FDOT certified payroll: Form 700-010-69, the 7 day rule, and payroll violation notices
This page covers the weekly payroll on a federally funded, FDOT-administered contract and what follows a violation notice. Sources: FDOT's Construction Project Administration Manual (CPAM) section 5.4 (revised March 13, 2018, per FDOT's CPAM index) and its Equal Opportunity Contract Compliance Manual (chapter 6 and chapter 1, effective November 18, 2021, the "EO manual"), and FDOT's forms.
Last reviewed against the sources it cites
The short answer
FDOT's EO manual requires weekly certified payroll on federally funded contracts, not on state-funded ones. On an FDOT-administered federal contract, each payroll, on WH-347 or Form 700-010-69, is due within 7 days of the regular payment date. A violation notice for Codes 3 to 6 allows 20 calendar days for a supplemental payroll, and a 2022 FDOT Q&A says select major projects require an electronic payroll system.
- Table 1.7.6.5 of FDOT's EO manual (effective November 18, 2021) marks certified payrolls YES for prime contractors, subcontractors, rental agreements with operators and agencies supplying job site workers on federally funded contracts, and NO in every state-funded column.
- EO manual 6.5.12 has the prime submit payrolls within seven calendar days after the regular payment day and makes it responsible for subcontractors, rental companies with operators and temporary employment agencies.
- CPAM 5.4.7 (revised March 13, 2018) accepts either the WH-347 or Form 700-010-69, or an equivalent document with all the information USDOL requires.
- For violation Codes 3 to 6, a certified supplemental payroll with proof of payment is due in 20 calendar days, counted from receipt of the notice in CPAM 5.4.8 but from the date on the notice in Form 700-010-59, so calendar the earlier date.
- FDOT's 2022 FHWA 1273 workshop Q&A says FDOT requires an electronic payroll system on select major projects (it names Elation and LCPtracker) and that adopting one in Florida means using it exclusively.
- EO manual section 1.6.3 says a performance deficiency withholds the project's monthly progress estimate in its entirety, and later estimates too until it is resolved.
You received a Notification of Payroll Violation
The Resident Engineer or a designee issues a Notification of Payroll Violation, Form 700-010-59 when certified payrolls contain errors or omit required wage information (CPAM 5.4.8). The code on the notice decides what happens to your money.
| Code | What it means | What FDOT asks for | If it is not resolved |
|---|---|---|---|
| 1 | Overtime over 40 hours in a week not paid at 1.5 times the basic rate | Back wages and a penalty are withheld; you send proof of restitution, a supplemental payroll and an explanation | FHWA's Division Administrator decides; 60 day appeal window |
| 3, 4, 5, 6 | 3: improper classification. 4: rate below the wage determination. 5: math errors that point to underpayment. 6: unauthorized deductions | A certified supplemental payroll with proof of payment, within 20 calendar days | A Performance Deficiency Letter that withholds the monthly progress estimate |
| 7 | Other violation not listed | The notice's comments state the correction and time allowed | The progress payment is withheld |
Codes 3 to 6: the 20 day clock
The sources differ on when the 20 days start. CPAM 5.4.8 and EO manual 6.6.3 count the day the prime receives the notice as day one, and EO manual Tables 1.6.5.1 and 1.7.6.5 also run from receipt. Form 700-010-59 counts from the date beside its signatures. A notice dated November 1 and received November 4 runs to November 21 by the form and to November 23 by receipt, so calendar the earlier date.
Proof of payment can be a canceled check, a pay stub or the worker's signed affidavit (CPAM 5.4.8; EO manual 6.6.3). If you cannot find the worker, you still owe the money, paid to the USDOL Wage and Hour Division (6.6.4).
Code 1: Form 700-010-54 and the 60 day appeal
On Code 1, CPAM 5.4.8 assesses $10.00 per day plus the additional gross wages due, and the form's note makes the penalty per violation per day for each employee within one payroll week. The Resident Engineer's letter attaches Form 700-010-59 and Form 700-010-54, FDOT's memo to its Disbursement Operations office listing what to withhold or release. You do not complete it.
Your deadline. CPAM and Form 700-010-59 give no Code 1 deadline: CPAM's sample letter leaves a close-of-business date blank, and the form's 20 day sentence covers notices where no penalty has been assessed. EO manual Tables 1.6.5.1 and 1.7.6.5 do apply 20 calendar days from receipt to supplemental payrolls on any Form 700-010-59. Use the date in the Resident Engineer's letter, and if it has none, treat 20 days from receipt as your deadline. If FDOT and you cannot agree, the FHWA Division Administrator decides, and you may appeal to the Federal Highway Administrator, the Secretary of Labor or the Court of Claims, through FDOT, within 60 days of receiving the formal withholding notice by email.
The penalty amount conflicts. CPAM and the form say $10. FHWA-1273 (revised June 25, 2026), Section IV paragraph 2, ties liquidated damages for each laborer or mechanic, for each calendar day over 40 hours, to 29 CFR 5.5(b)(2), and the eCFR text reads $33. Ask the Resident Engineer in writing which figure applies.
What a missing or late payroll triggers
A violation letter issues when you worked on the project but sent no payroll for the week, the payroll is not received within 7 days of its regular payment day, or the Statement of Compliance is wrong or incomplete (EO manual 6.6.2). The escalation in EO manual 1.6 and Tables 1.6.5.1 and 1.6.5.2 runs on windows of 7 business days, then 7 business days, then release on verification:
- Non-Receipt Payroll Letter. It can issue any day and is not held for the monthly notice (1.6.5). It is due 7 business days after issue.
- Performance Deficiency Warning Letter, including Notice of Intent to Withhold the Monthly Progress Estimate. It issues the first business day after that due date, with 7 more business days to respond.
- Performance Deficiency Letter, including Notice of Withholding. The Resident Engineer signs it, and it issues the first business day after the warning period. The data is due at the contractor's discretion, and FDOT releases the estimate on receipt and verification.
The project's whole monthly progress estimate is withheld, and later ones too until the deficiency is resolved. Resolving it does not erase it: it can lower the prime's performance rating (1.6.3).
FDOT's 2026 Table 1.6.5.3 (updated January 27, 2026) is the monthly calendar from the Notice of Noncompliance to the Warning Letter and Performance Deficiency Letter. For a missing payroll that is still outstanding after the Non-Receipt Payroll Letter's 7 business day due date, the warning issues the first business day after that due date (Table 1.6.5.1 rows E to G). The table's Notice of Noncompliance column covers DBE, EEO and OJT, not payroll letters, which carry their own dates (1.6.5).
What CPAM 5.4.11 says about withholding
Both documents are current on FDOT's site: the CPAM index lists section 5.4, and EO manual 6.1.2 points to the latest CPAM. CPAM 5.4.11(1) lets the Resident Engineer withhold the monthly progress estimate, after advance written notice, when a contractor keeps ignoring requests for payrolls or forms. It names a subcontractor's pro rata share first, while the EO manual withholds the whole estimate.
The 7 day rule
Payrolls are due for every week in which any contract work is performed. CPAM 5.4.6 and EO manual 6.5.12 set the deadline at seven days after the regular payment date, calendar days under the EO manual. The prime must assure that all payrolls are submitted, including those of subcontractors, rental companies (for agreements with operators) and temporary employment agencies (6.5.12), so ask your prime how it gets yours to FDOT. 29 CFR 3.4(a) sets the same 7 days. Warranty work after final pay-off also needs certified payroll for craft and laborer workers who spend more than 20% of their workweek on the site of the original work (6.5.11).
Form 700-010-69 or WH-347
CPAM 5.4.7 says each payroll comes with the WH-347 or Form 700-010-69, or an equivalent document with all the information USDOL requires. Our WH-347 guide covers the federal form. Form 700-010-69 is FDOT's Wage and Hour Record: a payroll record plus a signed Statement of Compliance (EO manual 6.5.15). For a classification missing from the wage determination, see FDOT's Classification Request Manager (CPAM 5.4.10) and our SF-1444 guide.
How you submit and sign
CPAM 5.4.7 says FDOT requires electronic submission, to the Resident Engineer or a designee (5.4.6). On select major projects, FDOT requires an electronic payroll system, according to its 2022 FHWA 1273 workshop Q&A, which names Elation and LCPtracker and says that in Florida even voluntary adoption of one requires its exclusive use. Emailing PDFs is the wrong channel there. The Q&A points to the contract specification as the source, so check yours. Our Elation guide covers that system, and FDOT's undated Contract Compliance FAQ adds that some districts are advocating a statewide payroll system.
The sources differ on signatures:
| Source | What it says |
|---|---|
| CPAM 5.4.7 (March 13, 2018) | Digital signature sufficient; a scanned or pdf copy does not satisfy |
| EO manual 6.5.2 (November 18, 2021) | Signed electronically or handwritten; a scanned or pdf copy satisfies |
| Contract Compliance FAQ (undated) | The WH-347 Statement of Compliance may be signed with a traditional handwritten (wet ink) signature |
| Form 700-010-69 instructions; DOL WH-347 instructions (undated) | Electronic signature accepted; scanned copies do not satisfy |
Every source accepts an electronic signature, and the FAQ and EO manual also accept an original handwritten one. Only a scan divides them, so sign electronically or in original ink and do not send a scan. A signing certificate must come from an approved certificate authority (CPAM 5.4.6). You, or your agent who pays or supervises payment, sign the Statement of Compliance.
Which jobs this covers
EO manual Table 1.7.6.5 marks certified payrolls YES for prime contractors, subcontractors, rental agreements with operators and agencies supplying job site workers on federally funded contracts, and NO for suppliers, rentals without operators and every state-funded column. Wage requirements are in every federally funded FDOT contract of $2,000 or more (6.1.2). Florida's minimum wage, $15.00 an hour from September 30, 2026 per Florida Commerce, applies on all FDOT projects, federal or state funded (CPAM 5.4.4; EO manual 6.1.3).
Florida law bars the state and local governments from requiring a predetermined wage on public works they fund, except as required by federal or state law (255.0992(2)(b)), and does not apply to contracts executed under chapter 337, which includes FDOT's contracting authority. FHWA ended its rule requiring FHWA-1273 to be physically incorporated into contracts on June 10, 2026, but did not exempt contractors from the underlying requirements (our guide). For other states, see the state-by-state guide.
Local roads and local agency jobs
FHWA-1273 Section III exempts roadways classified as local roads or rural minor collectors, except where applicable law requires a project to be treated as a Federal-aid highway project, such as Surface Transportation Block Grant projects under 23 U.S.C. 133 (excluding recreational trails projects). On Local Agency Program (LAP) jobs, EO manual 1.7.7 says projects off the Federal-Aid Highway, National Highway System and State Highway System have no Davis-Bacon or Copeland requirement, except Safe Routes to Schools, Non-motorized Transportation Pilot Projects, and high priority and other congressionally designated projects. LAP contractors may follow either the local agency's forms and reporting requirements or FDOT's, and the local agency tells them which. This page covers FDOT-administered contracts, so on a LAP job ask the agency what applies.
We prepare certified payroll for public works contractors. Tell us about your project.
Questions
Does Florida require certified payroll?
Must I use Form 700-010-69, or can I send the WH-347?
How long do I have to answer a Notification of Payroll Violation?
What happens if FDOT does not receive my payroll?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- Construction Project Administration Manual (CPAM) section 5.4 fdotblob.core.windows.net
- FDOT's CPAM index fdot.gov
- chapter 6 fdotblob.core.windows.net
- chapter 1 fdotblob.core.windows.net
- Form 700-010-69 pdl.fdot.gov
- Form 700-010-59 pdl.fdot.gov
- 2022 FHWA 1273 workshop Q&A fdotblob.core.windows.net
- Form 700-010-54 pdl.fdot.gov
- FHWA-1273 fhwa.dot.gov
- eCFR text ecfr.gov
- 2026 Table 1.6.5.3 fdotblob.core.windows.net
- 29 CFR 3.4(a) ecfr.gov
- Contract Compliance FAQ fdotblob.core.windows.net
- DOL WH-347 instructions dol.gov
- approved certificate authority fdot.gov
- Florida Commerce floridajobs.org
- Florida law flsenate.gov
- chapter 337 flsenate.gov
- ended fhwa.dot.gov