Arkansas certified payroll: what ArDOT and ADFA require

This page covers two Arkansas payroll channels, using the ArDOT proposal for Job 040904 and ArDOT's Doc Express guide for highway work and ADFA's July 2026 HOME and NHTF guideline for housing. State law is read from Act 1068 of 2017.

Last reviewed against the sources it cites

The short answer

Not under state law. Arkansas repealed its prevailing wage law in 2017 (Act 1068). The weekly payroll duty comes with federal money: ArDOT's Doc Express guide, dated July 15, 2020, has you upload each weekly payroll to a Payrolls drawer, and FHWA-1273 requires weekly payrolls on federal-aid jobs. ADFA's guideline has the contractor give weekly payroll forms to ADFA on HOME rental projects with 12 or more HOME-assisted units.

  • Act 1068 of 2017 repealed Arkansas Code sections 22-9-301 to 22-9-315, the state prevailing wage law, and took effect on the Governor's approval on April 6, 2017.
  • ArDOT's Doc Express guide, dated July 15, 2020, has primes and subcontractors each submit their own payrolls to a Payrolls drawer and says the prime shall not submit a subcontractor's.
  • The ArDOT proposal for Job 040904 accepts no paper submittals and routes all correspondence and submittals to the Department through Doc Express, but its special provision does not mention payroll.
  • The Division 100 PDF ArDOT posts is undated and was not confirmed to match the 2014 specifications; its section 108.01 returns subcontractor retainage within 30 calendar days of satisfactory completion, a test that includes payrolls approved by the Engineer.
  • ADFA's guideline (Rev. July 2026) says ADFA must approve current wage determinations before construction starts and that the contractor provides weekly payroll forms to ADFA, on Form WH-347 or acceptable internal forms.
  • Under section 20 of the same guideline, ADFA's duty to approve a HOME draw is subject to certifications of compliance with labor standards and to ADFA's determination that HOME requirements, including Davis-Bacon monitoring, are met.

Does Arkansas require certified payroll?

Not under a state prevailing wage law. Act 1068 repealed Arkansas Code sections 22-9-301 to 22-9-315 and took effect on the Governor's approval on April 6, 2017. The Department of Labor and Licensing's Labor Standards page lists minimum wage and overtime, child labor, wage claims and a few other topics, and no prevailing wage program.

The payroll duty on a federally funded job is federal, and it reaches you through your contract. This page covers two Arkansas agencies that publish how they run it. It did not read city, county or school district contracts, so read yours. Other states are in our state requirements table.

Your jobWeekly certified payroll?Goes to
ArDOT federal-aid construction over $2,000, except local roads and rural minor collectorsYes, under the Davis-Bacon section of Form FHWA-1273ArDOT, via Doc Express per the guide dated July 15, 2020
ADFA HOME rental project, 12 or more HOME-assisted unitsYes, per ADFA's guidelineADFA
ADFA National Housing Trust Fund project, no HOME moneyNot on NHTF alone, per the guidelineNot applicable

ADFA HOME projects: when a draw is held over Davis-Bacon

If your owner says ADFA has held a draw, start with the draw conditions. Section 20 of ADFA's guideline makes ADFA's duty to approve any draw subject to conditions met when the money is paid. Two concern labor. The draw package needs certifications of compliance with labor standards and prevailing wage requirements under federal law (item 4(c)), which tracks 24 CFR 92.354(a)(3)(vi). And ADFA must have determined that HOME requirements for disbursement are met, including monitoring of Davis-Bacon compliance (item 4(e)).

Timing adds pressure. ADFA must approve the current wage determinations before construction begins (section 20.D.1). The guideline states no consequence for starting early, so if work has begun, ask ADFA what it needs before the next draw. ADFA holds 10 percent of total funds as retainage until every item for final disbursement is approved (section 20.C), and final disbursement requires its determination that Davis-Bacon monitoring and other HOME requirements are met (section 20.B). ADFA may also require repayment of HOME funds if a draw does not occur within 12 months of the agreement or completion within 24 months of the commitment (section 22).

The guideline sets out no penalty specific to labor standards. Its capacity section may disqualify an application if it finds a development team member lacks capacity, and its list of nonperformance evidence includes excessive late or incomplete reports (section 5.D). It does not say payrolls count.

What ADFA says the HOME contractor owes

ItemWhat the guideline says (Rev. July 2026)
Before constructionADFA approves current wage determinations. The recipient obtains the prevailing wages from the Department of Labor and designates someone to monitor work on site and payrolls (section 9 table).
WeeklyThe contractor provides weekly payroll forms to ADFA and allows access to the site and workers for worker interviews. ADFA accepts Form WH-347 or acceptable internal forms.
How longCompliance documentation throughout construction, even when HOME is a permanent loan after completion.

ADFA's threshold, repeated on its HOME page, is the federal 12-unit line (section 9.C). NHTF funding does not trigger labor standards on its own. Our HOME 12-unit guide shows how the 12 is counted, our tax credit guide covers when other federal money brings Davis-Bacon in, our housing authority guide covers the federal weekly rules, and our WH-347 guide covers the form.

Where the payroll goes. The guideline's Portal section says ADFA requires forms and documents through its Portal, makes you resubmit anything sent another way, and lists Section 3 and Davis-Bacon reporting among required quarterly and monthly reporting (section 23). The labor text names no channel and says "the contractor", so it does not say how a subcontractor's payroll reaches ADFA. Ask ADFA through its contact page before the first payroll is due.

ArDOT federal-aid jobs: weekly payroll in Doc Express

The proposal for Job 040904, a Crawford County I-40 project with addenda through November 3, 2026, prints Form FHWA-1273 as revised June 25, 2026. Its Davis-Bacon section covers federal-aid construction projects over $2,000 and all related subcontracts, whatever their size. Local roads and rural minor collectors are exempt unless the law treats the project as federal-aid highway work anyway. You submit certified payrolls weekly, for each week with covered work, to the contracting agency, which is ArDOT, and the prime is responsible for submission of all subcontractor payrolls. WH-347 or any other format is allowed. Our FHWA-1273 guide covers the 2026 change. Other jobs have their own proposals, so check yours.

The proposal's Mandatory Electronic Document Submittal special provision says ArDOT accepts no paper submittals and requires all correspondence and submittals to the Department to go through Doc Express, except paper material delivery tickets and documents whose state or federal submittal rules conflict. It does not mention payroll, and neither does ArDOT's Doc Express page, which links two guides, the Doc Express site and a training video. The guide, dated July 15, 2020 and still posted by ArDOT, names a Payrolls drawer:

  1. Get access. Your company needs its own Doc Express organization account, and the special provision says the prime may give subcontractors access.
  2. Sign and name. Submit a PDF with a signature page, signed with the Doc Express checkbox. Name the file with the date submitted, your company name, then Week Ending and the payroll's last date, all dates as YYYYMMDD.
  3. Submit and share. Put it in the Payrolls drawer, typing your name exactly as Doc Express has it. The status shows Contractor Submitted. Then use Share to tell the Resident Engineer's office the payroll is ready.
  4. Review. The office checks that a representative of the correct company signed, reviews the payroll, and moves it to Reviewed by Department.

Subcontractors: confirm your path

FHWA-1273 makes the prime responsible for submission of every subcontractor payroll. The guide's Payrolls drawer has each sub submit its own and says the prime shall not. The special provision says the Engineer takes no action on a document a sub submits until the prime publishes it, and it does not mention payroll. Ask the Resident Engineer's office which path your job uses before your first payroll is due, and tell your prime.

When a payroll is late, rejected or wrong

  • In Doc Express. The guide lists Noncompliant - Late, Noncompliant - Inadequate pay and Noncompliant - Other among the Payrolls drawer's types. It does not say who applies them or what follows.
  • Payment. FHWA-1273 carries the federal payment-withholding and debarment consequences for missing payrolls, covered in our FHWA-1273 guide and WH-347 guide.
  • Retainage. The proposal names the 2014 Standard Specifications as the edition for that job. The Division 100 PDF ArDOT posts is undated, and this page did not confirm it matches the 2014 edition. Its section 108.01 requires return of a subcontractor's retainage within 30 calendar days after its work is satisfactorily completed, a test that includes payrolls received and approved by the Engineer. ArDOT's proposed 2027 specifications are posted as proposals for comment.

Signet is a different system. The proposal's Signet special provision tracks prompt payment: primes report payments to subcontractors, and subcontractors confirm receipt within 10 days at no fee. It is not where payroll goes.

If you found ADFA's 2019 training deck

ADFA's developer training deck is for its CDBG-DR 2019 program, funded after the May 2019 Arkansas River flooding. Its Davis-Bacon slide covers multifamily housing of 8 or more units and lists weekly WH-347 payrolls without naming who receives them. For HOME, use the July 2026 guideline above.

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Does Arkansas have a prevailing wage law?
No. Act 1068 of 2017 repealed it, effective April 6, 2017.
Where do I send certified payroll on an ArDOT job?
ArDOT's July 15, 2020 guide has you put it in the Payrolls drawer in Doc Express and share it with the Resident Engineer's office.
Can my subcontractor upload its own payroll to Doc Express?
The guide says yes, and says the prime shall not submit it. FHWA-1273 still makes the prime responsible, so tell your prime and confirm the path with the Resident Engineer's office.
Why is ADFA holding my owner's draw?
The guideline conditions each draw on labor standards certifications and on ADFA's determination that Davis-Bacon monitoring is done, and it requires wage determination approval before construction starts. Ask the owner which one ADFA says is open.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. ArDOT proposal for Job 040904 media.ark.org
  2. Doc Express guide media.ark.org
  3. ADFA's July 2026 HOME and NHTF guideline adfa.arkansas.gov
  4. Act 1068 of 2017 arkleg.state.ar.us
  5. Division 100 PDF media.ark.org
  6. Labor Standards page labor.arkansas.gov
  7. 24 CFR 92.354(a)(3)(vi) ecfr.gov
  8. its HOME page adfa.arkansas.gov
  9. contact page adfa.arkansas.gov
  10. Doc Express page ardot.gov
  11. proposed 2027 specifications ardot.gov
  12. developer training deck adfa.arkansas.gov

Questions about your project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us