Missouri PW-5 and PW-8 check-off lists: which items are law
This page reads the contractor list (PW-8) and the public body list (PW-5) against the statutes they cite, on the Division of Labor Standards Public Works Guidebook page.
Last reviewed against the sources it cites
The short answer
PW-8 is the Division of Labor Standards checklist for contractors and PW-5 is the one for public bodies. Nearly every item restates a Missouri statute or rule, and the LS-57 form is DLS's optional aid. Two are easy to miss: posting the wage rates at the worksite, and the 10-hour OSHA training duty, which carries a $2,500 plus $100 per employee per day forfeiture.
- RSMo 292.675.4 sets a forfeiture of $2,500 plus $100 for each employee, for each calendar day, that an employee works without the required 10-hour training.
- Under RSMo 292.675, an employee has 60 days from starting work to complete the training, and the penalty does not begin to accrue until the periods in subsections 2 and 3 (60 days to complete the training, 20 days to produce documents) have elapsed.
- RSMo 290.265 requires each contractor and subcontractor to keep a legible statement of the wage rates posted at the site for as long as any worker is employed there.
- RSMo 290.325 bars a public body from awarding the contract or paying out funds unless the wage determination has been made part of the specifications and contract.
- The PW-8 PDF carries the footer 10-17 and the PW-5 PDF the footer 08-18, even though both sit under a 2025/11 web path.
What PW-8 and PW-5 are
The Division of Labor Standards (DLS) publishes two one-page checklists. The guidebook page names PW-8 as the list for contractors and PW-5 as the list for public officials. Both run through three stages: before the contract is let, while it is performed, and before it is fully paid.
They are dated. The PW-8 PDF has the footer 10-17 and the PW-5 PDF has 08-18. The current RSMo 290.250 took effect on 28 August 2018, so check any figure on a checklist against the statute.
The duties people miss: OSHA-10 training
PW-8 tells the contractor and every subcontractor to require all on-site employees to complete a ten-hour construction safety program. The duty is in RSMo 292.675, which sits in chapter 292, apart from the prevailing wage law in chapter 290.
The rules in the statute
- Who: "on-site employees" of the contractor and its subcontractors. People engaged solely in hauling materials, fuel or equipment to the site are not on-site employees under subsection 1(4).
- When: an employee who has not completed the program must do so within 60 days of starting work on the project (subsection 2). An employee found on site without documents gets 20 days to produce them before removal (subsection 3).
- Penalty: $2,500 plus $100 for each employee, for each calendar day or part of a day, that the employee works without the training (subsection 4). It does not begin to accrue until the 60 and 20 day periods have run.
- Who pays: the statute says "the contractor shall forfeit" the amount, including for a subcontractor's employees. The prime may withhold the sum from the subcontractor, or sue to recover it if it already paid.
- Source wording: the DLS safety training page words the penalty as $100 for each calendar day an employee worked, without "each employee", and says contractors are jointly liable for their subcontractors' penalties. The statute text controls the amount.
- How it is collected: the public body withholds the forfeiture from payments under the contract. DLS investigates, tells the public body and the party found in violation, and must pursue an enforcement action if the penalty is unpaid 45 days after notice (subsections 5 and 6). The determination can be appealed in the circuit court of the county where the project is located (subsection 5).
- Exclusions: public utilities under the Public Service Commission and their contractors, and rail grade crossing projects under a signed railroad agreement with the Missouri Department of Transportation or an order from it (subsections 8 and 9).
The text of section 292.675 sets no dollar threshold. The $75,000 line you may know is in RSMo 290.230.5 and by its terms covers sections 290.210 to 290.340.
What DLS adds
The DLS required safety training page says OSHA 10-hour completion cards do not expire and that DLS-approved programs of equal rigor count, with OSHA 30-hour listed as an approved alternative. It also counts delivery drivers as on-site employees if they assist in loading or unloading the delivery vehicle at the site, or do any other work there. That is consistent with the word "solely" in subsection 1(4): a driver who only drops off and leaves is outside the definition. The DLS contact page lists how to reach the division.
The other duties our Missouri payroll page does not cover
Wage order in the specifications
Under RSMo 290.250.1, the public body must request the wage determination before advertising for bids, and the determination "shall be attached to and made a part of the specifications." RSMo 290.325 bars the award, and any payment of funds, until that has happened. PW-8 lists this under "Before Contract Is Let" even though the duty belongs to the public body. As a contractor, read your bid documents for the wage order.
Rates posted at the worksite
Each contractor and subcontractor must keep a legible statement of the wage rates posted in a prominent, easily accessible place at the site, for the full time any worker is employed there (RSMo 290.265). Each subcontractor posts its own, so a prime's notice does not cover a sub.
PW-8 item by item: law or guidance
| PW-8 item | Source it cites | Law or guidance |
|---|---|---|
| Pay not less than the wage order rates | RSMo 290.250 | Law, 290.250.1 |
| $100 per worker per day for underpayment | RSMo 290.250 | Law. A notice of penalty is not due for 45 days, and you may dispute it in writing within that time (290.250.2 and 290.250.3) |
| OSHA-10 training and forfeiture | RSMo 292.675 | Law, covered above |
| Post the wage rates | RSMo 290.265 | Law |
| Keep payroll records open to inspection, in Missouri, for one year after completion | RSMo 290.290 | Law, 290.290.1 |
| Use the LS-57 payroll form | 8 CSR 30-3.010(7) | The form is DLS's aid. The rule sets what the records must show |
| Affidavit of compliance before final payment | RSMo 290.290 and 290.325 | Law, 290.290.2. The statute requires the affidavit "in proper form and order" and does not name the PW-4 |
| Withhold from a subcontractor to cover its penalties | RSMo 290.250.1 | A right, not a duty: it says a contractor "may" withhold |
The LS-57 is the one optional form. The guidebook says the form may be used to help ensure records contain what the law requires. The rule it cites, 8 CSR 30-3.010(7), lists what each payroll must record: occupational title, worker type, name and address, rate, daily and weekly hours, deductions and wages paid. See our LS-57 guide.
One citation does not fit. PW-8 cites section 290.325 beside 290.290 for the rule that no payment is made before the affidavit, but 290.325 is about awarding and paying without a wage determination in the specifications. The affidavit rule itself is 290.290.2. The statute, PW-8 and PW-5 say the affidavit goes to the public body, but the guidebook page says all contractors and subcontractors must submit it to the Division before any contract is fully paid. Ask the public body whether DLS also wants a copy. For the affidavit, see our PW-4 guide.
What PW-5 adds for the public body
- PW-3 request: PW-5 has the public body send a Request for Wage Determination (PW-3) before letting the contract. 8 CSR 30-3.010(2) says to start it at least ten calendar days before advertising, unless DLS accepts extenuating circumstances.
- Contract language: PW-5 suggests statements for the $100 underpayment forfeiture and the OSHA-10 forfeiture. Both statutes tell the public body to put the stipulation or notice in the contract.
- Subsidies: PW-5 cites RSMo 290.095. The statute bars a wage subsidy, bid supplement or rebate that pushes pay below the required rate. Under subsection 2, "the entity receiving" a lawful subsidy, supplement or rebate must report its date and amount to the public body within 30 days of payment. PW-5 lists the item for the public body to verify.
- PW-6: PW-5 says to report any possible violation to DLS on the PW-6 complaint form. The PW-6 form is DLS's, but 8 CSR 30-3.010 backs the item for a public body that finds a violation on inspection: it says any violation "shall be immediately reported" to the Division of Labor Standards.
The two lists also differ on scope. PW-8's introduction says the law covers "every construction project." PW-5's says projects over $75,000. The statute, RSMo 290.230.5, excludes a project when either the engineer's estimate or the bid accepted for the total project cost is $75,000 or less. Under 290.230.7, if a change order pushes the cost over $75,000, the law applies to the portion in excess. PW-5's description matches the statute, and PW-8's introduction, with its 2017 footer, does not mention the exclusion. Our Missouri certified payroll guide covers the threshold, the payroll schedule and the penalty process.
What happens if you miss an item
Both lists close with the same warning: civil action, including an injunction stopping work, and criminal fines of up to $500 and up to six months in jail for each day of violation. The statute is looser than that summary. RSMo 290.340 sets, for a willful violation, a fine up to $500, up to six months in jail, or both, and each day the violation continues is a separate offense. The money consequences you will see first are withheld payments under 290.250.1 and 292.675.4.
Other states set their own rules. See certified payroll rules in every state.
We prepare certified payroll for public works contractors. Tell us about your project.
Questions
Is the PW-8 checklist required by law?
Do I need OSHA-10 training on a Missouri public works job?
Who pays the OSHA-10 penalty if my subcontractor's worker has no card?
Where do I post the Missouri prevailing wage rates?
Why does the PDF address say 2025 when the forms say 2017 and 2018?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- PW-8 labor.mo.gov
- PW-5 labor.mo.gov
- Public Works Guidebook labor.mo.gov
- RSMo 292.675.4 revisor.mo.gov
- RSMo 290.265 revisor.mo.gov
- RSMo 290.325 revisor.mo.gov
- RSMo 290.250 revisor.mo.gov
- DLS safety training page labor.mo.gov
- RSMo 290.230.5 revisor.mo.gov
- DLS contact page labor.mo.gov
- 290.290.1 revisor.mo.gov
- 8 CSR 30-3.010(7) sos.mo.gov
- RSMo 290.095 revisor.mo.gov
- RSMo 290.340 revisor.mo.gov