Truck drivers and the site of the work on a Davis-Bacon job
This page covers which truck driver hours belong on a federal certified payroll. Its sources are 29 CFR 5.2, 29 CFR 5.5, the June 24, 2026 final judgment that vacated part of the 2023 rule, and the 2023 final rule.
Last reviewed against the sources it cites
The short answer
For a driver employed by a contractor or subcontractor, driving inside the site of the work is covered and goes on the certified payroll at the classification rate. Other hauling is not covered, except trips between primary, secondary and support sites and, on development-statute work, transportation by the project's workers. A court vacated on June 24, 2026 the 2023 paragraph covering a driver's non-de minimis on-site loading and waiting, so that time is now unsettled; the eCFR still prints it.
- Transportation that takes place entirely within the site of the work is covered construction under paragraph (2)(iv)(A) of the definition in 29 CFR 5.2.
- Apart from covered transportation, the same definition says construction does not include transporting materials or supplies to or from the site of the work (29 CFR 5.2, paragraph (3)).
- On June 24, 2026 a federal court in Texas entered a final judgment vacating paragraph (2)(iv)(D), which had covered a truck driver's on-site activities tied to offsite transportation when that time was not de minimis.
- The eCFR text of 29 CFR 5.2, up to date as of November 3, 2026, still prints the vacated paragraph (D) with no editorial note about the judgment.
- Footnote 180 of DOL's 2023 preamble records a policy of not applying Davis-Bacon wage requirements to bona fide truck owner-operators and also quotes a 2003 Administrative Review Board decision that DOL considers even bona fide owner-operators on covered work due the prevailing rate (88 FR 57526).
- A certified payroll must show each worker's classification of work actually performed and daily and weekly hours worked in total and on each covered contract (29 CFR 5.5(a)(3)(ii)(B), which incorporates (a)(3)(i)(B)).
Which hauling hours are covered
For a driver employed by a contractor or subcontractor on the contract, driving inside the site of the work is covered (paragraph (A) of 29 CFR 5.2). Hauling to or from the site is not, with three exceptions: hauling a significant portion of the work between a secondary construction site and a primary site (paragraph (B)), hauling between a dedicated support site and a primary or secondary site (paragraph (C)), and, on development-statute work, any transportation by the project's laborers and mechanics (paragraph (E)). Under 29 CFR 5.2, construction does not include transporting materials or supplies to or from the site, unless the trip is "covered transportation." Covered hours are paid and reported at the wage determination rate for the classification worked (29 CFR 5.5(a)(1)(i)).
The hard case is a delivery driver who loads, unloads or waits on site. A 2023 paragraph covered that time when it was not de minimis. A federal court vacated it on June 24, 2026, and the eCFR still prints it. California's trucking rules are different; see our California trucking page.
What counts as the site of the work
The "site of the work" definition in 29 CFR 5.2 turns on the place, not the truck. The judgment did not vacate it.
| Place | Site of the work? | What the definition requires |
|---|---|---|
| Primary construction site | Yes | Where the building or work will remain. |
| Secondary construction site | Yes | Where a significant portion of the work is built for this project, at a site set up for the contract or dedicated exclusively, or nearly so, to it for weeks or months. A significant portion means whole modules, not materials or prefabricated parts. |
| Job headquarters, tool yard, batch plant, borrow pit | Yes | Of a contractor or subcontractor, dedicated exclusively or nearly so to the project, and adjacent or virtually adjacent to a primary or secondary site. |
| Traffic control location | Yes | A location adjacent or virtually adjacent to a primary construction site where workers direct vehicular or pedestrian traffic around or away from it (paragraph (1)(iii)(B)). |
| Permanent home office, branch plant, fabrication plant, tool yard | No | Location set wholly without regard to the project, unless it sits on a primary or secondary site. |
| A material supplier's plant or yard | No | Set up by the supplier for the project before bids opened and not on a primary or secondary site, even if it runs nearly full time on this contract. |
Which driving is covered transportation
The 29 CFR 5.2 definition lists five kinds of covered transportation.
| Paragraph | Driving | Status |
|---|---|---|
| (2)(iv)(A) | Transportation entirely within the site of the work | In force |
| (2)(iv)(B) | Hauling a significant portion of the work between a secondary construction site and a primary site | In force |
| (2)(iv)(C) | Hauling between a dedicated support site next to the project and a primary or secondary site | In force |
| (2)(iv)(D) | A driver's on-site loading, unloading or waiting tied to offsite transportation, when the time is not de minimis | Vacated June 24, 2026 |
| (2)(iv)(E) | Any transportation, on or off the site, by laborers and mechanics employed in developing a project under a development statute | In force |
| (3) | Other transportation of materials or supplies to or from the site | Not construction |
On public housing development and the other development-statute work, paragraph (E) matters. A "development statute" includes the United States Housing Act of 1937, the Housing Act of 1949 and the Native American Housing Assistance and Self-Determination Act of 1996 (29 CFR 5.2). On that work, offsite hauling by the project's laborers and mechanics is covered; see our housing authority guide. Paragraph (E) applies to work under a development statute, as 29 CFR 5.2 defines it. The definition includes the three statutes named above and any other related act the Administrator determines Congress intended to cover this way.
The June 2026 judgment and what it left
What the court vacated
In Associated General Contractors of America v. U.S. Department of Labor, No. 5:23-cv-272 (N.D. Tex.), the final judgment of June 24, 2026 vacated three provisions of the 2023 rule. Two are in 29 CFR 5.2: paragraph (D), and the sentence saying an entity that also does other construction work at the site is not a material supplier. The third is 29 CFR 5.5(e), which read the contract clauses into contracts by operation of law. The court's order records that on June 24, 2024 it had preliminarily enjoined the defendants from enforcing the challenged provisions, which included the truck driver provision, on a nationwide basis; the June 2026 judgment made the vacatur final. The government's appeal was dismissed on June 26, 2026, on the government's own motion, per the docket.
What it left
The judgment's list of vacated provisions does not include the secondary construction site definition or paragraph (B), so they stand (Dkt. 108). The court's order notes in a footnote that the plaintiffs did not end up seeking relief on the secondary construction site provision. The order says vacatur is not limited to the plaintiffs, and records that the government reserved the right to contest vacatur in other cases.
The eCFR and the judgment disagree
The eCFR text of 29 CFR 5.2, up to date as of November 3, 2026, still prints paragraph (D) and the material supplier sentence, with no editorial note about the judgment. The eCFR calls itself authoritative but unofficial and the judgment says the provisions are vacated, so treat them as vacated.
Neither the regulation nor the judgment says how a delivery driver's time on site is treated now. Before 2023, DOL's guidance, as the 2023 preamble summarizes it (88 FR 57624 to 57627), covered a contractor's driver for on-site time tied to offsite hauling when it was more than de minimis, and excluded a few minutes spent dropping off materials. DOL judged this case by case. For a material supplier's employees, the guidance covered on-site construction work other than delivery, or all on-site time once that work reached 20 percent of the workweek.
DOL's rulemaking FAQ refused automated access, so this page cannot say whether DOL still applies that guidance. Ask the prime or contracting officer in writing how to report on-site delivery time before the first payroll.
Your driver, a supplier's driver or an owner-operator
| Who drives | What the sources say |
|---|---|
| Driver employed by a contractor or subcontractor on the contract | Covered for transportation under paragraphs (A), (B) and (C), and under (E) on development-statute work only, and for other covered work at the site, at the determination rate. |
| Driver employed by a material supplier | An entity that meets every part of the material supplier definition is not a contractor, and its agreements are not contracts, except on work under a development statute. Its sole obligation must be delivery, including pickup, loading, unloading and waiting, and the plant that makes the materials must be off the primary and secondary sites and predate bid opening or not serve the project exclusively, or nearly so. That test was not vacated. |
| Truck owner-operator who is a bona fide independent contractor | DOL policy does not apply Davis-Bacon wage requirements to these owners. The policy does not extend to owners of other equipment such as bulldozers, and employees an owner-operator hires are covered in the usual way. |
Footnote 180 of the 2023 preamble traces the policy to DBRA-54 (Nov. 1, 1977) and applies it to truck owner-operators "even though they are laborers or mechanics within the meaning of the Acts." The same footnote says DOL's guidance on working subcontractors "has not been a model of clarity," and quotes a 2003 Administrative Review Board decision (Griffin) noting that DOL "considers even bona fide owner-operators performing DBA-covered work on a DBA-covered project to be due the prevailing rate." Footnote 199 records only that DOL declined to codify the policy in the final rule. On payroll listing, a commenter worried that truck owner-operators "might have to be added to certified payrolls" even though DOL policy does not require paying them Davis-Bacon rates. DOL replied that this "is not a consequence of the final rule" (88 FR 57627). That reply declines to treat listing as a result of the rule. It is not a rule about whether owner-operators are listed, so ask the prime or contracting officer in writing.
A contract label does not settle coverage: the wage clause in 29 CFR 5.5(a)(1)(i) applies "regardless of any contractual relationship" alleged between contractor and worker.
How driver hours show on the certified payroll
- Split each driver-day by place. For a contractor's or subcontractor's driver, coverage follows location, except on development-statute work (29 CFR 5.2). Paying a worker each classification's rate requires payroll records that set out the time in each (29 CFR 5.5(a)(1)(i)).
- Pay and report covered hours at the determination rate. A driver who also does laborer work may be paid each classification's rate for the time worked in it.
- Enter the totals. Records show daily and weekly hours worked in total and on each covered contract, and the classification actually performed ((a)(3)(i)(B)). The certified payroll must set out all of that information ((a)(3)(ii)(B)).
- Check that the determination lists a driver classification. If a class is not listed, the contracting officer must require conformance, which fits when no listed classification does the work, the area uses the class, and the rate bears a reasonable relationship to listed rates ((a)(1)(iii)).
- Submit weekly. Certified payrolls are due for each week in which covered work is performed, with a Statement of Compliance signed by the contractor or its agent who pays or supervises payment ((a)(3)(ii)(A) and (C)). See our WH-347 guide.
State rules are separate
Illinois (see IDOL FAQ 15) and California handle hauling differently, so check both rules on a mixed job. For other states, see the state table.
We prepare certified payroll for public works contractors. Tell us about your project.
Questions
A hauler delivers gravel from an offsite quarry. Is the driver on my payroll?
Is the "not de minimis" truck driver rule still in force?
Do I pay an owner-operator the wage determination rate?
Does hauling count differently on a project under a development statute (public housing development, Housing Act of 1949 or NAHASDA)?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- 29 CFR 5.2 ecfr.gov
- 29 CFR 5.5 ecfr.gov
- June 24, 2026 final judgment storage.courtlistener.com
- 2023 final rule federalregister.gov
- order storage.courtlistener.com
- docket courtlistener.com
- IDOL FAQ 15 labor.illinois.gov