Roadway excavation prevailing wage in New York: who is covered and what PW 102 does

This page draws on DOL's December 1, 2023 enforcement guidance (25 questions and answers, effective September 15, 2023), the PW 102 form (edition 01/24) and the text of the second Labor Law 224-f. Labor Law text was read on a public.law copy that cites nysenate.gov, which blocked automated reading, so check the official text too.

Last reviewed against the sources it cites

The short answer

If a state, county or municipal permit lets a utility's contractor open or use a street, New York Labor Law 224-f (the second one, Workers on excavations) requires prevailing wages for that work. The statute requires a filed agreement before the permit issues, and PW 102 is DOL's form for it, signed by the utility. Direct utility employees are out. Flaggers, emergency work and permit-required work done without a permit are in.

  • The Workers on excavations section of Labor Law 224-f bars a permit for a covered excavation project until an agreement requiring prevailing wages has been contractually mandated and filed with the department of jurisdiction.
  • DOL's December 1, 2023 guidance says the law does not cover direct employees of a utility company, and that work on private property past the curb or right of way is not covered.
  • Under the same guidance (questions 9 and 10), work that required a permit is covered even if no permit was obtained, and work that did not require a permit is not covered.
  • The guidance (questions 21 and 22) says flaggers and traffic control workers at the permitted site are entitled to prevailing wage, and so is emergency work that would normally need a permit.
  • On form PW 102 (01/24) the utility affirms under penalty of perjury that its contract requires prevailing wages, and DOL says it is not a party to that agreement.
  • DOL's e-payroll FAQ sends payroll for roadway excavation on NYC permits to NYC's online database, and other covered payroll to the DOL portal.

Is street-opening work for a utility prevailing wage work in New York?

Yes, when a permit is involved. The statute defines a "covered excavation project" as construction work for which the state, a county or a municipality may issue a permit to a utility's contractor or subcontractor to use, excavate or open a street (Labor Law 224-f, subdivision 1). The same subdivision says a covered excavation project "shall exclude construction work for which a permit may be issued to a service provided as defined by subdivision twenty-three of Public Authorities Law ยง 1020-B." DOL's cover memo says the law specifically excludes the Long Island Power Authority. Each such contractor or subcontractor must pay not less than the prevailing rate in the locality to each laborer, worker or mechanic on the project, under sections 220 and 220-b.

New York has two sections numbered 224-f. This one, "Workers on excavations," is separate from the climate-risk and energy transition section, and DOL's guidance says so (guidance, page 1). The law is not general public work. Subdivision 3 says a covered excavation project is not otherwise public work under Article 8 just because of this section. For ordinary Article 8 payroll, see our New York certified payroll guide.

Which projects and utilities are covered

The guidance says the law took effect September 15, 2023. It applies to contracts solicited on or after that date, or, where there was no solicitation or contract, to work under a permit issued on or after it. Utility work covered is electric, gas, water, steam, sewer, fuel, geothermal, telephone and telegraph, and broadband or fiber optic internet. DOL added broadband after an earlier version of its FAQ said it was not covered.

SituationCovered?What DOL's guidance says
Contractor hired by a utility to open a street under a permitYesQuestions 11 and 12
Direct employees of the utilityNoCover memo
Work for the Long Island Power AuthorityNoCover memo; the statute's own exclusion is in subdivision 1
Cable television provider's own workNoCover memo, which says the Public Service Law definition of utility excludes cable television providers
Cable company that also does other covered utility work, using a contractor hired by a utilityYes, for that workQuestion 15
Homeowner hires and pays the contractor directly, even from a utility's approved listNoQuestions 16 and 17
Homeowner pays, but the utility hires and pays the contractorYes, for work in the street, curb, sidewalk and right of wayQuestion 18
Work on private property past the curb or right of wayNoQuestion 6
Work that needed a permit, but none was pulledYesQuestion 9
Work that did not need a permitNoQuestion 10

A homeowner's grant does not change the result: the guidance says the law applies if the utility hires and pays the contractor, and not if the private party does (question 19). On work adjacent to the street, the guidance adds that if project costs exceed $5 million and public funding is at least 30 percent of costs, Labor Law 224-a may apply (question 6, note c).

What work on the job counts

Question 4 says all utility work in, on or under the street is covered, as well as temporary closing and final patching. Boring entirely under the street is covered if a permit is needed to reach the street or the ground below it (question 5). Work in the adjacent curb, sidewalk, shoulder or right of way is covered if the permit was required (question 6).

Flaggers and traffic control

Flaggers and traffic control workers are entitled to prevailing wages if they work for a utility contractor at the site of work that required a permit (question 22).

Emergency work

Emergency work is covered if the contractor would need a permit to use, open or excavate the roadway in non-emergency conditions (question 21).

Older contracts

For an open-ended contract signed or solicited before September 15, 2023, a project already underway, or one with a permit already obtained or applied for, is not covered. A new location needing a new permit applied for on or after that date is covered (question 1). If the general contract was awarded before the effective date, the subcontracts follow it, unless the general contract was long-term or open ended, in which case question 1 applies (question 2).

What is PW 102 and who signs it?

PW 102, Agreement Confirming the Payment of Prevailing Wages, is issued by DOL's Bureau of Public Work and is headed "For Compliance with NYS Labor Law 224-f(2)". The utility company signs it, not the contractor. It says the signer should be a member of management who is responsible for and knowledgeable about the covered excavation project. It is not a payroll form. For how it sits next to the payroll rules, see the New York certified payroll page.

When it is submitted

The statute and the form set the timing: no permit shall be issued for a covered excavation project until the agreement is entered into and filed with the department of jurisdiction. Submit it to the department of the state, officer or board of the state or municipality that issues the permit to the utility or its contractors. Labor Law 224-f(2) requires an agreement confirming payment of prevailing wages, contractually mandated and filed with the department of jurisdiction, and PW 102 is DOL's form for that agreement.

What the form contains

Field on the formWhat goes there
Name, title, utility company, addressThe signing officer and the utility
Contractor name, type of work, locationThe contract the utility affirms it has entered into
Anticipated dates"On or about and between" two dates
Contract termPrinted text: laborers, workers and mechanics of the contractor and subcontractors are paid the prevailing rate and supplemental benefits under DOL's wage schedule for work subject to Article 8
PRC number boxesWhether a PRC number has been obtained from the Bureau, and the number if so
Wage schedule boxesWhether a copy of the prevailing wage schedule has been given to the contractor or included in the contract
Signature and dateAffirmation under penalty of perjury

The form's own footer says DOL does not confirm or endorse as true any statement on it, is not a party to the agreement or contract, and decides compliance case by case under the Bureau's standard investigation procedure. The PRC number is the prevailing rate case number. Per question 24 of the guidance, the entity letting a project applies to the Bureau for it. The form has a box for each case, number obtained or not yet obtained.

If you are the contractor, ask the utility for a copy of the signed PW 102 and the wage schedule. For a related form on state work, see New York form PW 51.

What the contractor doing the excavation owes

Wages

The prevailing rate for the trade in the locality, per statute. For which rates apply to which utility work, question 23 tells you to contact your nearest Bureau of Public Work district office.

Records

The guidance cover memo says contractors and subcontractors to a utility must always keep records of prevailing wage payments, not only when a local law or ordinance requires it as a permit condition. Question 25 says they must retain certified payrolls for six years. Subdivision 3 of the statute applies sections 220, 220-a, 220-b, 223 and 224-b and section 227 to enforcement, within the jurisdiction of the fiscal officer. The fiscal officer is the DOL Commissioner, except on a permit from a city with more than one million people, where it is the comptroller.

Where payroll goes

The December 2023 guidance predates the 2026 payroll portal, and it points three ways. Its cover memo says contractors and subcontractors submit certified payrolls to the department of jurisdiction under Article 8. Question 25 says to submit them to the contracting utility company within thirty days of the first payroll and every thirty days after. Labor Law 220-j(2) says covered-project records go directly to the fiscal officer, at least monthly and electronically, in the manner the commissioner prescribes on the department's website. Section 220-j(1)(d) names 224-f projects as a "covered project" without saying which 224-f, and DOL's public work registry page lists 224-f as including roadway excavations, so this rule reaches excavation work.

The portal governs from January 1, 2026. DOL's electronic payroll FAQ says certified payroll for roadway excavation projects with permits issued by NYC goes through NYC's online database for certified payroll, and payroll for other covered projects goes through DOL's portal. It requires payrolls for work completed in 2026 and later, not before. When read on November 4, 2026, NYC's Community Hiring home page showed a Coming Soon notice for the NYC database. Check your contract in case the utility wants copies more often.

Late payroll

Under Labor Law 220-j(3)(a), a contractor or subcontractor that fails to furnish records faces a penalty of $100 for each day in violation, and the fiscal officer may not assess it until the records are 14 days overdue. The FAQ says DOL is currently exercising discretion not to issue fines for late payrolls, and that it will announce publicly and email registered contractors before it starts. That statement is on the FAQ as fetched November 4, 2026, so check it again before you rely on it.

Statute and FAQ differ in a way worth knowing: Labor Law 220-j(5) speaks of NYC public work done by or on behalf of the city, while the FAQ extends the city database to roadway excavation on NYC permits. If your permit is from New York City, confirm with the permitting agency which database it expects. See the state-by-state table for the wider picture.

Questions

Do I need to be paid prevailing wage if the utility never pulled a permit?
Per DOL's guidance, yes if the work required a permit, because question 9 says the work is still covered. If no permit was needed, the law does not cover it.
Does the law cover my employees if I am a subcontractor to the utility's contractor?
The statute applies to each contractor or subcontractor to a utility company, and the guidance defines a utility contractor as a contractor hired by a company performing covered utility work (question 12). Ask the Bureau about your exact tier if the contract chain is long.
Is a utility's own crew covered?
No. The cover memo of the guidance says the law does not cover direct employees of a utility company.
Who signs PW 102, and can my company sign it?
The form is an affirmation by the utility company, signed by a member of its management. It names the contractor as the other party to the contract, and the contractor is not the signer.
Does DOL approve the PW 102 I file?
No. The form says DOL does not confirm or endorse the statements and is not a party to the agreement.
If I send payroll to the utility or the permitting agency, do I still submit to DOL?
Yes. DOL's electronic payroll FAQ says the statute requires submission of all certified payrolls for covered work to DOL's system, even if you also send them to other agencies or the department of jurisdiction.

We prepare certified payroll for public works contractors. Tell us about your project.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. December 1, 2023 enforcement guidance dol.ny.gov
  2. PW 102 form dol.ny.gov
  3. second Labor Law 224-f newyork.public.law
  4. e-payroll FAQ dol.ny.gov
  5. Bureau of Public Work district office dol.ny.gov
  6. Labor Law 220-j(2) newyork.public.law
  7. public work registry page dol.ny.gov
  8. Community Hiring home page nyc.gov

Questions about your project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us