New Hampshire certified payroll: no state law, so who asks for yours?

This page draws on RSA chapter 280, RSA 228:4-b, the NH Community Development Finance Authority (CDFA) CDBG manual, an NHDOT compliance letter dated February 21, 2023, and a Manchester airport bid manual from February 2025.

Last reviewed against the sources it cites

The short answer

No. New Hampshire repealed its public works wage chapter in 1985, so no state agency collects a prevailing wage payroll. Certified payroll follows the federal money. On federal-aid highway work the weekly duty comes from 29 CFR 5.5 and NHDOT asks for payrolls within 14 days, airport payrolls go to the sponsor or the FAA, and CDBG payrolls go to the grantee within 7 to 11 working days.

  • RSA chapter 280, the public works minimum wage chapter, was repealed by 1985, 117:1, effective July 13, 1985, according to the New Hampshire statutes.
  • NHDOT's letter dated February 21, 2023 (a copy hosted on a town project site) says a contractor found out of compliance on a federally funded project has seven calendar days to correct deficiencies and supply supporting documentation.
  • The CDFA manual says a CDBG contractor submits each certified payroll to the grantee within seven to eleven working days after the payroll period ends.
  • Section 90-11 of the February 2025 Manchester-Boston Regional Airport bid documents makes approval of final payment contingent on weekly payroll records not previously received from the general contractor and all subcontractors.
  • 49 U.S.C. 47112(b) requires an airport development contract over $2,000 under an FAA grant agreement to require wage rates set by the Secretary of Labor.
  • NHDOT's Form 14a (revised December 17, 2024) says payrolls are submitted to NHDOT no later than 14 calendar days from the end of the week in which work was performed.

New Hampshire has no prevailing wage law

New Hampshire has no state prevailing wage law for public works. RSA chapter 280, "Minimum Wages of Employees in Public Works," was repealed by 1985, 117:1, effective July 13, 1985 (RSA chapter 280), and the Title XXIII chapter list shows no other chapter on public works wages. Other states differ; see our state-by-state table.

State transportation projects do carry a state filing, but it is not payroll: RSA 228:4-b requires contractors on covered highway, bridge and similar projects to give the Department of Transportation proof of New Hampshire workers' compensation coverage and a work certificate before work starts, with routine rental-agreement maintenance and deliveries excluded, and the work certificate certifies compliance with the workers' compensation law.

Who collects payroll in New Hampshire instead

Weekly payroll in New Hampshire follows the federal money on the job. Find the funding in your contract, then use this table.

Money on the jobWho receives and reviews the payrollWhat is specific here
Federal-aid highway or bridge contract let by NHDOTThe contracting agency, which is NHDOT on a state-let contract and the town on a Local Public Agency (LPA) project; NHDOT's Office of Federal Compliance reviews payrolls for compliance (2023 letter)Seven calendar days to correct deficiencies, per NHDOT's February 2023 letter (a third-party-hosted copy). Payrolls due within 14 days of week end under Form 14a (December 2024)
FAA-funded airport projectOn the Manchester airport bid documents, the FAA if it is a party to the contract, otherwise the sponsor, which sends them on (Manchester manual)Manchester manual: final payment waits on missing weekly payrolls
CDBG-funded projectThe grantee, under CDFA's manualPayroll due 7 to 11 working days after each period
State, county or town money with no federal fundsNo state agencyRSA chapter 280 is repealed

NHDOT federal-aid highway and bridge jobs

On a federal-aid contract that NHDOT lets, NHDOT is the contracting agency. Form FHWA-1273 (revised June 25, 2026), Section III, paragraph 3.b.(1), has certified payrolls go weekly to the contracting agency, with the prime contractor submitting all subcontractors' payrolls; the same weekly duty is in 29 CFR 5.5(a)(3)(ii). Section I, paragraph 3, says a breach of the provisions may be grounds for withholding progress payments or final payment, termination, or suspension or debarment. The payroll form itself is in our WH-347 guide.

On a municipal Local Public Agency (LPA) federal-aid project, the town is the owner. NHDOT's archived compliance page (snapshot of February 8, 2025) says the Resident Engineer or Town Representative uses OFC Form 3 to track on-site work and payroll receipt, while on state projects the NHDOT CA does, and Form 14a item 8 requires employees to sign in daily on LPA projects.

NHDOT payroll rules

NHDOT's Form 14a, Annual Contractor Assurances (OFC Form 14a, revised December 17, 2024, archived May 6, 2025) applies to subcontractors and prime contractors on NHDOT federal-aid contracts. For payrolls it says:

  • Payrolls are submitted to NHDOT no later than 14 calendar days from the end of the week (Saturday) in which work was performed (item A.i).
  • NHDOT may require a payroll Quality Control checklist with each submission from contractors that repeatedly submit incorrect or incomplete payrolls (A.ix).
  • Salaried forepersons and superintendents who work in a classification more than 20 percent of the workweek are shown on payrolls with all payroll information (A.vii).
  • Owners who work on site are on payrolls with the classification followed by "Owner" and their hours. Pay information and deductions are not required (A.viii).
  • Restitution cannot be reported on payrolls. It goes on OAOC Form 8 with supporting documentation (A.x).
  • New Hampshire based companies certify on OFC Form 14 that workers are correctly reported to NH Employment Security and pass its ABC test, RSA 282-A:9, III (item 6).
  • OFC directs compliance matters involving subcontractors to the prime contractor for resolution (item 9).

What NHDOT says it checks

The February 21, 2023 NHDOT letter, posted on the Newington-Dover project site, says:

  • The Office of Federal Compliance (OFC) monitors Davis-Bacon wage rates weekly. NHDOT's goal is to audit each project monthly and review its certified payrolls, with findings recorded in an OFC Field Audit Report.
  • A contractor found out of compliance gets seven calendar days to correct deficiencies and supply supporting documentation. Sanctions are imposed whenever a contractor fails to meet its obligations.
  • The compliance office interviews employees in every classification at each project about rates and fringe benefits, to check what the certified payrolls say.
  • OFC runs training and annual assurances programs for contractors, municipal officials, engineering firms and other state agencies on federally assisted contracts.
  • NHDOT includes a second wage determination when a secondary type of construction is at least 20 percent of project cost or at least $1 million.

What changed after the letter

The letter says NHDOT's subcontract documents require proof that Form FHWA-1273 is physically included in every subcontract. FHWA ended that federal requirement on June 10, 2026, and Section I, paragraph 1, of the June 2026 form leaves the choice to the contracting agency (see our FHWA-1273 2026 guide). Ask your prime which provisions your subcontract carries. The weekly payroll duty in Section III remains in the form.

What could not be read

The live dot.nh.gov and mm.nh.gov pages returned "Access Denied" to automated requests on November 4 and 6, 2026, so the NHDOT material here comes from archived copies.

That archived copy of NHDOT's Contractor Compliance Requirements, Forms and Tools page (snapshot of February 8, 2025) lists OFC Form 3 (payroll log), OFC Form 8 (restitution), OFC Form 11 (labor standards interview), OFC Form 18 (monthly prompt pay certification), SF 1444, the WH-347 and a guide to completing certified payrolls. It says the Resident Engineer or Town Representative uses the LPA version of Form 3 and the NHDOT CA uses the state version to track when payrolls have been received, that prompt pay certifications under Spec 109.09 are due to OFC by the 10th of each month, and that Form 8 originals no longer need to be mailed to OFC.

Airport projects

On an airport development project under an FAA grant agreement, 49 U.S.C. 47112(b) (2023 edition) requires a contract over $2,000 involving labor to require wage rates set by the Secretary of Labor. The City of Manchester Department of Aviation's February 2025 bid documents for rehabilitating Taxiways G and D at Manchester-Boston Regional Airport show how one New Hampshire sponsor handles payroll:

  • Clause A10, Davis-Bacon Requirements (page RCP-17 onward), sends weekly payrolls to the sponsor for transmission to the FAA when the FAA is not a party to the contract. The prime submits its subcontractors' payrolls, each with a Statement of Compliance.
  • General Conditions section 90-11 makes approval of final payment contingent on closeout items that include weekly payroll records not previously received from the general contractor and all subcontractors.

That is one sponsor's manual for one project, so read the one you signed. Withholding of contract payments has its own guide.

CDBG-funded projects: the CDFA rules

CDFA's manual sets how a CDBG grantee polices labor standards in New Hampshire. The grantee monitors them during construction, and the architect or engineer or the grant administrator can serve as its Labor Standards Officer (CDFA, labor standards compliance).

TopicWhat CDFA's manual says
When it appliesConstruction, alteration or repair over $2,000 financed in whole or in part with CDBG or other federal funds, whatever the CDBG share (CDFA, applicability)
Residential exemptionCDFA exempts rehabilitation or new construction of residential property with fewer than eight units with CDBG funds. 24 CFR 570.603 states the eight-unit line for rehabilitation only, so ask CDFA about new construction
Payroll timingThe contractor submits each certified payroll to the grantee within seven to eleven working days after the payroll period ends (CDFA 8-6)
Numbering(CDFA 8-6) The first payroll is marked Initial or 1, the last is marked Final, and one goes in for every consecutive week. A "No work" payroll covers a temporary break in the work, and a contractor that must be off site while the project continues can instead give the grant administrator a signed statement of the dates of no work
Interviews(CDFA 8-7) CDFA requires worker interviews periodically during each phase of construction on each project, recorded on HUD Form 11 (see our HUD Form 11 guide)
ApprenticesThe manual says New Hampshire's Department of Education and State Apprenticeship Advisory Council register apprenticeship programs, and the contractor gives the grantee the state registration and the apprentice's card (CDFA, pre-construction)

Payroll timing and numbering rules are in CDFA's certified payroll report requirements.

If the grantee finds an underpayment

The Labor Standards Officer notifies the prime in writing. The prime has 30 days to correct it, after which the grantee may withhold payment to cover restitution, which goes on a Correction Certified Payroll Report with a signed Statement of Compliance. CDFA tells the grantee to contact CDFA staff for assistance when an underpayment is $1,000 or more or willful falsification is found (CDFA, labor standards compliance).

HOME-assisted housing differs: the wage provisions apply to a construction contract covering 12 or more HOME-assisted units, and the participating jurisdiction collects certified weekly payrolls (24 CFR 92.354). For housing authorities, see our housing authority guide.

What to do when a payroll request arrives

  1. Identify the money. Check your contract for NHDOT federal-aid funds, an FAA grant, CDBG or another federal program. State Revolving Fund water and sewer work has its own guide.
  2. Ask who collects your payroll and when. On NHDOT and airport jobs the prime submits subcontractors' payrolls, so ask the prime when it needs yours. On CDBG jobs, ask the grantee.
  3. Read the wage determination. Note its number, date and type, and whether there is a second one.
  4. Match the crew to the payroll. Each worker's classification and hours should match what the worker would say in an interview.
  5. Request a missing classification. See our SF-1444 guide. On CDBG jobs, CDFA says the grant administrator submits the request to the Department of Labor.

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Does New Hampshire require certified payroll on state-funded projects?
Not under state law, because RSA chapter 280 was repealed in 1985. Certified payroll duties come from federal money on the job, such as federal-aid highway funds, an FAA grant or CDBG funds.
Where do I send payroll on an NHDOT federal-aid job?
The weekly payroll duty in 29 CFR 5.5 sends certified payrolls to the contracting agency, with the prime submitting all subcontractors' payrolls. NHDOT's Form 14a sets a deadline of 14 calendar days from the end of the work week. Ask the prime when it needs yours.
How long do I have to fix a problem NHDOT finds?
NHDOT's February 21, 2023 letter, a copy hosted on a town project site, says seven calendar days to correct deficiencies and supply supporting documentation.
What is the CDBG payroll deadline in New Hampshire?
CDFA's manual says seven to eleven working days after the payroll period ends.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. RSA chapter 280 gc.nh.gov
  2. RSA 228:4-b gc.nh.gov
  3. NH Community Development Finance Authority (CDFA) CDBG manual resources.nhcdfa.org
  4. NHDOT compliance letter dated February 21, 2023 newington-dover.com
  5. Manchester airport bid manual from February 2025 flymanchester.com
  6. 49 U.S.C. 47112(b) govinfo.gov
  7. Form 14a web.archive.org
  8. Title XXIII chapter list gc.nh.gov
  9. work certificate gc.nh.gov
  10. Form FHWA-1273 fhwa.dot.gov
  11. 29 CFR 5.5(a)(3)(ii) ecfr.gov
  12. archived compliance page web.archive.org
  13. CDFA, labor standards compliance resources.nhcdfa.org
  14. CDFA, applicability resources.nhcdfa.org
  15. 24 CFR 570.603 ecfr.gov
  16. CDFA, pre-construction resources.nhcdfa.org
  17. 24 CFR 92.354 ecfr.gov

Questions about your New Hampshire project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us