Which craft classification applies on a California prevailing wage job?

The rules below come from the Labor Commissioner's Public Works Manual (October 2023 edition) and the Director's general prevailing wage determinations pages at DIR.

Last reviewed against the sources it cites

The short answer

The classification that applies is set by the work the employee actually performed, matched to a craft on DIR's prevailing wage determination. DIR publishes an advisory scope of work for many crafts to help you match them. On which craft covers the work performed, the Director makes the final determination (Manual 4.1.2). If a CWPA is contested, a trier-of-fact weighs the evidence on what the worker did, so keep daily records of the tasks performed.

  • The Labor Commissioner's Public Works Manual (October 2023) says the wage rate is based on the worker's classification and on the work actually performed.
  • DIR publishes a scope of work for crafts on its 2026-2 determinations menu, and the menu itself calls it "advisory".
  • The Public Works Manual says the Labor Commissioner does not enforce collective bargaining agreement provisions, and that union membership or signatory status is irrelevant to classification.
  • The Manual says workers may be reclassified when their duties or work tasks do not accurately reflect the work being performed.
  • A contractor served with a CWPA has 60 days after service to request a review hearing (Public Works Manual, section 4.8).
  • The Ironworker scope of work on the 2026-2 menu says solar and photovoltaic installation in Imperial, Los Angeles and San Diego Counties carries the Electrician: Inside Wireman minimum rate.

The short rule: the work performed sets the classification

You do not pick a classification from a job title, a license or a union card. The Public Works Manual, section 4.1.2, says the applicable wage rate is determined by the worker's classification and is based on the work actually performed. The Manual also says the classification of work under a Director-issued wage determination is often a primary area of dispute between the Labor Commissioner and contractors in enforcement proceedings. For supervisors specifically, see prevailing wage for a foreman, superintendent or project manager.

That makes this a records problem as much as a wage problem. If you are splitting one worker's day across two trades, our guide to worker classification on certified payroll covers the hours, the overtime and the form entries. This page covers the step before that: deciding which crafts the work belongs to, and what happens when someone disagrees. See also maintenance and repair work under prevailing wage. For end-of-job work, see construction cleanup prevailing wage.

What a scope of work provision is

A scope of work provision is a document DIR's Office of the Director, Research (OD Research) posts with a craft's wage determination. DIR's determinations menu describes these as "advisory scope of work" provisions, found with the holiday and travel and subsistence provisions for each craft. For inspection and testing roles, see special inspector and construction inspector prevailing wage.

The Manual explains how the Labor Commissioner uses them. Some wage determinations name the work they cover, such as an Operating Engineer group tied to a type of equipment. Others do not. When the determination is silent, the Director has typically relied on the posted scope of work provisions, and the Manual tells investigators to review them whenever a classification issue arises. For furniture installation, see modular furniture installer prevailing wage.

Advisory does not mean the CBA governs

OD Research posts collective bargaining agreement (CBA) provisions with the wage determination, but the Manual calls it irrelevant whether the worker belongs to the union whose agreement is posted, or whether the contractor signed that agreement. The Labor Commissioner does not enforce collective bargaining agreement provisions in the prevailing wage context. It enforces the rates in the Director's wage determinations, and the scope of work may guide how those determinations are read. For traffic control crews, see flagger and traffic control prevailing wage.

How to find the scope of work for your craft

  1. Start at the current menu. From DIR's determinations page, open the journeyman menu. As of November 2026 that is the 2026-2 menu.
  2. Follow DIR's six steps. The menu says to check statewide crafts first, then the Northern or Southern California basic trades, then San Diego for projects there, then county subtrades. Step five covers shift pay. Step six is the important notices.
  3. Use the dropdown beside the craft. On the statewide page, each craft has a menu with Holidays, Scope and Travel choices. Choose Scope.
  4. Read the important notices. The scope document can point to a notice that changes how it applies. Check the notices index for corrections and interims.

An example where the craft can surprise you

The Ironworker scope of work provisions on the 2026-2 menu open with a notice about solar. For installation of solar and photovoltaic systems in Imperial, Los Angeles and San Diego Counties, the document says the minimum rate of pay is that of Electrician: Inside Wireman. So in those counties, solar work is not automatically Ironworker work, even under an Ironworker scope. The same document says its advisory scope for metal roofing systems does not apply in counties where DIR has issued rates for the Metal Roofing Systems Installer. For shop and fabrication work, see off-site fabrication prevailing wage.

Scope documents are long and specific, and they change with each issue. Read the one for the determination that governs your project, not one you saved from an earlier job. Our guide to reading a prevailing wage determination covers which determination that is.

If your craft is not on the menu

DIR's menu says that if you cannot find a classification needed to execute a contract in the general determinations, you should contact OD Research. It warns that the request may need a wage survey, and says to allow 45 days before the bid advertisement date, with the project name or bid number, the classifications needed, a job description, the bid advertisement date and the project location. Our guide to rate petitions and special determinations covers that route. For questions, use DIR's OD Research contact page.

Two kinds of classification dispute

The Manual separates disputes into two types, and they are won with different proof.

TypeThe questionWhat decides it
Factual disputeWhat did the worker actually do? The worker says one thing and you say another.Evidence of duties and equipment used
Classification disputeThe duties are agreed. Which craft covers that kind of work?The determination, and the scope of work where the determination is not specific

For the second type, the Manual says the Director makes the final determination on the correct classification and cites DLSE v. Ericsson Information Services, Inc. (1990) 221 Cal.App.3d 114.

The evidence an investigator looks for

Section 4.1.3 of the Manual lists the evidence available in a factual dispute. The list is not exhaustive.

  • Worker complaints, statements or questionnaires that identify duties and equipment used.
  • The public works contract and subcontracts, including specifications.
  • Inspection reports or logs kept by awarding bodies, contractors or other observers.
  • Time and pay records, including calendars kept by workers or contractors, which may describe duties.

The Manual's next section, 4.1.4, also says that, absent compelling evidence of the type of work performed, uncertainties will likely be resolved in favor of worker testimony and against the contractor whose failure to keep required records created them. It cites Hernandez v. Mendoza (1988) 199 Cal.App.3d 721. A record that describes tasks, not only a classification name, is what answers a claim like that.

When an investigator reclassifies a worker

Section 4.1.2 says workers may be reclassified when the duties or work tasks do not accurately reflect the work being performed. The Manual also warns that where one worker does tasks from two classifications, the higher rate can apply to all hours in some cases. Section 4.1.4 adopts the federal In re Corley (1978) analysis for that only where both types of work are part of the work assigned to that worker in accomplishing the overall task performed under the higher-paying classification. Our classification guide covers that rule. The Manual says it does not apply to every payroll that shows one worker in two classifications on a day.

How to contest it

Section 4.8 of the Manual describes the process. A contractor served with a Civil Wage and Penalty Assessment (CWPA) can request a review hearing. If no hearing is requested within 60 days after service, the CWPA becomes final. If you do request one, DIR holds a hearing and issues a written decision affirming, modifying or dismissing the assessment. You can then seek court review of the decision by filing a writ under Code of Civil Procedure section 1094.5.

On a separate question, coverage rather than classification, the Manual's opening discussion of coverage determinations says that where a CWPA is issued before any coverage determination for the same project has been requested, a claim that the project or the type of work performed was not subject to the prevailing wage laws may be raised in the review proceedings. Read our guides to the CWPA and the hearing and writ. Talk to an attorney about representation.

A checklist before the first payroll

  1. Open the determination and the scope of work for your craft and county, using the project's governing issue.
  2. List the tasks your crew will perform and match each to a classification title.
  3. Check the important notices for changes to that craft.
  4. If a task does not fit cleanly, contact OD Research before the work, not after an assessment.
  5. Keep daily logs that describe the tasks and equipment. This is a practice tip: the Manual (sections 4.1.3 and 4.1.4) lists time and pay records as evidence and says uncertainties are likely resolved against the contractor whose missing records created them.
  6. Use the Director's exact classification title on every payroll line, as our worker classification guide explains.

WellStanding prepares the WH-347 and the eCPR from the payroll export you already run, and a person reviews every filing. You review the finished filing and sign the certification in one step, and nothing is filed until you have signed; we never sign for you.

Questions

Does the scope of work decide my classification?
It guides it. DIR's menu calls these provisions advisory, and the Public Works Manual says the Director has typically relied on them where a determination is not specific. On which craft covers the work performed, once the duties are not in dispute, the Director makes the final determination (Manual 4.1.2).
Does it matter whether my worker is in a union?
No. The Manual says it is irrelevant whether the worker is a union member or the contractor signed the agreement posted with the determination. The rate follows the classification, based on the work actually performed.
Who has the final word if the Labor Commissioner and I disagree?
It depends on the question. On which craft covers the work performed, the Manual says in section 4.1.2 that the Director makes the final determination, citing DLSE v. Ericsson Information Services, Inc. On a factual dispute about what the worker did, the Manual (4.1.3) refers to a trier-of-fact if a CWPA is contested, and section 4.8 describes the Labor Code section 1742 review hearing and written decision, which can go to court by writ.
How long do I have to contest a reclassification in an assessment?
The Manual, section 4.8, says the CWPA becomes final if no hearing is requested within 60 days after service. Check the date of service on your assessment.
What if my craft is not on the determinations menu?
DIR's menu says to contact OD Research and to allow 45 days before the bid advertisement date, because a wage survey may be needed.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. Public Works Manual dir.ca.gov
  2. Director's general prevailing wage determinations pages dir.ca.gov
  3. 2026-2 determinations menu dir.ca.gov
  4. Ironworker scope of work dir.ca.gov
  5. statewide page dir.ca.gov
  6. notices index dir.ca.gov
  7. OD Research contact page dir.ca.gov

Reclassified in an assessment? First filing free

Send the payroll export you already run. We turn it into the WH-347 and the DIR eCPR filing, checked by software and verified by a person. First filing free, before you pay us anything. $995 one time setup, then $249 per month flat for crews up to 25 workers.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallFirst filing free