Prevailing wage and off-site fabrication on California public works
Whether shop work for a public project is covered turns on Labor Code 1772 and on the Director's coverage decisions, which DIR lists in its public works coverage determinations index. This page reads the ones on shop fabrication and modular buildings.
Last reviewed against the sources it cites
The short answer
Usually not when the work is done in a permanent shop or plant that exists apart from the public project. DIR has ruled that way for a subcontractor's own shop and for a general-use modular factory. It has covered work done in a yard set up for the project, and installation at the site under the public contract is construction. Facts decide it, so check yours before you bid.
- Labor Code 1772 deems workers employed by contractors or subcontractors "in the execution of any contract for public work" to be employed upon public work, and that phrase is where the off-site question turns.
- In the 2010 appeal decision in PW 2007-008, the Director reversed a finding that a subcontractor's shop work on HVAC components was covered, because the shop was permanent and its location and continuance were decided without regard to the project.
- DIR's September 8, 2010 determination (PW 2009-052) states a three part material supplier test: sells to the general public, facility not established specially for the public contract, facility not at the work site.
- In PW 2007-009 (May 5, 2008), DIR found that manufacturing modular classrooms at a permanent, general-use facility was not subject to prevailing wage.
- DIR's appeal decision describes earlier determinations that covered fabrication at a temporary yard established for one project (PW 92-036 and PW 99-032).
- DIR's Public Works FAQ says coverage is not necessarily limited to work at the construction site, so a close case should be put to the awarding body or the Director.
The short answer
Work in a permanent shop or plant that exists apart from the public project has not been treated as covered in the decisions below. Work in a yard or site set up for the project has. Installing the finished product at the project under the public contract is construction, and it is covered; in PW 2014-041 (February 5, 2016) the Director reached the site work through the single integrated project reasoning. No statute states a general rule for shop work, so the answer comes from these decisions and the court cases they apply.
The rule: "in the execution of" the contract
Prevailing wage applies to public works, which Labor Code 1720(a)(1) defines as construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part out of public funds. Section 1774 requires the contractor and any subcontractor to pay prevailing rates to workers employed in the execution of the contract. Section 1772 deems those workers to be employed on public work. Section 1722.1 defines "contractor" and "subcontractor" to include a licensee or agent acting in that capacity on public works.
None of those sections mentions a shop. DIR's decisions fill the gap with a court of appeal case, Williams v. SnSands Corporation (2007) 156 Cal.App.4th 742, as quoted in PW 2007-009. It reads "execution" as the carrying out and completion of the contract's provisions, and it recognizes that bona fide material suppliers fall outside the law because their work is independent of the public contract.
DIR's Public Works FAQ adds a warning: coverage is not necessarily limited to work at the construction site or to traditional construction trades.
Three tests DIR has applied
| Situation | What DIR decided | Source |
|---|---|---|
| Permanent shop of a subcontractor that also installs on site, shop not set up for the project | Shop fabrication of ductwork and other HVAC components was not done in the execution of the contract. The Director reversed the earlier finding of coverage. | PW 2007-008, appeal decision, May 3, 2010 |
| Commercial supplier that sells to the general public, with permanent facilities away from the site | Fabricating concrete stem panel forms for Caltrans highway projects was not subject to prevailing wage. The suppliers were material suppliers. | PW 2009-052, September 8, 2010 |
| Permanent, general-use modular building factory | Off-site manufacture of modular classrooms for a school district was not subject to prevailing wage. | PW 2007-009, May 5, 2008 |
| Temporary yard or dedicated site set up for the project | Earlier determinations covered concrete panel fabrication at a yard set up for one project (PW 92-036) and portable classroom construction at a dedicated yard (PW 99-032). | Described in the PW 2007-008 appeal decision |
Test 1: the material supplier test
In PW 2009-052, DIR states that a company is an exempt material supplier if it (1) is in the business of selling supplies to the general public, (2) works at a facility not established specially for the particular public works contract, and (3) works at a facility not located at the site of the work. DIR rejected an argument that a back shop which sells nothing over the counter was a separate subcontractor. The shop was a permanent, off-site, general-use facility, and nothing showed it was set up for public work.
Test 2: the permanent shop of a subcontractor
The harder case is a subcontractor that fabricates in its own shop and does not sell to the public. The Director's 2010 appeal decision in PW 2007-008 says no California court had decided that question. It looked to the federal definition of the "site of the work" in 29 CFR 5.2, which leaves out the permanent fabrication plants of a contractor or subcontractor whose location and continuance in operation are decided wholly without regard to a particular project. DIR applied the older wording of that regulation. The current text keeps a material supplier's plant established for the project before bid opening out of the site of the work, even where its operations are dedicated exclusively, or nearly so, to the contract. It also now treats a secondary construction site as part of the site of the work: a site where an entire module of the building is constructed for specific use in that project, if the site is established specifically for the project or is dedicated exclusively, or nearly so, to it for weeks or more. We have not found DIR applying the amended text, so put a dedicated modular line to the awarding body or the Director. Applying the federal test, the Director held the shop work was not in the execution of the public contract. DIR's cover note on that decision states it was affirmed in a published court of appeal opinion, Sheet Metal Workers' International Association, Local 104 v. Duncan (2014) 229 Cal.App.4th 192. We could not read the opinion itself, so this page relies on DIR's note. The Williams v. SnSands and Duncan citations link only to DIR's PDFs, not the opinions.
Two limits matter. The Director described the reversed 2008 determination as limited to its facts, while the appeal decision itself applied the federal site-of-the-work test to a permanent shop whose location and operation did not depend on the project. Separately, DIR no longer designates coverage determinations as precedential (footnote 5 of the appeal decision), so each one is guidance, not a rule that binds a later case. The history also cuts the other way: footnote 6 of the appeal decision records 2003 determinations (PW 2000-027 and PW 2002-064) that covered permanent-shop work and were withdrawn on May 3, 2004.
Test 3: the dedicated yard
The 2010 appeal decision says that prevailing wage has been required for off-site work at a temporary site established specially for a public works project. If you lease or set up a yard or shop for one public contract and close it when the work ends, assume the work is covered and budget for it. Test 3 turns on a yard set up specially for the project, not on a facility that already existed.
Modular and prefabricated buildings
Two parts of a modular job get different answers.
- Factory work. In PW 2007-009, the manufacturer built the buildings at a permanent nine-acre plant that had sold to more than 1,000 customers, including medical clinics and retail companies. DIR held it was a material supplier and the factory work was not covered, even though the buildings were built to designs pre-approved by the Division of the State Architect. DIR contrasted its earlier ruling on classrooms assembled at a dedicated site that closed after the work.
- Work at the site. In the same case, a footnote says prevailing wages were paid for the on-site architectural upgrades; DIR did not hold them required. A 2016 DIR determination, PW 2014-041, treats installing modular classroom buildings as construction paid out of public funds, and it held Flory's site work was covered as part of a single, integrated public works project because the separate modular installation was paid in part with public funds (citing Oxbow). Section 1720(a)(1) also says "installation" includes assembling and disassembling freestanding and affixed modular office systems.
A worked example
This is an illustration, not a case from DIR's files. A mechanical subcontractor on a community college project fabricates ductwork in its permanent shop, which it has run for years for all of its customers. It then sends a crew to install the ductwork at the college.
- The shop hours track the PW 2007-008 facts: a permanent shop whose location and operation do not depend on this project. DIR's 2010 appeal decision treats that work as outside the contract's execution.
- The installation hours are construction under section 1720(a)(1). Prevailing wage and certified payroll apply to them.
- If the same subcontractor rented a yard for the project and closed it afterward, the PW 92-036 and PW 99-032 reasoning points the other way for the yard hours.
Checklist before you bid
- Is the shop permanent? Was it running before this project and will it keep running after?
- Does the project decide its location or operation? A site chosen or opened for this contract points to coverage.
- Do you sell what the shop makes to the general public? If yes, test 1 applies.
- Is any work done at the project site? Installation, assembly and connection work there is covered when it is under the public contract. Site work under a separate contract was reached in PW 2014-041 only because it was paid at least in part with public funds and was part of one integrated project with a publicly funded install.
- Read the contract. Many awarding bodies write their own prevailing wage language into the contract and flow it down to subcontractors. See our flow-down clause guide.
- Keep the records. Separate shop hours from site hours on time records, and keep proof of the shop's history and customers.
What to do next
If you are unsure, do two things before the work starts. Ask the awarding body for its position in writing. Then, if the stakes justify it, ask the Director for a ruling under 8 CCR 16001 (the Director's rulings in PW 2007-009 and PW 2009-052 each say they were made under section 16001(a)); our coverage determination guide walks through the request. Our supplier and delivery guide covers drivers and installing suppliers.
If your shop work is covered, or you get an assessment over it, talk to an attorney about representation. Covered hours go on the certified payroll with the correct classification. WellStanding prepares the WH-347 and the eCPR from the payroll export you already run, and a person reviews every filing. You review the finished filing and sign the certification in one step, and nothing is filed until you have signed; we never sign for you.
Questions
Is off-site fabrication always exempt from California prevailing wage?
Does it matter that I am a licensed contractor with an on-site subcontract?
Is prefabricated or modular work covered?
Can I rely on these decisions as binding?
Where do I find newer DIR decisions?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- Labor Code 1772 leginfo.legislature.ca.gov
- public works coverage determinations index dir.ca.gov
- PW 2007-008 dir.ca.gov
- September 8, 2010 determination dir.ca.gov
- PW 2007-009 dir.ca.gov
- Public Works FAQ dir.ca.gov
- PW 2014-041 dir.ca.gov
- Labor Code 1720(a)(1) leginfo.legislature.ca.gov
- Section 1774 leginfo.legislature.ca.gov
- Section 1722.1 leginfo.legislature.ca.gov
- 29 CFR 5.2 ecfr.gov
- 8 CCR 16001 law.cornell.edu