAQs, citing the Minimum Wage Act, set overtime at 1.5 times the regular rate over 40 hours a workweek; the regular rate counts cash paid in place of fringe benefits. |
| Base hourly rate; Total fringe benefits: C (cash), FB (contributions) | The base rate, then a C line and an FB line for each worker. | Contributions to a bona fide plan do not count in the regular rate. Page 2 asks for benefit types. |
| Total deductions; Gross pay for prevailing rate job(s); Check # | Deductions, gross pay and check number. | The FAQs list authorized deductions. Some need the worker's written authorization. |
Page 2: fringe explanation and certified statement
| Printed block | What it asks |
|---|---|
| Fringe Benefits Explanation (FB) | Bona fide contributions, not those required by law. Six lines take the per-hour amount for each benefit type, ending with an "other" line. |
| Certified Statement, item 1 | Name the party you contracted with (the blank reads "awarding agency, contractor or subcontractor"). You acknowledge that the wage requirements and rates are in the contract, that correcting infractions is your responsibility, and that you must include them in any subcontract. |
| Items 2 and 3 | You certify that neither you nor any firm you have an interest in is debarred under section 11(e) of the Act, and that no part of the contract has been or will be subcontracted to a subcontractor who is debarred or who has an interest in a debarred firm. L&I posts a debarment list. Then your legal name, address, entity type and owners, partners or officers. |
| Signature block | Date, signature, title and seal lines, then the notary's "taken, sworn and subscribed" lines. |
The printed form text has no sentence certifying that workers were paid wages in strict conformity with the contract. Sections 9.103(12) and 9.110(a) and (b) call for three things the form text lacks: that certification, the wages due and owing to each worker if any remain unpaid, and a certification that no refund of the minimum wage is received or required. Before you sign, ask the public body how it wants those made.
What happens when it is missing, late or false
Missing. Section 9.110(a) makes the officer who disburses public funds responsible for requiring each weekly and final statement. The sections listed under Late name no fine for a missing statement either. On a PennDOT contract, Pub. 408/2026 107.22(c) withholds payment of estimates and the final settlement certificate if the certification is not submitted (see Late). Separately, before final payment, section 10(a) of the Act requires statements, verified by oath, of the amounts then due and owing to workmen. Neither the Act nor the regulation says in terms whether that statement and the weekly LLC-25 are one filing. See False below.
Late. The Act's sections 10 to 12 and 34 Pa. Code 9.110 and 9.111 set no fine for a late statement. Contract and local terms differ. Under Pub. 408/2026, PennDOT withholds payment of estimates and the final settlement certificate if the certification is not submitted on the proper form "within the prescribed time limit" (107.22(c)). The Philadelphia Code posting this page read, uploaded in April 2019 according to its URL and possibly amended since, imposes $300 for each violation on a contractor who submits a second or subsequent late or incomplete payroll, and counts each late payroll as a separate violation (17-107(9)(c)(.1) and (9)(d)). Check the current Code before relying on that amount.
False. The form's second page warns that willful falsification of any of its statements may subject the contractor to civil or criminal prosecution under the Prevailing Wage Act. The FAQs say falsifying certified payrolls may be prosecuted as a criminal misdemeanor, and that criminal penalties may follow when a contractor commits fraud or misrepresents information on documents and records the Act requires. None of these gives a fine or prison term for the LLC-25 itself.
The penalty text, in section 10(c) of the Act and in 9.110(c), covers a contractor who, under oath, verifies a statement required to be filed under section 10 of the Act that he knows to be false. The penalty is a misdemeanor with a fine of up to $2,500, up to 5 years in prison, or both. Neither the Act nor the regulation says in terms whether the weekly LLC-25 is a statement required to be filed under section 10. Section 9.110(c) sits in the same regulation section that requires the weekly statement (9.110(a)), and it cites section 10 of the Act. The Act's posted text never mentions weekly statements. So this page cannot tell you whether a false LLC-25 carries the $2,500 and 5 year penalty. Ask L&I or counsel before you sign.
The FAQs also give a non-exhaustive list of intentional violations that includes "False certification of payment of prevailing wages," failure to give L&I investigators requested payroll information, and failure to keep required records. Their penalty list is 3 years of debarment, wages owed, possible referral for liquidated damages, possible termination from the project, and the criminal penalties noted above. The Act ties debarment, liquidated damages and termination to an intentional failure to pay prevailing wages (sections 11(e), 11(f) and 12) and those sections do not mention records or information requests.
Records. On a project covered by the Pennsylvania act, keep time cards and payroll records 2 years from the date of payment, accessible in Pennsylvania within 7 days of the Secretary's written request (34 Pa. Code 9.109). The same regulations say they do not apply to public works contracts subject to the Walsh-Healey Act or section 1 of the Davis-Bacon Act (9.101(c)). On federal-aid PennDOT contracts, Pub. 408/2026 Appendix C (DSP8, paragraph 3.a(1)) requires payrolls and basic records to be preserved for at least 3 years after all the work on the prime contract is completed. Those are two different periods from two sources, and these sources do not settle which one governs a given federal-aid job. Keep the records for the longer period and ask the public body.
Act 101 of 2026 takes effect December 21, 2026
L&I's prevailing wage page says the Governor signed Act 101 of 2026 on October 22, 2026, effective December 21, 2026, and that L&I is assessing enforcement and compliance requirements. The General Assembly's page for Act 101 gives the title "Pennsylvania Prevailing Wage Act - Specifications and Duty of Secretary" and says it was enacted from SB 908. It said the text was not available on November 4, 2026, so how Act 101 affects certified payroll or the LLC-25 is unknown. Check L&I's page for updates.
Help with your project
We prepare certified payroll for public works contractors. Tell us about your project.
Questions
Is the LLC-25 a form for forming an LLC?
Does the LLC-25 need a notary every week?
Do I send the LLC-25 to L&I or to the public body?
Can I use a WH-347 or a payroll software report instead?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- the form itself pa.gov
- Prevailing Wage FAQs pa.gov
- 34 Pa. Code Subchapter E pacodeandbulletin.gov
- The prevailing wage regulation pacodeandbulletin.gov
- links the LLC-25 pa.gov
- PennDOT's 2026 specification pa.gov
- Philadelphia Code copy phila.gov
- 34 Pa. Code 9.110(a) pacodeandbulletin.gov
- the Act's posted text legis.state.pa.us
- WH-347 dol.gov
- definitions section pacodeandbulletin.gov
- Change No. 1 pa.gov
- The City's current page phila.gov
- LLC-68 pa.gov
- debarment list pa.gov
- 9.111 pacodeandbulletin.gov
- 34 Pa. Code 9.109 pacodeandbulletin.gov
- 9.101(c) pacodeandbulletin.gov
- Act 101 palegis.us