UDOT certified payroll: eComply, work start dates and the SF-1444 route

This page reads UDOT's Contractor Resources page, the UDOT Certified Payroll System Contractor Manual (undated; it describes the December 2024 cutover), and UDOT's Civil Rights Manual of Instruction for Contractors (revised July 2021).

Last reviewed against the sources it cites

The short answer

On a federally funded UDOT contract with a notice to proceed on or after December 1, 2024, the prime and every sub working on site enter certified payroll weekly in eComply at udot.ecomply.us. Earlier projects stay in Project Explorer until they finish. The prime sets each sub's work start date, and eComply uses it for late payroll notices.

  • UDOT's contractor manual says eComply replaced Project Explorer for projects with a notice to proceed on or after December 1, 2024, and older projects stay in Project Explorer until completion (see the UDOT manual).
  • A subcontractor appears in eComply only after the subcontract is approved in MasterWorks, and the prime enters the sub's work start date, which eComply uses for late payroll notifications (UDOT manual).
  • UDOT's July 2021 Civil Rights manual gives two triggers for the seven-day payroll deadline, the end of the pay period and the pay date, and posts a $50 disincentive per late payroll, so confirm which one your contract uses (Civil Rights Manual of Instruction).
  • For an additional classification, the prime signs box 15 of the SF-1444 and emails it to UDOT, which forwards it to the Department of Labor, and the manual says an answer may take 30 to 60 days (UDOT manual).
  • Utah Code 34-30-14(2)(a) says public bodies may not require a predetermined wage rate unless state or federal law requires it, and (2)(b) says that does not apply when federal law requires prevailing or minimum wages on federally funded projects (Utah Code 34-30-14).

Where do you enter UDOT certified payroll?

On federally funded UDOT work, it depends on the notice to proceed (NTP) date. The contractor manual says eComply is the certified payroll system for every project with an NTP on or after December 1, 2024, and that it replaced Project Explorer. Projects with an earlier NTP keep using Project Explorer until the project is complete.

eComply for UDOT has its own address, udot.ecomply.us, and the manual says your username is your email address. Our eComply guide covers password resets, roles and why eComply sends a payroll back. This page covers only what is specific to UDOT.

NTP dateSystemSource
December 1, 2024 or latereComplyUDOT manual
Before December 1, 2024Project Explorer, until project completionUDOT manual

Who enters what, and when?

The manual says federally funded UDOT projects require every prime and every subcontractor that works onsite to enter payroll weekly. The prime starts when its onsite work starts. A sub starts when it begins physically working on site for that project. Utah Code 34-30-14(2)(a) bars public bodies from requiring set wages or benefits unless federal or state law requires them: it says the state or a political subdivision may not require a contractor to pay a predetermined wage rate or a type, amount or rate of benefits, except as provided in (2)(b) or as required by federal or state law. Subsection (2)(b) says (2)(a) does not apply when federal law requires the payment of prevailing or minimum wages on projects funded in whole or in part by federal funds. Our state-by-state table shows how other states differ.

How a project and a company get into eComply

  1. The project reaches its NTP date. The manual says UDOT imports your company profile and the project into eComply within 48 hours.
  2. First-time primes get an email. It goes to the primary contact in your company's Contractor Zone profile, to set a password and finish the company profile. UDOT's Contractor Resources page says Contractor Zone is where contractor registration and prequalification applications live, so a wrong contact there means the setup email goes to the wrong person.
  3. The prime coordinates the work start date with the project office. The manual says the project office activates each project no more than one week before the work start date.
  4. Subs get access only after approval. The manual says a sub's profile is imported for a project only after the subcontract is approved in MasterWorks, and a first-time sub gets its setup link at that point.

Why did I get a late payroll notice?

The manual ties late notices to this date: the work start date the prime enters for each approved sub. It says eComply uses that date for reporting and for notifications about late payrolls, "so it is important to ensure the date is accurate." If work slips, the prime can edit the date to a later one. A sub that gets a late notice for weeks it did not work should ask its prime to check that date first. The July 2021 Civil Rights manual also says that for weeks with no work, contractors still enter the payroll set-up information and enter 'No Work'.

The manual also makes the prime responsible for checking that subs submit weekly and for reviewing each sub payroll. So if a sub's payroll is stuck, start with the prime's payroll contact.

What is the deadline, and what does a late payroll cost?

The eComply manual says weekly but gives no due date or penalty. The older Civil Rights Manual of Instruction (July 2021) predates eComply (December 2024), so it may not describe the current system's deadline or disincentive. It gives the seven-day deadline two different triggers. Its labor compliance section says the prime and each sub "will enter a weekly payroll in UDOT's Certified Payroll System within seven days following the end of the pay period." Its Project Documents section says payrolls are to be entered "weekly, within seven days of the pay date." Both sections post a $50 disincentive per late payroll. The first sends it to the MasterWorks accounting system under the Special Requirements Attachment in UDOT's Notice to Contractors. Confirm in the Special Requirements Attachment of your own contract which trigger applies before you rely on either.

Can UDOT hold payments for wage problems?

Your contract's FHWA-1273 clause governs. The 2021 Civil Rights manual notes that UDOT has the authority to withhold funds from the contractor to pay employees the full wages the contract requires, and holds the funds until evidence of restitution has been provided. For a sub's underpayment, that manual says the money is withheld from progress payments to the prime. In its payroll adjustments section, the 2021 manual says willful failure to pay wages due, including fringe benefits, can result in fines, debarment and possible criminal action. It also says restitution is entered as an adjustment associated with the original payroll, and that, in the July 2021 manual's words, the Resident Engineer may request copies of both sides of a canceled adjustment check.

How does an SF-1444 work at UDOT?

If a worker's classification is not on the wage determination, you need an additional classification and rate. Our SF-1444 guide explains the form. The UDOT manual gives the UDOT route:

  1. Get a blank 1444 from the eComply dashboard, or ask UDOT's certified payroll contact for a pre-filled one.
  2. The contractor completes and signs it. The prime signs box 15, which the manual says is required.
  3. The prime emails the form to UDOT's certified payroll contact.
  4. UDOT uploads it to Project Documents, and the eComply wage rate team adds the classification and proposed rates so you can use them on payrolls.
  5. UDOT forwards the 1444 to the Department of Labor. The manual says a response may take 30 to 60 days.
  6. UDOT uploads the conformance to Project Documents and emails the requestor and the project office.

The 2021 Civil Rights manual says the contractor must pay the requested rate while the request is processed, and must make up any difference to employees if the Department of Labor sets a higher one. The two manuals describe different routes. The 2021 manual says the 1444 is entered in the Certified Payroll System, then printed, signed and forwarded to the UDOT Civil Rights Office. The eComply manual says the prime emails it to UDOT's certified payroll contact, and the eComply manual is the newer document. Ask the project office which route applies to your job, using the Certified Payroll Department Contacts listed in the eComply manual.

What is the red box on a payroll?

If DOL denies your proposed rates and sets new ones, the manual says eComply updates the project rates and re-checks payrolls for underpayment. A payroll flagged for underpayment gets a red outline. The prime or the office manager rejects it, and the contractor processes an adjustment payroll and submits it in eComply. The manual lists a Verification of Underpayments among the documents the contractor provides in Project Documents when needed.

What about the July report?

The manual says that in the last week of July, all contractors add their non-laborers to the payroll before entering that week's payroll. The 2021 Civil Rights manual says this feeds the FHWA-1391 annual report, with a separate entry for each federal-aid project, and that the prime reports only its own employees while each sub reports its own. Our FHWA-1391 guide covers the form, and notes that some state DOTs said in July 2026 they would not collect it. UDOT's eComply manual does not mention any 2026 change, so ask UDOT before July.

Where do you get help?

The manual says contractors can ask UDOT for a virtual training session and that eComply offers its own. UDOT also posts recorded electronic payroll system training for contractors and consultants; UDOT does not say which system it covers. For Contractor Zone registration, UDOT's Contractor Resources page lists contacts. UDOT's Contractor Zone site refuses automated access, so check there for registration steps and renewal.

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Which system do I use on a UDOT job with an NTP before December 2024?
Project Explorer, until the project is complete. The UDOT manual says only projects with an NTP on or after December 1, 2024 use eComply.
Why can't my sub see the project in eComply?
The manual says a sub's profile is imported only after the subcontract is approved in MasterWorks. The prime also has to enter the sub's work start date.
Where do I find the wage determination in eComply?
The manual says the Project Documents section holds the official wage determination UDOT provides, along with fringe benefit statements and any submitted 1444s.
Does Utah have its own prevailing wage law for state projects?
Utah Code 34-30-14 bars public bodies from requiring set wage rates or benefits unless state or federal law requires them, and its subsection (2)(b) exempts federally funded projects. Federal-aid UDOT work still follows federal rules.
Who signs the statement of compliance?
The contractor does. UDOT's 2021 manual says a statement of compliance must be entered for each payroll, and that entering it is the contractor's acknowledgement that the facts on Form WH-348 are true. Our WH-347 guide covers the federal form.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. Contractor Resources page connect.udot.utah.gov
  2. UDOT Certified Payroll System Contractor Manual drive.google.com
  3. Civil Rights Manual of Instruction for Contractors drive.google.com
  4. Utah Code 34-30-14 le.utah.gov
  5. udot.ecomply.us
  6. recorded electronic payroll system training for contractors and consultants connect.udot.utah.gov

Questions about your project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us