Iowa CDBG labor standards: what IEDA trains the compliance reviewer to flag on your payroll

This page reads the IEDA and IFA training deck (74 slides), chapter 2 of the 2024 CDBG Management Guide and HUD's notice LR-96-01 of December 2, 1996.

Last reviewed against the sources it cites

The short answer

On an IEDA CDBG job your weekly payrolls go to the recipient's Labor Standards Compliance Officer. The IEDA and IFA training deck tells the reviewer to flag ghost employees, identical pay lines, unauthorized "other" deductions and a missing original signature. On a pay discrepancy it has the contractor pay the worker and give proof to the grantee, who enters the marked-up original, corrected payroll and proof in the Iowa Grants status report.

  • IEDA's 2024 CDBG Management Guide has each contractor and lower-tier subcontractor send weekly payrolls to the recipient's designated Labor Standards Compliance Officer.
  • IEDA and IFA's training deck lists four statement of compliance problems: nothing in block 1, no fringe benefit sub-block checked or the wrong one, no original signature, and a payroll clerk signing without a letter of authorization.
  • The same deck describes a restitution file of the marked-up original payroll, the corrected payroll and proof of payment to the worker, entered in the Iowa Grants status report once the restitution payment is received.
  • HUD notice LR-96-01 (December 2, 1996) has an owner working alone carried on the payroll of the contractor the owner works for, while an owner working with a crew may certify with the class "owner" and daily and total hours.
  • Under 29 CFR 5.2, a foreperson who spends more than 20 percent of a workweek on laborer or mechanic duties, and does not meet the part 541 criteria, is a laborer or mechanic for the time so spent.
  • IEDA's monitoring policy (12-2024 version) sets at least one monitoring per CDBG project before close-out (not for planning grants or projects that never draw funds), and the penalties it lists for an uncured deficiency fall on the recipient: delayed funds, effects on future grants or repayment.

If your payroll came back or a worker was interviewed

On an IEDA CDBG job, the person reading your payroll is the compliance reviewer the grantee designates as its Labor Standards Compliance Officer. The deck places the grantee's labor compliance point of contact on the Admin team and shows recipients leaning on their grant administrator to do the review. The guide has each contractor and lower-tier subcontractor send weekly payrolls to the recipient's designated Labor Standards Compliance Officer. The deck lists the grantee's duties as reviewing payrolls, interviewing workers and documenting the remedy for any discrepancy.

The deck is training, not a rule, but it is the list your reviewer has been handed, so match a returned payroll against the tables below. The threshold, the DOT channel and Form 830176 are on our Iowa certified payroll page, the form is in which WH-347 version to use. IEDA's 2024 guide accepts an alternate payroll form, while the deck says the new WH-347 must be used starting 1/1/2026, so ask the compliance officer. Other states are in the state by state table.

The deck requires a memo, signed by the grantee, for each project naming its labor compliance point of contact on the Admin team. Ask the grantee or your prime for that name.

What goes into Iowa Grants, and who handles it

Iowa Grants is where IEDA takes wage requests and records monitoring. Neither the deck nor the guide gives a contractor a step in it, and your payroll goes to the compliance officer.

ItemWho handles itWhat it means for you
Wage decision request (status report)The administrator submits it; IEDA's Labor Compliance Officer approves or commentsThe decision in your bid documents came through it
Additional classification requestThe administrator enters the SF-1444 data; IEDA's officer coordinates with DOLYou propose the craft and rate to the recipient. The guide describes a letter on company letterhead, while the deck says HUD form 4230A is no longer in use and the DOL SF-1444 must be used. Ask the compliance officer which package the reviewer wants.
Restitution fileEntered once payment is received; the deck names no contractor stepThree items, below

IEDA's monitoring policy (12-2024 version) lists labor standards as an area of review and sets a policy of at least one monitoring per CDBG project before close-out, no later than the 50 percent drawdown threshold, on-site or by desk. It says no monitoring is required where a project never proceeds or no funds were drawn, and for planning grants. The penalties it lists for an uncured deficiency, such as delayed funds, effects on future grants and repayment, fall on the recipient.

What the reviewer is trained to flag

On the payroll

FlagWhat to check before you send it
No employee identifier numberGive each worker an individually identifying number, such as the last four digits of the Social Security number
Classification missing, or the group letter left offUse the wage decision's classification and the group letter where required
Hours in the OT row instead of the standard rowStandard hours go in the standard row
"Other" deductions with no employee authorizationSend the authorizations. 29 CFR 3.5 permits, among others, deductions required by law (such as withholding taxes), bona fide prepayments of wages, and amounts required by court process unless the deduction benefits the contractor or an affiliate, while plan contributions under 3.5(d) need the worker's written consent in advance or a bona fide collective bargaining agreement, and 29 CFR 3.9 prohibits deductions Part 3 does not allow
Ghost employees, too few employees for the work seen, or the same hours, rate, gross and net across workersCarry every worker on the site and check identical lines against time records
Misclassification, such as apprentices, or laborers where masons or plumbers workedClassify by the work actually performed

On the statement of compliance

The deck lists four problems: nothing in block 1, no fringe benefit sub-block checked or the wrong one (the IEDA federal labor standards training deck says "sub-block of 4"), no original signature, and a payroll clerk signing with no authorization letter.

On the clerk, 29 CFR 5.5(a)(3)(ii)(C) lets the contractor's agent who pays or supervises the payment of the workers sign. The guide asks for the owner or an officer, and an authorization from anyone else, so send the letter. On the signature, the IEDA federal labor standards deck says originals are required, no copies, while 29 CFR 5.5(a)(3)(ii)(E) accepts an original handwritten or legally valid electronic signature. Ask the compliance officer in writing which the reviewer takes (see our statement of compliance page).

Apprentices and foremen

For apprentices the deck lists three flags: a beginning date after the worker started on the project, an ending date before the worker started, and no information submitted. It wants individual registration plus the program's title, ratio, pay scale, fringe and signatory pages, and otherwise says to pay the full journeyman rate. The one exception is an apprentice who is not yet individually registered but is certified eligible for probationary employment: the deck and 29 CFR 5.5(a)(4)(i)(A) allow the apprentice rate for the first 90 days. The federal clause requires the wage determination rate for anyone at an apprentice rate who is not registered or otherwise employed as stated in (A) (29 CFR 5.5(a)(4)(i)(C)).

The deck says a site supervisor who does laborer or mechanic work for more than 20 percent of the week is paid the wage decision rate for that work. 29 CFR 5.2 says the same of forepersons but excludes those who meet the criteria of 29 CFR part 541 for executive, administrative or professional employees, an exception the deck leaves out.

Owners and owner-operators on the payroll

The deck's owner-alone, owner-with-crew and truck rows come from LR-96-01. The deck has no slide on power-equipment owner-operators, so that row is from section IV of LR-96-01 alone. The guide agrees on the first row: an owner working without employees is listed on the general contractor's payroll.

SituationHow it goes on the payroll
Owner, partner or officer working aloneCarried on the payroll of the contractor the owner works for, with name, classification, actual hours, effective hourly rate and amount paid. Pay divided by hours cannot fall below the prevailing rate. A sole proprietor may not certify as "Owner" to his or her own wage.
Owner working with the owner's own crewMay certify with the crew's payroll, listing name, the class including "owner", and daily and total hours. No rate or earnings needed.
Owner-operator of power equipment, such as a backhoeCarried on the responsible contractor's payroll. HUD may accept a combined "man and machine" rate no lower than the operator's rate on the wage decision.
Bona fide truck owner-operator, independent contractorReported on the weekly payroll. HUD and the deck differ, below.

LR-96-01 covers only bona fide owner-operators of trucks who are independent contractors, and says laborers or mechanics, including drivers, whom the owner-operator employs are covered in the usual manner. It says the truck line needs only the notation "Owner-operator," with no hours or rates, and says nothing about the driver certifying. The deck says independent contractors can certify payroll reports, with the classification including "owner/operator" and daily and total hours. HUD's notice stays effective until amended, superseded or rescinded, and the deck still cites it. Ask the compliance officer in writing which to follow.

When the reviewer finds a discrepancy: the restitution file

The deck schedules worker interviews at least twice, when a new subcontractor starts, and when issues arise. Its interview red flags are refusals to take part, a classification that differs from observed work, workers missing from payrolls, and wages that differ from payroll. See the HUD-11 page.

  1. Written notice. The deck says to notify the contractor in writing, keep the correspondence, and establish a date for expected completion of the remedy.
  2. Pay the worker. Valid restitution is paid to the worker, and proof of payment goes to the labor compliance specialist.
  3. The file. When the payment is received, three items are entered in the Iowa Grants status report: the marked-up original payroll, the revised or corrected payroll, and proof of payment.

The sources do not say how to label a corrected payroll on an IEDA job, so ask the compliance officer.

What can happen to your payment

The contract clause in 29 CFR 5.5(a)(2) lets the recipient withhold accrued payments to cover wages owed, and after written notice suspend further payment if you fail to pay required wages or submit required records. The guide says funds may be withheld for unpaid wages only after written notice, that underpayments of $1,000 or more per employer go to DOL through IEDA, and that a prime answers for its subcontractors. See the HUD-4010 page.

Debarment

The deck's criteria are falsified payrolls, demanding kickbacks, repeat violations, misclassifying workers in clear disregard of their actual work, and, for a prime, failing to ensure its subcontractors comply. Under 29 CFR 5.12, a contractor the Secretary of Labor finds to have disregarded its obligations to workers or subcontractors is ineligible for three years. Falsifying a certification can also bring civil or criminal prosecution under 29 CFR 5.5(a)(3)(ii)(F).

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Do I enter anything in Iowa Grants as a contractor?
Neither the deck nor the guide gives a contractor a step in Iowa Grants. You send payrolls to the recipient's compliance officer.
Can my payroll clerk sign the statement of compliance?
The federal clause lets the agent who pays or supervises the payment of the workers sign. IEDA's guide asks for the owner or an officer, and an authorization from anyone else.
I am a one-person subcontractor. Do I send my own payroll?
No. The guide lists such an owner on the general contractor's weekly payroll.
What proof is expected after I pay back wages?
Proof of payment goes to the labor compliance specialist, and the restitution file holds it with the marked-up and corrected payrolls.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. IEDA and IFA training deck opportunityiowa.gov
  2. 2024 CDBG Management Guide opportunityiowa.gov
  3. notice LR-96-01 hud.gov
  4. 29 CFR 5.2 ecfr.gov
  5. IEDA's monitoring policy opportunityiowa.gov
  6. individually identifying number ecfr.gov
  7. 29 CFR 3.5 ecfr.gov
  8. 29 CFR 3.9 ecfr.gov
  9. IEDA federal labor standards training deck opportunityiowa.gov
  10. 29 CFR 5.12 ecfr.gov

Questions about your Iowa CDBG project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us