4/10 schedule on California prevailing wage: you still owe daily overtime

Four 10-hour days do not remove overtime on a California public works job. This page follows the Labor Commissioner's Public Works Manual (October 2023) and an DIR prevailing wage determination.

Last reviewed against the sources it cites

The short answer

Generally no. The Labor Commissioner's Public Works Manual says daily overtime applies to workers on a California public works project, including workers under a collective bargaining agreement or an alternative workweek schedule. The regulation lists limited exceptions, so ask the awarding body for its written determination. Four 10-hour days otherwise carry two overtime hours each day.

  • The Labor Commissioner's Public Works Manual (October 2023), section 4.1.8, says the public works hour limits apply notwithstanding Labor Code 511, 514 and Wage Order 16.
  • The same section 4.1.8 of the manual says no worker may be employed on a public works project for more than eight hours a day unless paid the overtime the determination specifies, including workers covered by an alternative workweek schedule.
  • Section 3.2.7.1 of the manual requires that overtime hours on a split day be paid at the overtime rate for the type of work done during those hours, with all hours counted.
  • Section 3.2.7.2 of the manual sets the regular rate for public overtime on a public and private split day at the higher of the weighted average or the prevailing wage rate.
  • 8 CCR 16200(a)(3)(F) says no overtime is owed for the first eight hours on Saturday or Sunday where a non-Monday-to-Friday workweek is a fixed business practice or required by the awarding body, or where the collective bargaining agreement provides straight-time weekend work.

Can you run a 4/10 schedule without paying overtime?

No. The Labor Commissioner's Public Works Manual, section 4.1.8, is titled "Restriction on Alternative Workweek Schedules." It says Labor Code sections 1810, 1811 and 1815 require overtime for hours over eight in a day on public works, and that Article XIV, section 2 of the California Constitution also limits public works hours to eight a day except in specified circumstances. For split weeks, see a worker on public and private jobs in the same week.

The manual then closes the usual exit. "Notwithstanding Labor Code sections 511, 514 and Wage Order 16," these limits apply to all workers on public works projects. That includes workers covered by a collective bargaining agreement and workers covered by an alternative workweek schedule adopted under Labor Code 511 or Wage Order 16. Its conclusion: no worker may be employed on a public works project more than eight hours a day unless the worker receives the overtime compensation the applicable prevailing wage determination specifies. To run the numbers, use the prevailing wage overtime calculator.

So a schedule that is legal on a private job, with 10-hour days at straight time, does not carry over. Under the manual, each 10-hour day has two overtime hours. The rate for those hours is on the determination, not in the schedule you adopted.

The regulation is a little broader than the manual. 8 CCR 16200(a)(3)(F) lists limited exceptions: an awarding body determination that work cannot be performed during normal business hours or is needed at off hours to avoid danger to life or property, and the Saturday and Sunday rules covered below. Manual section 4.1.8 does not recognize alternative workweeks, so ask the awarding body for its written determination before you schedule 10-hour days at straight time.

The manual is the Labor Commissioner's enforcement guide, dated October 2023. Check the Labor Commissioner's site for a newer edition.

What a 4/10 week costs on a real determination

The determination for your craft and county sets the numbers. Take the Carpenter journeyperson, Area 1, building and highway rows at 8 hours, on the interim determination issued October 30, 2026 (NC-23-31-1-2026-2), which applies to projects advertised for bids on or after November 9, 2026 and supersedes NC-23-31-1-2026-1 for those projects. Projects advertised earlier use the prior determination. It lists a total hourly rate of $109.41 for the first 8 hours and a daily overtime rate of $146.64 at time and one half. Footnote e applies the 1 1/2X rate to the first 4 hours of daily overtime for building construction, and footnote g also governs the Saturday 1 1/2X column. For heavy, highway and engineering construction it applies to the first 4 hours of overtime worked Monday through Friday. The determination shows a separate 2X daily column beyond that.

This is one craft in one county. Your rates will differ, so use your own determination. Here is the arithmetic for a four-day, 40-hour week on those figures.

MethodHoursPay for the week
Straight time for all 40 hours (not allowed)40 at $109.41$4,376.40
Daily overtime after 8 hours, four 10-hour days32 at $109.41 plus 8 at $146.64$4,674.24
Difference per worker per week$297.84

Run that across a crew and a season and the shortfall is the wage underpayment an investigator would compute. The manual also states a separate penalty under Labor Code 1813 of $25 for each worker for each calendar day the worker worked more than eight hours in a day or 40 in a week, with no discretion for the Labor Commissioner to reduce it (section 4.4). Our Labor Code 1813 guide covers that penalty on its own.

What the determination can change

The determination, not the schedule, decides the rate. Two things in it matter for a 4/10 crew.

Overtime tiers differ by craft

The columns and footnotes on the determination show when time and one half becomes double time. Do not assume every craft uses the same tiers. Our guide to reading a determination walks through the columns, and the overtime, shift and holiday guide covers the statutory floor and premium rates.

Saturday and Sunday exceptions

8 CCR 16200(a)(3)(F) has two weekend exceptions. Exception 1: if a workweek other than Monday through Friday is a fixed business practice or is required by the awarding body, no overtime is required for the first eight hours on Saturday or Sunday. Exception 2: if the collective bargaining agreement provides for Saturday and Sunday work at straight time, the same applies. Exception 4 says no overtime is required for under 40 hours in a standard week or under eight hours in a workday unless the collective bargaining agreement behind the determination specifies it.

The manual treats make-up days separately.

Section 4.1.9 says some determinations let contractors pay straight time for Saturday work if conditions are met. It adds that the exception is read narrowly, must be written into the determination, and that the Labor Commissioner will not recognize exceptions that exist only in an underlying collective bargaining agreement. On the carpenter determination above, footnote f lets employees voluntarily make up a lost Monday to Friday day on Saturday at straight time when inclement weather or a major mechanical breakdown prevented work. A planned 4/10 schedule is not that situation.

A worker splits the day between classifications

Manual section 3.2.7.1 covers a worker who does work in two or more classifications with different rates in the same workday. It also covers a worker on two or more public works projects in one day. All hours count toward overtime, and the worker must be paid the overtime rate in effect for the type of work being done during the overtime hours.

The manual's example: four hours as an Inside Wireman and then six hours as a Painter. The worker is owed four hours at the Inside Wireman straight rate, four hours at the Painter straight rate, and two hours at the Painter overtime rate, because the two hours over eight were Painter work. The employer must keep records showing the right rate was paid for every hour in each classification. Our classification guide covers how to decide which craft applies to each task.

A worker splits the day between public and private work

Manual section 3.2.7.2 covers a day with one public works rate and one private rate. The regular rate for calculating overtime on the public work is the higher of the weighted average or the prevailing wage rate in effect when the work is done.

Order of workWhat the manual says is owed
4 hours private at $15, then 8 hours public at $30$15 for the 4 private hours, $30 for the first 4 public hours, then the determination's overtime rate (the manual's example uses $45) for the last 4 public hours.
4 hours public at $30, then 8 hours private at $15, one 12-hour day$30 for the first 4 public hours, $15 for the first 4 private hours, then the weighted average overtime for the last 4 private hours. The weighted average regular rate is $20, so the overtime rate is $30.

The weighted average in the manual's second example is $120 plus $120, divided by 12 hours, which is $20 an hour. The manual points investigators to the Labor Commissioner's 2002 Enforcement Policies and Interpretations Manual for the full weighted average method. The key point for payroll is that private hours count toward the eight-hour day, so a worker who finishes a private job and then reports to your public job may reach overtime quickly.

What goes on the certified payroll

  1. Record hours by day. Daily overtime cannot be computed from weekly totals, so keep daily hours for every worker. For split days, manual section 3.2.7.1 requires records showing the worker was paid the right rate for all hours in each classification.
  2. Pay overtime from the determination. Use the overtime columns for the craft, county and shift in the determination that governs your project.
  3. Split by classification. If a worker moves between crafts, show each classification's hours and rate. See the WH-347 guide for how the form lays this out.
  4. Count outside hours. Include hours on other public works and private jobs that day when you decide where overtime starts.
  5. Check fringe credit. Manual section 4.2 lets a contractor credit employer payments against the rate, so see the fringe credit guide before you claim a credit for plan payments.

WellStanding prepares the WH-347 and the eCPR from the payroll export you already run, and a person reviews every filing. You review the finished filing and sign the certification in one step, and nothing is filed until you have signed; we never sign for you.

Questions

Does a collective bargaining agreement allow 4/10 schedules on public works?
Generally not at straight time. Manual section 4.1.8 says the daily overtime restriction applies to workers covered by collective bargaining agreements as well, and section 4.1.9 says the Labor Commissioner will not recognize a make-up day exception that exists only in the agreement. The regulation, 8 CCR 16200(a)(3)(F), does defer to the agreement in two places: Exception 2 for straight-time Saturday and Sunday work, and Exception 4 for work under eight hours a day or 40 a week. It also lists an awarding-body off-hours exception. Ask the awarding body for its written determination.
Is Labor Code 511 relevant on a public works job?
It does not remove the public works limit. Manual section 4.1.8 says the eight-hour restriction applies notwithstanding Labor Code 511, 514 and Wage Order 16.
Do Wage Order 16 rules still apply on public works?
Applicable provisions do. Manual section 4.12 says contractors must comply with "any applicable provisions of Wage Order 16, or other applicable wage order," in addition to prevailing wage obligations, which include, among other things, record keeping, meal and rest periods, uniform and equipment, and reporting time. The applicable order may be a different wage order.
Which hours count toward overtime when a worker has two jobs in one day?
All of them. Manual section 3.2.7.1 says all hours must be counted for overtime on a split day, including work on two or more public works projects, and section 3.2.7.2 applies the same idea to a public and private split.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. Public Works Manual dir.ca.gov
  2. DIR prevailing wage determination dir.ca.gov
  3. 8 CCR 16200(a)(3)(F) dir.ca.gov

Crew on 10-hour days? First filing free

Send the payroll export you already run. We turn it into the WH-347 and the DIR eCPR filing, checked by software and verified by a person. First filing free, before you pay us anything. $995 one time setup, then $249 per month flat for crews up to 25 workers.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallFirst filing free