IDOL notice of violation: the penalties, the hearing request and the debarment list

This page reads section 11 and section 11a of the Prevailing Wage Act, the Department's hearing rule and its Prevailing Wage Act FAQ, all read November 2026.

Last reviewed against the sources it cites

The short answer

If you underpaid workers, section 11 makes you liable to the Department for 20 percent of the underpayments, or 50 percent where a second or later action finds you liable. Separately, a second notice within five years gives you 10 working days to request a hearing in writing. Miss that window and you go on the debarment list for four years, for violations on or after January 1, 2006.

  • Section 11 makes a contractor who underpaid liable to the Department for 20 percent of the underpayments, and 50 percent where a second or later action finds underpayments.
  • The same section 11 adds punitive damages to the worker of 2 percent of the penalty for each month following the date of payment during which the underpayment remains unpaid, or 5 percent on a second or later action.
  • 56 Ill. Adm. Code 100.26 (amended 2006) gives a hearing right on the notice of the second violation, by certified mail or in person within 10 working days of receipt.
  • Section 11a requires the hearing to take place no later than 45 calendar days after the Department receives your request.
  • Under section 11a, failing to answer a second determination within 10 working days means automatic placement on the published list, with no public works contract awarded for 4 years from publication.

Scope check first. Section 11 says the Act does not apply to federal construction projects that require a prevailing wage determination by the United States Secretary of Labor, except as described in section 2. Check which wage law your contract invokes before you assume the Act applies.

You have a notice in hand: read what kind it is

The Illinois Department of Labor (IDOL) issues a Notice of Violation when it finds a breach of the Prevailing Wage Act. The FAQ says a Notice of Violation follows a failure to keep or produce the required records (item 11) and a failure to submit a certified payroll (item 12). Underpaying workers is also a "violation" under the Department's rule 100.22, which defines the term to include failing or refusing to pay the prevailing wage.

The statute adds more. Section 4 says a contractor who fails to put the prevailing wage stipulation in a subcontract (subsection (h)), or to give a subcontractor the written statement when there is no contract (subsection (i)), is in violation of the Act. Subsection (n) says the same of failing to post the wage rates on site or give them to workers in writing.

Two questions decide what your notice means.

  1. Is it your first notice, or your second within five years?
  2. Does it carry an underpayment, or is it a records, posting or filing violation?

The two-notice structure

Under section 100.24, first and second notices come by certified mail. Each must identify itself as a first or second notice and contain a statement of remedies available to the contractor or subcontractor and the Department. Read that statement on a first notice. The notice also states the money the Department estimates is in controversy.

The hearing right sits on the second notice, not the first. Section 100.26(a) says a hearing starts on your request after you receive "the notice of a second violation of the Act within five years from the date of the notice of first violation." The five-year clock therefore runs from the date of the first notice.

NoticeWhat the sources say
First noticeThe hearing request under rule 100.26(a) comes only after a notice of a second violation. The first notice starts the five-year count. Back wages and penalties under section 11 can still be pursued.
Second notice within five yearsYou have 10 working days from receipt to ask for a hearing, in writing, by certified mail or in person to the Department.
No request in timeSection 100.26(a) bars the contractor, and its directors, officers, agents, representatives or other controlling persons acting for it, from public works contracts. Section 100.28 sets the term at four years where the violations behind both notices occurred on or after January 1, 2006, and two years for earlier violations.

A 2011 Illinois Times report gives one contractor's account. The contractor said it paid more than $40,000 in back wages on a first notice, tried to contest IDOL's findings and was denied. The report quotes IDOL's then director saying a first notice is essentially a warning. It also reports IDOL's position, filed through the Attorney General's office, that a contractor who disagrees should not pay, but wait for IDOL to sue in circuit court, where it could offer a defense. This is a 2011 press account of contested litigation, not an agency statement, so read your own notice for what it offers today.

The underpayment math

Section 11 sets the money. The contractor or subcontractor is liable to the workers for the difference between what was paid and the prevailing rate, with costs and reasonable attorney's fees. It is also liable to the Department for 20 percent of the underpayments. On top of that, the contractor is additionally liable to the worker for punitive damages of 2 percent of that penalty for each month following the date of payment during which the underpayments remain unpaid. The statute does not state how the 2 or 5 percent divides among workers.

First actionSecond or later action
Penalty to the Department20 percent of the underpayments50 percent of the underpayments from that action
Punitive damages to the worker, as a percent of the penalty2 percent for each month following the date of payment that underpayments remain unpaid5 percent for each month following the date of payment that underpayments remain unpaid
Example, $10,000 underpaid$2,000 penalty$5,000 penalty

The penalty example is arithmetic on the statute's percentages, not a real case. The IDOL FAQ (item 13) states the same 20, 2, 50 and 5 percent figures. The FAQ words the trigger as a second or subsequent "violation"; the statute words it as a second or subsequent "action" that finds you liable. Read your notice for which one it relies on.

IDOL may also take an assignment of a worker's claim, sue on it, and require you to pay the costs of collecting. The section was last amended by Public Act 104-852, effective August 21, 2026.

When the public body gave no notice

Section 4(g) and (j) apply where a complaint is made and IDOL determines a violation occurred. IDOL then determines whether proper written notice of the prevailing wage was given. If the public body did not give proper written notice, IDOL orders the public body to pay the interest, penalties or fines that would have been owed by you. Look in your contract documents for the public body's written wage notice. You still owe the back wages, which are limited to the difference between what you paid and the required rate. Subsection (j) applies the same rule between a prime contractor and its subcontractor.

Records, posting and subcontract notices

A notice that is not about wages usually cites records. Section 5 requires you to keep worker records for 5 years from the last payment on contracts paid on or after January 1, 2014. On 7 business days' notice you must make them available for inspection and copying in Illinois to the public body, the Director and law enforcement. IDOL's FAQ (item 10) adds that on demand you must submit a sworn statement that the records are accurate.

Missed payroll notices

A failure to submit a monthly payroll can draw a Notice of Violation (FAQ item 12). Section 5(d) carries its own civil penalty and a 10 business day hearing request on a finding of that offense. Our Illinois certified payroll page covers that clock, the portal and the misdemeanor route. The sources do not say whether a missed-payroll notice counts toward a second violation under section 11a, so ask IDOL which rule your notice relies on. Read which rule your notice cites, because the clocks differ in wording (10 business days there, 10 working days here).

The 10 working day hearing request

Under section 11a, once IDOL determines you violated the Act on two separate occasions within five years, it notifies you. You then have 10 working days to request a hearing on the alleged violations. Section 100.26 adds the form: in writing, by certified mail or in person, within 10 working days after receipt, so note the date you received it.

  1. Send a written request by certified mail, or deliver it in person, and keep proof.
  2. Expect a hearing date. Section 11a says the hearing must take place no later than 45 calendar days after the Department receives your request.
  3. Prepare under the Department's hearing procedures. Rule 100.26(b) sends these hearings to 56 Ill. Adm. Code 120, whose table of sections includes answers, discovery, subpoenas, default and judicial review.

The debarment list

Section 11a has the Director publish in the Illinois Register, at least once each quarter, a list of contractors found to have disregarded their obligations to employees. No contract may be awarded to a listed contractor, or to a firm in which it has an interest, until 4 years have elapsed from the date of publication. If you ask in time, the Director sets a hearing instead; silence puts you on the list automatically and immediately.

IDOL's debarred contractors page says the bar reaches firms in which a listed contractor has an interest and their directors, officers, agents and other controlling persons, and that its list is not exhaustive. As read in November 2026, it named one company, debarred for four years effective May 5, 2025.

A separate route skips the hearing. Section 11a says a contractor convicted or found guilty under section 5 or 6 faces automatic debarment for four years with no right to a hearing. The Illinois page covers that route.

Records to pull together

Gather the notice with its receipt date, any earlier IDOL notice, payroll records for each worker named matched to the contract's wage schedule, and the public body's written notice of rates.

For payroll records see how to fill out Form WH-347 and which WH-347 version to use. The state requirements table shows how other states differ. For IDOL's own contact options, use the IDOL contact page.

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Can I request a hearing on a first notice of violation?
The hearing rule, section 100.26(a), ties the hearing request to the notice of a second violation within five years. Rule 100.26(a) limits the hearing request to the notice of a second violation. A notice for failing to submit a monthly payroll has its own hearing request under section 5(d).
What if I miss the 10 working days?
Under section 11a, failing to respond within 10 working days results in automatic and immediate placement and publication on the list. No contract may be awarded to you for 4 years from publication.
Does debarment reach my officers?
Section 100.26(a) names the contractor's directors, officers, agents, representatives or other controlling persons acting through or on its behalf. IDOL's debarred contractors page repeats this and adds firms in which the contractor has an interest.
Do I owe the 20 percent if I already paid the back wages?
Section 11 makes the contractor liable to the Department for 20 percent of the underpayments in addition to the wage difference. Section 11 makes the 20 percent additional to back wages, so read your notice for what it demands.
How long can workers sue for underpayments?
The worker's right of action under section 11 must be brought within 5 years from the date of the failure to pay the wages or compensation.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. section 11 ilga.gov
  2. section 11a ilga.gov
  3. hearing rule ilga.gov
  4. Prevailing Wage Act FAQ labor.illinois.gov
  5. section 2 ilga.gov
  6. rule 100.22 ilga.gov
  7. Section 4 ilga.gov
  8. section 100.24 ilga.gov
  9. Section 100.28 ilga.gov
  10. Illinois Times report illinoistimes.com
  11. Section 5 ilga.gov
  12. table of sections ilga.gov
  13. debarred contractors page labor.illinois.gov
  14. IDOL contact page labor.illinois.gov

Questions about your Illinois project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us