TxDOT Form 2220, the Labor Standards Review: what it checks and what to do after an interview

This page follows the district monitoring section of TxDOT's Construction Contract Administration Manual, the 03/2025 Labor Standards Review job aid, and 29 CFR 5.5. Both TxDOT documents are written for TxDOT staff, so this page reads them from the contractor's side.

Last reviewed against the sources it cites

The short answer

Form 2220 is TxDOT's Labor Standards Review, the form an inspector uses to interview one of your workers in the field. The area office recordkeeper then checks the worker's classification code and base hourly rate against your LCPtracker payroll and the contract's Wage Rate Decision table. A mismatch comes back as a request to clarify the classification or the additional wages owed. If it is not corrected, TxDOT's manual sends it to the district office.

  • TxDOT's Construction Contract Administration Manual tells staff to conduct at least three employee labor interviews per project per quarter on federally funded projects, using Form 2220 and picking employees at random.
  • The 03/2025 recordkeeper job aid has the recordkeeper confirm that the classification code matches and that the base hourly rate is at least the minimum for that code in the proposal's Wage Rate Decision table, by the county's zone.
  • The same job aid's sample note records a request to the prime for clarification of job classification or additional wages owed for the rate paid.
  • The manual's Labor Interviews text sends an uncorrected mismatch to the district office, and its Payroll Review text says that if the contractor still does not address identified issues, TxDOT asks its Financial Management Division to withhold the monthly estimates.
  • OJT trainees carry 9XXX classifications, and TxDOT's 06/2025 OJT job aid says a Labor Standards Review should be conducted at least once for each trainee.
  • TxDOT's 8/2025 LCPtracker payroll job aid says that, for payrolls the recordkeeper reviews before acceptance, corrections are made by the contractor that submitted the payroll.

What Form 2220 is

Form 2220 is the Labor Standards Review on TxDOT's construction forms page, which the recordkeeper job aid also calls the Labor Interview. An inspector uses it in the field to interview one of your workers, and a recordkeeper at the area office then checks the answers against your payroll. The job aid has the inspector and the recordkeeper complete it and gives the contractor no part. The form itself is served as an interactive page that did not load as readable text, so this page does not list its fields.

The manual's interview rule is written for federally funded projects. It says to conduct at least three employee labor interviews for each project per quarter, to check whether the contractor and subcontractors comply with labor laws, and to pick employees at random. The quarter follows the calendar year from January 1. The manual page shows no revision date; it was read in November 2026. Read against the manual's stated purpose of checking the contractor and subcontractors, that means a subcontractor's worker can be interviewed. Your contract documents will show whether the job is federally funded. Our Texas certified payroll page covers the LCPtracker timing (7 calendar days after the payroll period ends, on projects let from August 2017) and the other Texas channels.

What happens after the interview

The job aid sets out these steps.

  1. The inspector interviews in the field. The inspector speaks with the contractor's employees directly and signs page 2 of Form 2220. If an OJT trainee is on site, the OJT section is completed.
  2. The recordkeeper pulls your payroll. In LCPtracker, the recordkeeper selects the area office, the project's CSJ number, the contractor named on the form, and an accept status of accepted or not accepted. The recordkeeper then opens the payroll for the week of the date on Form 2220 and finds the interviewed employee.
  3. The recordkeeper checks two things. The classification code must match between the payroll and Form 2220. The base hourly rate must be at least the minimum rate for that code in the Wage Rate Decision table in the proposal, using the zone for the project's county.
  4. A mismatch goes back to the contractor. The job aid says to request clarification and note it on the form. Its sample note says the inspector showed the employee where the minimum wage rates are, and that clarification was requested from the prime about job classification or additional wages owed for the rate paid.
  5. The result is recorded. The recordkeeper combines Form 2220 and the payroll in the project's Labor Compliance folder in ProjectWise and enters the interview date as a Labor Interview event in SiteManager.

If you get a clarification request

  1. Find out which worker and which week it covers, then compare that payroll line with the worker's time records and the Wage Rate Decision row for the project's county zone.
  2. Work out whether it is a classification question or a wages question.
  3. If the payroll classification was wrong, correct it. The LCPtracker payroll job aid (8/2025) says that, for payrolls the recordkeeper reviews before acceptance, corrections must be made by the contractor that submitted the payroll, and that the recordkeeper can accept, reject or permit edits. It does not address correcting a payroll after an interview, so if the payroll was already accepted, ask the recordkeeper how to correct it.
  4. If wages are owed, pay the difference. TxDOT's documents do not say how it wants back wages shown on a corrected payroll, so ask the recordkeeper before you resubmit.
  5. Answer in writing. On a subcontract the sample note names the prime, and the Davis-Bacon contract clauses that 29 CFR 5.5(a)(6) prescribes make the prime responsible for subcontractors' compliance, so expect the prime to ask you for the answer.

The duties in this section and in the worker section below come from the Davis-Bacon contract clauses that 29 CFR 5.5(a) prescribes. Your contract's own clause text is what binds you. Form FHWA-1273 says contracting agencies using Federal-aid highway funds were historically required to ensure it was physically incorporated into all contracts and subcontracts, and that effective June 10, 2026 this requirement was eliminated, so its use is now optional on the part of the contracting agency. Check whether your contract includes it. See our FHWA-1273 page.

If it is not corrected

The manual's Labor Interviews text has TxDOT notify the contractor to correct the problem when payrolls do not match interview information, and notify the district office if the contractor does not.

Withholding is in the Payroll Review text on the same page. TxDOT brings discrepancies and questionable wage rates to the contractor for explanation or correction, and brings failures to correct to the district office. If the contractor still does not address the identified issues, TxDOT requests that its Financial Management Division withhold the monthly estimates. When the problem is corrected, TxDOT tells that division to resume them. The manual does not say in so many words that an interview mismatch triggers this step, so ask the area office which track yours is on.

Separately, 29 CFR 5.5(a)(2)(i) lets the agency withhold accrued payments to cover unpaid wages. See our withholding page.

How to avoid a mismatch

Classification and rate: pay and record the work actually done

The federal clause requires pay at the wage determination rate for the classification of work actually performed. You may pay a worker the rate for each classification for the time worked in each only if your payroll records accurately set out that time (29 CFR 5.5(a)(1)(i)). The manual likewise requires the rate for each classification for the time actually worked in each, and LCPtracker's Quick Start guide has a separate pay record for each classification a worker works.

LCPtracker validation helps only if the right classification is chosen, and what it flags depends on how the Administrator set up the project, according to its guide. A payroll can clear LCPtracker and still not match what a worker tells an inspector. For the rate, check each week's pay against the Wage Rate Decision row for the project's county zone. The job aid's test is whether the base hourly rate is at least the minimum.

Codes: attach a key if you use your own

The manual lets you use your own codes or abbreviations if you attach a list of the codes with their titles to each payroll (manual). It recommends a standard classification booklet for Texas highway and heavy construction.

OJT trainees

If you have trainees, they carry 9XXX classification codes. TxDOT's OJT job aid (06/2025) says a Labor Standards Review should be conducted at least once for each trainee during the training period. It also says hours worked as a laborer or in another classification do not count toward OJT hours.

A classification the table does not list

If the contract wage schedule lacks a classification you need, the manual says to send Form CST-C-1, Additional Classification and Wage Rate Request, to the Construction Division for approval. Our SF-1444 page covers the federal process, under which the approved rate is owed from the first day worked in the classification (29 CFR 5.5(a)(1)(iii)(E)).

What to tell foremen and workers

  • Keep the wage rates posted. The manual requires the contract's prevailing wage rates to be posted at the project site where employees can see them (29 CFR 5.5(a)(1)(i) also requires posting), and the job aid's sample note has the inspector pointing an employee to them.
  • Tell each worker their classification and base rate, so they can describe their own job and pay accurately.
  • Let the interview happen. The federal clause requires you to permit interviews of workers during working hours on the job (29 CFR 5.5(a)(3)(iv)(A)). Our HUD-11 page covers that duty and the sanctions for refusing.
  • Do not penalize what a worker says. The anti-retaliation clause at 29 CFR 5.5(a)(11) bars retaliation against a worker for cooperating in any investigation or other compliance action. Our advice, not the clause's: let workers answer in their own words rather than scripting them.
  • Ask foremen to tell the office the date of any interview, so you can check that week's payroll first.

What we do

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Do I complete or send Form 2220?
The job aid describes nothing for the contractor to complete: the inspector signs page 2 and the recordkeeper completes the Payroll Review section. Your part comes if a mismatch needs clarifying.
How often will TxDOT interview my workers?
The manual sets a minimum of three per project per quarter on federally funded projects, with employees picked at random. The OJT job aid adds at least one review for each trainee.
Is Form 2220 the same as the HUD-11?
No. Form 2220 is TxDOT's form and the HUD-11 is HUD's. See our HUD-11 page.
Does an interview mean the Department of Labor is investigating me?
Form 2220 is TxDOT's own form, used in its district monitoring. The federal clause lets representatives of the agency or the Department of Labor interview workers (29 CFR 5.5(a)(3)(iv)(A)), so an interview alone does not tell you which. If the Department of Labor is involved, see our Wage and Hour investigation page.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. district monitoring section of TxDOT's Construction Contract Administration Manual txdot.gov
  2. 03/2025 Labor Standards Review job aid txdot.gov
  3. 29 CFR 5.5 ecfr.gov
  4. 06/2025 OJT job aid txdot.gov
  5. 8/2025 LCPtracker payroll job aid txdot.gov
  6. Labor Standards Review txdot.gov
  7. 7 calendar days txdot.gov
  8. Form FHWA-1273 fhwa.dot.gov
  9. Quick Start guide kb.lcptracker.com

Questions about your TxDOT project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us