Housing authority certified payroll: when Davis-Bacon applies and what you submit

This page covers federally funded housing authority work, including public housing, CDBG and HOME, under 29 CFR 5.5 and HUD Handbook 1344.1 REV-3 (January 2023). A table shows what five authorities publish.

Last reviewed against the sources it cites

The short answer

It depends on the funding, not on the owner being a housing authority. Davis-Bacon wages reach public housing development, CDBG-financed construction (residential rehabilitation only at 8 or more units), HOME housing with 12 or more assisted units, and direct federal contracts over $2,000. Covered contractors submit certified payrolls weekly to the agency, or to the owner or authority that keeps the records (29 CFR 5.5(a)(3)(ii)(A)), and must let inspectors interview workers on the job.

  • HUD's handbook says most HUD construction work is not covered by the Davis-Bacon Act directly, because Davis-Bacon rates reach HUD programs through Related Acts (Handbook 1344.1, chapter 2, paragraph 2-2).
  • A construction contract that includes 12 or more HOME-assisted units must carry a Davis-Bacon wage provision (24 CFR 92.354).
  • Section 110 requires prevailing wages for laborers and mechanics on construction work financed in whole or in part with CDBG assistance (42 U.S.C. 5310(a)), and residential rehabilitation is covered only if the property has 8 or more units (24 CFR 570.603).
  • You submit certified payrolls weekly for each week in which covered work is performed, and an agency or prime contractor may permit or require an electronic system (29 CFR 5.5(a)(3)(ii)(A)).
  • The duty to let inspectors interview workers sits at 29 CFR 5.5(a)(3)(iv)(A) in the eCFR text up to date as of November 3, 2026, while HUD's handbook, dated January 2023, cites paragraph (a)(3)(iii) (eCFR; Handbook 1344.1, chapter 5).
  • Seattle Housing Authority's prevailing wage page says contractors must enter electronic certified payrolls weekly through LCPtracker.

When Davis-Bacon applies to housing authority work

It depends on the money, not on the owner. The Davis-Bacon Act applies directly where the federal government is a party to a construction contract over $2,000, but HUD's handbook says most HUD construction work is not covered that way. Davis-Bacon rates reach HUD programs through "Related Acts" instead. Common triggers:

Funding sourceWhen the wage rules applySource
Direct federal contractContracts over $2,000 to which the federal government or the District of Columbia is a party, for construction, alteration or repair, including painting and decorating, of public buildings and public works40 U.S.C. 3142
Public housing (section 12 of the U.S. Housing Act of 1937)Davis-Bacon rates for laborers and mechanics employed in developing the project, including a project with nine or more units assisted under 42 U.S.C. 1437f where the agency or HUD and the builder agree to that use before construction or rehabilitation starts42 U.S.C. 1437j(a)
CDBG (section 110 of the Housing and Community Development Act of 1974)Construction work financed in whole or in part with CDBG assistance. Rehabilitation of residential property is covered when it has 8 or more units42 U.S.C. 5310(a), 24 CFR 570.603
HOMEEvery construction contract, rehabilitation or new, for housing that includes 12 or more HOME-assisted units. The count is the total in the contract, even if it spans more than one project24 CFR 92.354(a)

The labor clauses in 29 CFR 5.5(a) go into contracts "in excess of $2,000" for construction "financed in whole or in part from Federal funds" and "subject to the labor standards provisions of any of the laws referenced by ยง 5.1". The Related Act's own thresholds, such as the 8 and 12 units above, apply on top of that floor. Other HUD programs have their own triggers, which the handbook says depend on dwelling units or the amount of HUD assistance. Read the labor clauses and wage determination in your bid documents. For jobs with both federal and state wage rules in California, see Davis-Bacon plus California prevailing wage and CDBG certified payroll in California. For other states, see certified payroll requirements by state.

Public housing maintenance uses HUD-determined wages

The same statute splits public housing work. Development laborers and mechanics get Davis-Bacon rates. Maintenance laborers and mechanics employed in the operation of the project get wages the Secretary of HUD determines or adopts. HACLA's page lists Labor Relations Letter LR 2004-01 for federally funded public housing maintenance, noting that weekly submission is no longer required. The letter, from HUD's Office of Labor Relations and dated October 26, 2006 (revision 1), calls itself "relief and interim guidance". It says HUD is ending the payroll submission duty for HUD-determined maintenance wages, keeps a 3-year records duty, and excludes Davis-Bacon construction work. HACLA still lists it, but this page could not confirm HUD's current position, so ask which rule your authority follows.

What you submit each week

For federally covered work, 29 CFR 5.5(a)(3) sets the baseline:

  • A certified payroll for each week in which covered work is performed. The prime contractor is responsible for submitting all subcontractors' certified payrolls (5.5(a)(3)(ii)(A)).
  • Any format that carries the required information. Form WH-347 is optional. Weekly transmittals must not show full Social Security numbers, last known addresses, phone numbers or emails; use an identifying number, such as the last four digits (5.5(a)(3)(ii)(B)).
  • A Statement of Compliance with each payroll, signed by the contractor or the agent who pays or supervises payment of the workers. The certification on the reverse of the WH-347 satisfies it (5.5(a)(3)(ii)(C) and (D)).
  • An original handwritten or legally valid electronic signature, under the regulation. 29 CFR 5.5(a)(3)(ii)(E) says the signature "must be an original handwritten signature or a legally valid electronic signature." HUD's handbook is stricter for the projects its chapter 4 covers: Local Contracting Agencies (LCAs), employers on Federal Housing Administration (FHA) projects, and HUD staff. Paragraph 4-3(D) of the January 2023 handbook calls for the original signature of the owner, an officer or an authorized designee, in ink, and says signature stamps, photocopies and facsimiles are not acceptable. Chapter 5, paragraph 5-10(K), words it as "an original signature, in ink or other permanent marker". The regulation accepts an electronic signature and the handbook asks for ink, so ask the authority in writing which rule its contract adopts. The detail is in ink or electronic signature on the Statement of Compliance.
  • Records kept at least 3 years after all work on the prime contract is complete (5.5(a)(3)(i)(A) and (ii)(G)).

Where the payroll goes

It goes to the federal agency if the agency is a party to the contract, and otherwise to the applicant, sponsor, owner or other entity that keeps the records, which transmits it to the agency (5.5(a)(3)(ii)(A)). HUD's handbook says each employer submits weekly reports to the sponsor, applicant, or owner, and for HOME the jurisdiction must collect and review certified weekly payroll reports. If your contract does not name the recipient, ask the authority in writing.

Who chooses the payroll system

The regulation names no system. A contracting agency or prime contractor may permit or require an electronic system if it meets three conditions:

  • It requires a legally valid electronic signature.
  • It keeps payrolls available on request to the contractor, the agency and the Department of Labor for at least 3 years after the prime contract work is done.
  • The agency or prime permits other methods where a contractor is unable or limited in its ability to use it.

Authorities choose differently. The table shows what each publishes, as read on November 4, 2026. The San Diego row is a state-law clause, not a Davis-Bacon rule; its guide has the context.

AuthorityWhat it publishesGuide
Seattle Housing AuthorityContractors enter electronic certified payrolls weekly through LCPtracker. It also posts forms for no work performed and authorization to sign payrolls.Seattle guide
HACLA (Los Angeles)Lists the WH-347 as its federal payroll template. On mixed-funded work it requires page 2, the Statement of Compliance, for each pay period. LCPtracker instructions are for contractors who use an LCPtracker account.HACLA guide
SHRA (Sacramento)Says all contractors and subcontractors will be required to use eComply Solutions (page footer 2022). A December 4, 2019 invitation for bid for an under-$10,000 qualified vendor list (IFB 1973-DD) requires the contractor and all lower-tier subcontractors to submit weekly payrolls through eComply.SHRA guide
San Diego Housing CommissionState law, not a federal rule. A 2024 Physical Needs Assessment services contract (No. PM-25-02) attaches a prevailing wage notice under California Labor Code sections 1720 to 1861. It asks for weekly payrolls on DIR Form A-1-131 with wet signatures, or through eComply Solutions, plus monthly filing on DIR's portal.San Diego guide
King County Housing Authority (Washington)Requires payrolls every week on federally funded projects, even if no work is done. Its requirements page names no system. It may interview at least one person from every contractor and subcontractor.King County guide

HUD's own documents name an electronic system under two different names and do not say whether it is the same system. Notice H 2015-09, issued October 5, 2015, says use of its "Davis-Bacon Electronic Certification Submission Program" will be mandatory after March 31, 2016 for projects less than 50% complete, including "all Public Housing Authority construction loans", and stays in effect until amended, superseded or rescinded. For FHA projects, the January 2023 handbook, paragraph 4-3(A), says employers are "highly recommended" to use the "HUD-authorized Electronic Payroll System (EPS)," so the notice and the handbook conflict there. Paragraph 5-10(B) speaks generally of "the HUD system in use for Electronic Payroll". This page could not confirm which governs now. On a HUD-financed construction loan, ask the HUD labor standards specialist which system applies to you, in writing.

HUD-11 employee interviews

Under 29 CFR 5.5(a)(3)(iv)(A), you must make your records available and permit authorized representatives to interview workers during working hours on the job. If you refuse, the federal agency may, after written notice, cause suspension of further payment, advance or guarantee of funds, and the refusal may be grounds for debarment (5.5(a)(3)(iv)(B)).

Which paragraph to cite

In the eCFR text, up to date as of November 3, 2026, the duty sits at (a)(3)(iv)(A). The handbook, dated January 2023, cites 29 CFR 5.5(a)(3)(iii) for it, but in the eCFR text (iii) covers contracts, subcontracts and related documents. If a clause cites the older number, find the same words in the current text.

The form is the inspector's, not yours

The handbook says inspectors, whether HUD or Local Contracting Agency staff or fee and contract inspectors, record each interview on form HUD-11, Record of Employee Interview. You do not submit it. Each worker is told the interview is confidential. For how an examiner checks the form against your payroll, see the HUD-11 employee interview form guide.

Help with your project

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Does Davis-Bacon apply to every housing authority contract?
No. Coverage follows the funding, as the table near the top of this page shows, and the handbook lists examples of HUD programs that are not covered.
Do I have to use LCPtracker or eComply?
The federal regulation lets a contracting agency or prime contractor permit or require an electronic system, so read your contract. Seattle names LCPtracker and SHRA names eComply. For HUD-financed construction loans, Notice H 2015-09 states a mandatory HUD system (see the HUD paragraph in the payroll system section above).
Do I fill out a HUD-11?
No. Inspectors record interviews on it. Your duty is to permit interviews with your workers during working hours on the job.
Do I submit a payroll for a week with no work?
The regulation requires one for each week in which covered work is performed. For the projects covered by chapter 4 of HUD's handbook, paragraph 4-3(C) says no report is required for a week with no work on the site if your reports are numbered sequentially or you gave written notice that work was suspended. Authorities differ (King County Housing Authority asks for a payroll every week even if no work is done), so ask yours in writing what it wants. See no work performed weeks.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. 29 CFR 5.5 ecfr.gov
  2. HUD Handbook 1344.1 REV-3 (January 2023) hud.gov
  3. 24 CFR 92.354 ecfr.gov
  4. 42 U.S.C. 5310(a) govinfo.gov
  5. 24 CFR 570.603 ecfr.gov
  6. Handbook 1344.1, chapter 5 hud.gov
  7. Seattle Housing Authority's prevailing wage page seattlehousing.org
  8. construction contract over $2,000 govinfo.gov
  9. 42 U.S.C. 1437j(a) govinfo.gov
  10. HACLA's page hacla.org
  11. letter hacla.org
  12. covers hud.gov
  13. SHRA (Sacramento) shra.org
  14. December 4, 2019 invitation for bid for an under-$10,000 qualified vendor list shra.org
  15. San Diego Housing Commission sdhc.org
  16. King County Housing Authority (Washington) kcha.org
  17. Notice H 2015-09 hud.gov

Questions about your project

We prepare certified payroll for public works contractors. Tell us about your project.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us