State Revolving Fund certified payroll: where it goes and who collects it
This page covers weekly certified payroll on water and wastewater projects financed by a Clean Water or Drinking Water State Revolving Fund (SRF) loan. The sources are EPA's 2024 Davis-Bacon FAQ, its contract clause for contractors, 29 CFR 5.5, and four state programs' own forms and guidance.
Last reviewed against the sources it cites
The short answer
Weekly certified payrolls go to the contracting agency, which on a State Revolving Fund job is the borrower or recipient that hired the prime. Subcontractors send theirs to the prime, and the prime sends everything up. Davis-Bacon covers the SRF-financed project for contracts over $2,000, and states often set a due day (Texas, California and DC do; Oklahoma's form does not).
- In 33 U.S.C. 1382(b)(6), a State assures that Clean Water SRF treatment works will meet the requirements of, or otherwise be treated (as the Governor determines) under, sections 1371(c)(1) and 1372 in the same manner as works funded under subchapter II, and federal law applies Davis-Bacon to any construction project carried out in whole or in part with Drinking Water SRF assistance (42 U.S.C. 300j-12(a)(5)).
- EPA's contractor clause calls the non-federal entity that signs your contract the contracting agency, borrowers included, and its paragraph (a)(3)(ii)(A) sends the weekly certified payroll to that agency; the federal baseline in 29 CFR 5.5(a)(3)(ii)(A) names the federal agency or the owner or sponsor that keeps the records.
- EPA's 2024 FAQ says certified payrolls are typically submitted weekly to the contracting agency or recipient overseeing the project, and that the rule is weekly, not biweekly (EPA FAQ, A10 and A41).
- Texas and California both set delivery at 7 days after the regular payment date of the payroll period (TWDB DB-0156, part IV.6; California State Water Board).
- Oklahoma's Drinking Water SRF form DW-075 is completed by the owner and submitted with each pay request, and its first item confirms the owner holds the contractor's WH-347 and signed certification for every week (DW-075, Rev. 12/4/2023).
- EPA says Davis-Bacon applies to customer-side lead service line replacement on private property when the overall project has Drinking Water SRF funding (EPA requirements summary, Davis-Bacon section dated November 12, 2024).
Where do my SRF certified payrolls go?
To the contracting agency. EPA's contract clause for contractors defines contracting agencies as the non-federal entities that enter into contracts with contractors, and says they can be grant recipients or subrecipients at any tier, borrowers included. In paragraph (a)(3)(ii)(A) of that clause, you send certified payrolls for each week with covered work to the contracting agency. The federal baseline, 29 CFR 5.5(a)(3)(ii)(A), says payrolls go to the federal agency if it is a party to the contract. If it is not, they go to the applicant, sponsor, owner or other entity that keeps the records, for transmission to the agency. The same paragraph makes the prime responsible for submitting all subcontractor payrolls.
EPA's FAQ (A41) says the same: payrolls are typically submitted weekly to the contracting agency or recipient overseeing the project, and EPA may ask for copies in compliance reviews. A subcontractor sends its payroll to the prime each week, and the prime sends all payrolls up (EPA's March 2024 presentation). Under 29 CFR 5.5(a)(3)(ii)(A), a contracting agency or the prime contractor may permit or require an electronic system if three conditions hold: it requires a legally valid electronic signature; it lets the contractor, the contracting agency and the Department of Labor access the payrolls on request for at least 3 years after the prime contract work is completed; and the agency or prime allows other methods when you cannot use or access the system.
EPA's FAQ and presentation name no federal portal for SRF payrolls. The state program and the borrower set the channel, so the table below differs by state. For the form, see our WH-347 guide. The WH-347 is optional, and 29 CFR 5.5(a)(3)(ii)(B) allows other formats.
Does Davis-Bacon cover the whole SRF project?
It covers the project the SRF money helps build, whether the loan pays for all of it or part. On the Clean Water side, 33 U.S.C. 1382(b)(6) is an assurance a State gives for its capitalization grant: treatment works built in whole or in part with SRF assistance will meet the requirements of, or otherwise be treated (as the Governor determines) under, section 1372 in the same manner as works funded under subchapter II. Section 1372 requires wages at the prevailing rates the Secretary of Labor sets under the Davis-Bacon provisions of title 40. On the Drinking Water side, 42 U.S.C. 300j-12(a)(5) applies section 300j-9(e) to any construction project carried out wholly or partly with SRF assistance. Texas's DB-0156 (Rev. 6/24, part I) states the same split.
EPA's subrecipient terms, last updated August 25, 2026, apply to loan recipients on contracts over $2,000. EPA's FAQ (A23), answering for EPA-funded construction generally, says Davis-Bacon requirements generally apply to the entire project when federal money is combined with other money. California's State Water Board says compliance is required for all construction financed by the assistance agreement, through completion (page updated January 22, 2026).
The FAQ (A42) says applicability is generally stated in the grant agreement, so ask the borrower what its loan terms say. A9 says the absence of a mention in the grant agreement does not necessarily exempt a project.
Clean Water work that is not treatment works
EPA's procedures implementing its Fiscal Year 2012 appropriations act (item 4.2-6c, a 2012 guideline that predates the 2014 amendment to the statute above) say that, for the purposes of the CWSRF, decentralized systems are considered section 319 projects and Davis-Bacon does not apply. EPA's 2024 FAQ (A5) is the later EPA statement and says septic installation could be treatment work if it is public works construction, alteration or repair. For septic, decentralized or nonpoint work, get the borrower's written answer before your first payroll.
Lead service line replacement
EPA's program-specific requirements summary, in a Davis-Bacon section dated November 12, 2024, says Davis-Bacon applies to lead service line replacement on private property, and to customer-side replacement, when the overall project is receiving Drinking Water SRF funding. It sets the line at contracts over $2,000, and says a sole proprietor or partner who works and qualifies as management under 29 CFR 541.102, such as an individual plumber, does not have to pay themselves Davis-Bacon wages. If a city hires you for service line work with SRF money, expect weekly certified payroll for your employees.
How four state programs handle it
The federal clause says weekly and gives no day count, so the 7-day counts in Texas and California are state wording. States and borrowers add the channel, the due day and their own forms. Yours may differ, so get the current program document from the borrower.
| Program and source | Who collects | When | Form and extras |
|---|---|---|---|
| Texas, TWDB: DB-0156 and DB-0155 (both Rev. 6/24) | The prime sends all payrolls to the contracting officer. The owner and TWDB are both listed as reviewers, and the owner spot-checks payrolls. | Within 7 days after the regular payment date of the payroll period. | WH-347 with its reverse-side statement, or your own payroll form plus the DB-0155 Statement of Compliance, which asks for the estimate number and TWDB SRF project number. The owner certifies to TWDB monthly. |
| Oklahoma Drinking Water SRF: DW-075 (Rev. 12/4/2023) | The owner (the water system), which completes DW-075. | Submitted with each pay request. The form sets no day count for your payroll. | The owner confirms it holds the WH-347 and signed certification for all weeks, interviews and postings are done, and fringe contributions were made (cash weekly, plans quarterly). |
| California: State Water Board page (updated January 22, 2026) | The recipient, which compares payrolls to the wage determinations and runs the SF-1445 interviews. | Weekly, within 7 days after the regular payment date of the payroll period. | Apprentices must be registered in a program recognized by the US Department of Labor, because the page says California's DIR and Apprenticeship Council are no longer recognized by DOL. |
| District of Columbia: DOEE SRF guidance (undated) | The funding recipient and/or DOEE's Clean Water Construction (CWC) staff. | Weekly, within a week after payroll distribution. | The certification statement on the payroll must be signed. DOEE's grant program page says one week after the close of the pay period for its construction grant jobs. |
Texas's DB-0156 part IV.6 says 7 days after the regular payment date, but the contract clause it inserts in its appendices says only "submit weekly". Meet whichever date is earlier. Oklahoma's DW-075 names the WH-347 even though the federal clause allows other formats, so ask the owner before you use another form. For DC, DOEE's Clean Water Construction program page says the program is funded from the Clean Water SRF. The SRF checklist counts the week from payroll distribution, and the contractor page counts it from the close of the pay period. No DOEE source reconciles the two, so ask DOEE CWC staff which applies to your award and align with our DC guide. A California SRF job carries federal and state wage rules at once, as our federal versus state comparison explains. The state-by-state table covers other states.
What happens when a payroll is missing?
The clause at 29 CFR 5.5(a)(3)(iv)(B) says that if a contractor fails to submit required records, the federal agency may, after written notice to the contractor, sponsor, applicant, owner or other entity that keeps the records, cause the suspension of any further payment, advance or guarantee of funds. The same paragraph says failing to submit required records on request may be grounds for debarment. Texas's DB-0156 repeats the federal suspension and debarment language and carries the withholding clauses in its appendices. Oklahoma's DW-075 has the owner confirm it holds your WH-347 for every week, with a line for exceptions or deviations. No source read for this page states a penalty specific to a late payroll.
For back wages withheld from your payments, see our withholding guide. For the debarment rule, see our debarment guide.
Your first SRF payroll
- Ask the borrower who collects. Get the due day and whether it takes email or a system.
- Read your contract. EPA's presentation says the contracting agency must put wage determinations in bid documents and contracts. Check yours has one and your classifications match it.
- Send one payroll for each week with work. Use the WH-347 or the program's form. A subcontractor sends it to the prime, and the prime sends all payrolls to the borrower.
- Keep the payrolls. Under 29 CFR 5.5(a)(3)(ii)(G) you keep certified payrolls for 3 years after all work on the prime contract is completed.
We prepare certified payroll for public works contractors. Tell us about your project.
Questions
Does EPA collect SRF certified payrolls?
Can I send payroll every two weeks?
My contract never mentioned Davis-Bacon. Am I exempt?
Which rate applies if my state has its own prevailing wage?
Who interviews my workers?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- 2024 Davis-Bacon FAQ epa.gov
- contract clause for contractors epa.gov
- 29 CFR 5.5 ecfr.gov
- 33 U.S.C. 1382(b)(6) govinfo.gov
- 42 U.S.C. 300j-12(a)(5) govinfo.gov
- TWDB DB-0156, part IV.6 twdb.texas.gov
- California State Water Board waterboards.ca.gov
- DW-075, Rev. 12/4/2023 oklahoma.gov
- EPA requirements summary, Davis-Bacon section dated November 12, 2024 epa.gov
- EPA's March 2024 presentation epa.gov
- section 1372 govinfo.gov
- section 300j-9(e) govinfo.gov
- subrecipient terms epa.gov
- procedures implementing its Fiscal Year 2012 appropriations act epa.gov
- DB-0155 twdb.texas.gov
- DOEE SRF guidance doee.dc.gov
- grant program page doee.dc.gov
- Clean Water Construction program page doee.dc.gov