Does Tennessee require certified payroll?
The sources are the Prevailing Wage Act for State Highway Construction Projects (agency copy of the 2014 text), the Commission's rules (revised July 2019), Public Chapter 1042 of 2026 and the Labor Department's prevailing wage page.
Last reviewed against the sources it cites
The short answer
Yes, on state highway, road and bridge construction. Commission Rule .05 requires the state contract to carry a clause that has every contractor and subcontractor send certified payrolls weekly to the contracting state agency, which passes them to the Prevailing Wage Commission. A 2026 law extended the state's wage policy to non-state-contract public highway projects funded with state or federal highway money. No state payroll duty was found for buildings, schools or utilities.
- Rule 0800-03-02-.05(1)(a)5 requires a state highway construction contract to carry a provision under which every contractor and subcontractor submits a copy of all payrolls weekly to the contracting state agency, which must promptly send them to the Commission (Commission rules, revised July 2019).
- The Act's definitions cover work on streets, highways or bridges; none of the sources read extends the state payroll duty to stand-alone building, school or utility projects (Tenn. Code 12-4-402, agency copy dated 2014).
- Public Chapter 1042, signed May 21, 2026, states the policy that the prevailing rate be paid on non-state-contract construction projects on public highways funded in whole or in part with federal or state highway funds, for contracts entered into, amended or renewed on or after that date (Public Chapter 1042; bill page).
- Commission rates run January 1 to December 31 each year, and the rates in effect ten days before bids are received go into the bid specifications and the awarded contract (Rules .03 and .04).
- The Act's remedy for a breach runs through the bond: the Commission or an affected employee may sue on the performance bond, and the awarding agency may advertise and relet the work (Tenn. Code 12-4-412).
- A Department of Labor state table lists Tennessee at $50,000 for highway work, but the Act and the Commission's rules state no dollar figure (DOL table, archived January 4, 2025).
Yes, on state highway, road and bridge work
Tennessee's state prevailing wage law is the Act, Tenn. Code 12-4-401 to 12-4-415, and it covers highway construction. A highway contractor is any contractor or subcontractor engaged in a state construction project to build, rebuild, locate, relocate or repair streets, highways or bridges (section 12-4-402). The Commission's rules, chapter 0800-03-02, add that a public highway is any street, road, highway, expressway, bridge or viaduct that the state or a municipality or other political subdivision builds or maintains and that federal or state highway funds pay for in whole or in part (Rule .01(1)(g)).
| Job | State payroll duty |
|---|---|
| A state agency contract, TDOT included, for street, road, highway or bridge construction or repair | Yes. Weekly certified payrolls go to the contracting state agency (Rule .05). |
| A public highway project funded with state or federal highway money under a contract that is not with the state, such as a city or county letting | State policy now says the prevailing rate is paid, for contracts entered into, amended or renewed on or after May 21, 2026. Rule .03 (July 2019) bars a municipality, county or other political subdivision from letting a state highway construction project contract that ignores the Commission's rates. Rule .01(2) says the Department cannot enforce rates that an entity outside the rules' definitions chooses to include. See "What the new law leaves open" below. |
| Buildings, schools and utilities | None found. The Act's definitions stop at streets, highways and bridges. A Department of Labor state table, archived January 4, 2025, lists Tennessee at $50,000 for highway work, a figure the Act and rules do not state, and no prevailing wage on non-highway construction. |
For federal terms in a contract, see the WH-347 guide and the state-by-state table.
Dates of the sources. The agency's copy of the Act dates from 2014 and omits the 2026 changes, and the Commission's rules are the July 2019 revision. Section 12-4-402 has been renumbered since the 2014 copy, so subdivision pinpoints may differ in the current Code. Both define "state contract" as an agreement "written or oral" (Rule .01(1)(e)).
What the rules require of every contractor and subcontractor
Rule .05(1) requires every state highway construction project contract between the contracting state agency and the highway contractor to carry a provision requiring the contractor and all subcontractors to pay the prevailing wage, and to include the terms below (Rule .05(1)(a)).
- Classify covered workers by the Commission's schedule of 25 classifications, and post the rates at the site (Rules .02 and .05(1)(a)1 and 2; section 12-4-410).
- Pay overtime as applicable law or the contract requires, and make only deductions authorized by law (Rule .05(1)(a)3 and 4; the federal list is in Copeland Act deductions).
- Submit a copy of all payrolls weekly to the contracting state agency, with a certification. The agency promptly sends them to the Commission (Rule .05(1)(a)5).
- Keep records open to the agency, the Commission and the Department (Rule .05(1)(a)5).
Two related duties come from the definitions in Rule .01, not the .05 clause. Under Rule .01(1)(a), the state agency contracting officer requires evidence of an apprentice's indenture or apprenticeship registration when the apprentice's name first appears on a submitted payroll; apprentices are persons registered individually under a bona fide program registered with the Bureau of Apprenticeship and Training of the U.S. Department of Labor (federal test: apprentices and trainees). Under Rule .01(1)(d), a materialman is treated as a subcontractor if its employees do substantial operations at the project site and spend as much as 20 percent of their work time there (hauling: site of the work and truck drivers).
The certification
You certify that the payrolls are correct and complete, that the rates paid equal or exceed the Commission's, and that each worker's classification conforms with the work performed (Rule .05(1)(a)5). The rule names no form, so the agency sets the format (section 12-4-411(a)). On TDOT contracts that is AASHTOWare CRL: see our AASHTOWare guide and TDOT's payroll FAQ, revised July 23, 2026. See also what a false certified payroll costs.
After you send it
The Department checks payrolls, interviews workers on site about classification and unpaid wages, and checks the posting (Rule .07).
What changed on May 21, 2026
Public Chapter 1042 was signed May 21, 2026, per the General Assembly's bill page. Section 1 narrows the definition of "state contract" to "any contractual written agreement" with the state for work on a state highway construction project, and drops "or oral". Section 2 changes the policy in section 12-4-403(a): the prevailing rate is to be paid on all state highway construction projects and on all non-state-contract construction projects on public highways funded in whole or in part with federal or state highway funds.
What the new law leaves open
In the 2014 copy of the Act, the pay duty in 12-4-403(b) still speaks of a contractor entering a state contract, and Rule .05 runs the payroll step between the contractor and the contracting state agency. Neither says who collects weekly payrolls on a local letting. Ask the letting agency in writing, read the wage schedule in your contract, and reach the Labor Standards Unit through the Department's prevailing wage page.
Which wage rate applies
The Commission sets rates each year from payroll data that contractors choose to submit, and the state counts as one statewide area (section 12-4-405). The Department's 2026 highway rates give one hourly rate for each of the 25 classifications. Under Rule .04, bid specifications carry the rates in effect ten days before bids are received, and the same rates become part of the contract awarded on the bid. Rule .03 gives the rate year as January 1 to December 31, so follow the wage schedule in your contract.
If you underpaid a worker
Pay the employee the corrective amount that meets the minimum wage scale for the classification and document it within AASHTOWare, as TDOT's payroll FAQ requires. The steps are on our AASHTOWare guide.
What happens if you do not comply
- On a contract a state agency awards, the bond must cover each requirement of the Act (section 12-4-409). The Commission or any employee whose wages are set under the Act may sue for breach of a condition of the performance bond, and the state agency that awarded the contract may advertise and relet the work (section 12-4-412; Rule .05(1)(a)8).
- Payroll records may not be destroyed for one year after the project is complete (section 12-4-411(b)).
How the state act differs from the federal clause
Section III of Form FHWA-1273 (revised June 25, 2026) applies Davis-Bacon to Federal-aid construction projects over $2,000, and excludes roadways classified as local roads or rural minor collectors unless applicable law requires the project to be treated as a Federal-aid highway (see our FHWA-1273 guide). The federal clause turns on Federal-aid status. Rule .01(1)(g) and (h) of the Commission's rules turn on state or federal highway funding, while the Department's prevailing wage page describes the Act as covering state-funded highway projects. The wage schedule in your contract carries the rates you must pay (section 12-4-408; Rule .04). Where both apply:
| Topic | Tennessee | Federal (29 CFR 5.5) |
|---|---|---|
| Rate source | Commission's annual statewide rate for each Rule .02 classification | Wage determination attached to the contract ((a)(1)(i)) |
| Weekly payroll goes to | Contracting state agency, then the Commission | The federal agency if a party, otherwise the owner or entity keeping the records ((a)(3)(ii)(A)) |
| Records kept | One year after completion | At least 3 years after all work on the prime contract ((a)(3)(i)(A)) |
The survey and the Commission
Under Rule .08, each contractor reports its own survey data, "No other contractor may submit data on behalf of a subcontractor." The data covers July to September and must be postmarked by October 31 and received by the third state business day after it.
We prepare certified payroll for public works contractors. Tell us about your project.
Questions
Does Tennessee require certified payroll on every public project?
Is there a dollar threshold in Tennessee?
Who receives a Tennessee certified payroll?
Does the 2026 law change anything for county and city road jobs?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- Prevailing Wage Act for State Highway Construction Projects tn.gov
- Commission's rules tn.gov
- Public Chapter 1042 publications.tnsosfiles.com
- Labor Department's prevailing wage page tn.gov
- bill page wapp.capitol.tn.gov
- DOL table, archived January 4, 2025 web.archive.org
- payroll FAQ tn.gov
- Form FHWA-1273 fhwa.dot.gov
- 29 CFR 5.5 ecfr.gov