How to get a DIR coverage determination on a California project
A coverage determination is the Director of Industrial Relations' written answer on whether a project or type of work is public work. The rules are in 8 CCR 16001 and Labor Code 1773.5 (in DIR's California Prevailing Wage Laws compilation, revised February 1, 2025), and past answers are on DIR's coverage determinations page.
Last reviewed against the sources it cites
The short answer
File a written request with the Director of Industrial Relations under 8 CCR 16001(a)(1). Interested parties can file: contractors likely to bid on or perform the work, workers who may be employed on it, and awarding bodies concerned with the contract. Labor Code 1773.5(b) sets a 60 day decision clock for political subdivision projects and 120 days for private developments with public funds. You can appeal within 30 days.
- Under 8 CCR 16001(a)(1), an interested party can ask the Director for a coverage ruling on a specific project or a type of work.
- Labor Code 1773.5(b) sets 60 days for a political subdivision project and 120 days for an otherwise private development project that receives public funds.
- Under 8 CCR 16002.5(a), a notice of appeal must be served within 30 days of the coverage determination.
- Labor Code 1741.1(a) pauses the period for serving a wage assessment while the Director decides whether a project is public work, appeal included.
- DIR's coverage determinations page lists past determinations by year and by keyword, and says each one is advice current only as of its issue date.
Do you need a determination, or a faster answer?
A determination is a formal request to the Director. Any interested party can ask about a project or type of work it believes may be subject to or excluded from coverage. If you only need to know whether public money or a government lease is involved, start with our guide on whether your project is public works and the small project thresholds. That guide covers the Labor Code 1720 tests. This page covers the request itself. For unpaid workers, see does prevailing wage apply to volunteers.
Search past determinations first. A similar fact pattern may already be answered.
Who can ask
Under 8 CCR 16001(a)(1), any interested party named in 8 CCR 16000 can file. Section 16000 lists three groups:
| Group | Who is included |
|---|---|
| Contractors | Contractors and subcontractors, or their associations or representatives, likely to bid on or perform the contract |
| Workers | Workers in the craft who may be employed on the project, their labor organization, or other representative |
| Awarding bodies | Awarding bodies, or their associations or representatives, concerned with the contract or proposed contract |
The request can cover a specific project or a type of work that the party believes may be covered or excluded. Section 16000 words these groups by reference to a particular prevailing wage determination, and section 16001 points to them for coverage requests. DIR's contact page for coverage questions is on its Decisions and Determinations page, which gives pwcoverage@dir.ca.gov. For survey crews, see land surveying and prevailing wage.
How to file, step by step
- Write the request. Name the project or the type of work, the awarding body, the contract, and the facts that decide coverage: who pays, any loan, fee waiver, land transfer or lease, and the dates. Section 16001(a)(1) requires a request and lists no required content for it.
- Send it to the Director. Section 16001(a)(1) says to file with the Director or the Director's authorized representative. Section 16301 says a new or unresolved coverage issue other than of a routine nature may be referred to the Chief of DLSR as the Director's duly authorized representative.
- Serve the awarding body. If you are not the awarding body, you must serve it a copy of your request. Section 16001(a)(1) points to the filing procedures in 8 CCR 16302(d), which says to file a copy with the awarding body concurrently with the original or within two days after, excluding weekends and holidays. The petitioner must also file an affidavit of that filing with the Chief of DLSR no later than five days after filing the original, excluding Saturdays, Sundays and holidays. The Director may waive this requirement upon receipt of written confirmation, including a copy of the petitioner's notification to the awarding body. Labor Code 1773.5(b) separately gives a non-political-subdivision requester 15 days to serve. The two do not match, so serve at the time you file.
- Expect a response from the awarding body. Under section 16001(a)(2) it has 15 days after receiving the copy to send the Director any documents or arguments it wants considered. Labor Code 1773.5(b) gives a political subdivision 30 days to state its position.
- Hand over what you hold. Under section 16001(a)(3), every party must keep supplying relevant documents until a determination is made. If a party holds a document and refuses to release it, DIR may treat it as adverse to that party and close the record on that inference.
How long the Director has
Labor Code 1773.5(b) sets the clocks. They run from receipt of the last notice of support or opposition from any interested party that was not unreasonably delayed, as the Director decides, not from the date you file. For inspection and testing roles, see special inspector and construction inspector prevailing wage.
| Kind of request | Decision deadline | Extension |
|---|---|---|
| Project or type of work awarded or undertaken by a political subdivision | 60 days | Up to 60 more days if the Director certifies the reasons in writing to the requester and any interested party |
| Otherwise private development project receiving public funds under section 1720(b) | 120 days | None stated in section 1773.5(b) |
Section 1773.5(b) sets these two clocks.
If you disagree with the answer
A determination can be appealed. The rule is 8 CCR 16002.5. For low voltage and fire alarm technicians, see fire alarm and low voltage technician prevailing wage.
- Serve the notice of appeal within 30 days of the determination, and give written notice to the awarding body and any other identifiable parties.
- State the full factual and legal grounds, and say whether you want a hearing. The Director decides whether to hold one, and makes the final decision.
- Labor Code 1773.5(c) gives the Director 120 days after the last notice of support or opposition on the appeal, plus up to 60 more with written reasons.
- A final decision on appeal is subject to judicial review under Code of Civil Procedure section 1085, per section 16002.5(c) and Labor Code 1773.5. Talk to an attorney about that step.
How a request affects assessment and lawsuit deadlines
Labor Code 1741.1(a) pauses the period for serving a wage assessment for the time the Director needs to decide whether a project is public work, appeal included. The same section applies the pause to the time for a joint labor-management committee to sue under section 1771.2. The pause applies to the time to serve an assessment or to sue, so it matters before either happens. An assessment already served has its own response clock, which our guide to the Civil Wage and Penalty Assessment covers. Ask an attorney whether a request helps your case. For design professionals on design build work, see prevailing wage for design build architects and engineers.
How to use the decisions database
DIR's public works coverage determinations page holds the letters, listed by year from 2006 and by keyword index. The index covers terms such as fee waiver, grant, force account, and gift of land. A full text search is linked from the same page. For suppliers and delivery drivers, see does prevailing wage apply to material suppliers and delivery.
- Pick the keyword that matches your facts, such as the type of public help you received.
- Open the PDF and check its date. DIR says each determination is advice current only as of the date issued.
- Check whether a decision on administrative appeal followed. The list marks them.
- Compare the facts, not the project type. A letter is directed to specific individuals or entities.
A determination is not binding precedent. A September 6, 2007 DIR notice says DIR stopped designating coverage determinations as precedential and that they should be treated as advice letters. DIR's page adds that where a letter conflicts with a statute, regulation or court decision, the statute, regulation or case law controls.
If the answer is that it is public works
See our guides on finding a DIR Project ID, contractor registration, and California certified payroll. The is-my-project guide explains the Labor Code 1720 tests the Director applies.
WellStanding prepares the WH-347 and the eCPR from the payroll export you already run, and a person reviews every filing. You review the finished filing and sign the certification in one step, and nothing is filed until you have signed; we never sign for you.
Questions
Can a subcontractor ask for a coverage determination?
Is a coverage determination binding on other projects?
Does a request stop a wage assessment?
What if a party will not give DIR its documents?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- 8 CCR 16001 dir.ca.gov
- Labor Code 1773.5 dir.ca.gov
- DIR's coverage determinations page dir.ca.gov
- 8 CCR 16002.5 dir.ca.gov
- 8 CCR 16000 dir.ca.gov
- Decisions and Determinations page dir.ca.gov
- Section 16301 dir.ca.gov
- 8 CCR 16302(d) dir.ca.gov
- September 6, 2007 DIR notice dir.ca.gov