Missouri LS-04 wage survey: how your hours set next year's rate
The LS-04 is the form behind Missouri's annual wage order. The rules are in RSMo 290.257, 8 CSR 30-3.010 and the Division of Labor Standards wage survey page.
Last reviewed against the sources it cites
The short answer
The LS-04 is Missouri's Contractor's Wage Survey. DLS calls it voluntary, but the hours you report feed the weighted average behind the annual wage order. Hours count toward the order only if DLS receives them by January 31. Where fewer than 1,000 hours are reported for a trade in a county, workers get the public works contracting minimum wage instead.
- DLS describes the LS-04 as voluntary but heavily encouraged, and it accepts only wages from commercial work.
- Under RSMo 290.257, the prevailing rate for each occupational title is the weighted average wage, counting fringe benefits, of the reportable hours.
- Subsection 4 of 290.257 sets a threshold of 1,000 reportable hours per occupational title per locality; below it, workers are paid the public works contracting minimum wage, which is 120 percent of the locality's average hourly wage as determined by MERIC.
- Section 290.257 requires an initial determination by March 10 each year and a final annual wage order by July 1, with objections allowed against the initial determination.
- 8 CSR 30-3.010(4) says hours count only if DLS receives them by January 31, on its paper form or electronically, and handwritten forms are not accepted.
What the LS-04 is, and whether you have to submit it
The LS-04 is the Contractor's Wage Survey. DLS says it is voluntary, but heavily encouraged, because the information helps determine the Annual Wage Order for the coming year. It is not a payroll record and it does not replace the weekly or monthly payroll you owe the public body. For that, see Missouri certified payroll and the LS-57 payroll form.
How your hours become the prevailing wage
Section 290.257, as amended in 2018, builds each rate from reported hours, whether they were paid under a collective bargaining agreement or not.
- DLS takes the wage information contractors report for construction projects from the year before the annual wage order. Wages of entry-level workers and federally registered apprentices are not considered.
- For each occupational title, it multiplies every reported wage rate, fringe benefits included, by the hours paid at that rate, and adds the results. That is the reported wage sum.
- It divides the reported wage sum by the total reportable hours for the title. The result, the weighted average wage, is the prevailing wage rate.
DLS's calculations page gives a worked example. Of 2,500 hours submitted for laborers in a county, 200 apprentice hours and 100 on-the-job training hours are dropped. The remaining 2,200 hours total $92,100, which gives $41.86 an hour.
The 1,000 hour rule and the public works contracting minimum wage
This is where a thin report matters. Under subsection 4 of 290.257, DLS adds up the reportable hours for a title in a locality, counting hours paid under a collective bargaining agreement and hours that were not. The two kinds are added together.
| Reportable hours for a title in a locality | Who gets what |
|---|---|
| 1,000 or more | Workers in that title are paid the prevailing wage rate DLS calculates from the hours. |
| Fewer than 1,000 | Workers in that title are paid the public works contracting minimum wage. |
Subsection 2 sets the contracting minimum wage at 120 percent of the average hourly wage in the locality, as determined by the Missouri Economic Research and Information Center. DLS's FAQ says the same thing for counties. It describes the contracting minimum wage as the rate used instead of the prevailing wage where fewer than 1,000 hours are reported for a title.
That tells you what a missing survey does. If your county's trade has a sparse report, your bid and your payroll for the next year may be priced off a formula that no contractor in the county reported.
What counts and what does not
DLS's 2018 changes page, written in 2018 about the 2019 wage order, said DLS would use only hours reported on non-residential projects. That includes public and private work, and work with or without a collective bargaining agreement. The survey page says it accepts only commercial work. The form's instructions define the line: residential means single family homes or apartment buildings of fewer than four stories, and general maintenance is also left off.
8 CSR 30-3.010(4) adds the filing rules (the rule text on the Secretary of State site is dated June 2019). The rule describes the order as issued in March of the year after the hours are worked. Section 290.257.3 makes March 10 the initial determination and July 1 the deadline for the final annual wage order. DLS considers hours only if it receives them from a contractor by January 31, on its paper form or in electronic format. The rule says that for submitting reportable hours, "contractor" includes a subcontractor. It also says DLS leaves out hours not readily identifiable as submitted by a contractor, hours of federally registered apprentices or entry-level workers, and hours on residential projects.
So your subcontract hours count, and a private commercial job counts the same as a public one. Subsection (2) of that rule is about public bodies requesting wage orders. The survey rule is subsection (4).
The LS-04 line by line
The LS-04 and its instruction sheet ask for the following.
| Field | What the form asks |
|---|---|
| Contractor and contact details | Name, address, phone, email and website. The project information must be completed entirely or the survey is not accepted. |
| Dates of work | Beginning and ending dates for the work reported. |
| Rate type | Collective Bargaining Agreement Rate or Non-Collective Bargaining Agreement Rate. |
| County and description | The county, a project description, and the type of construction: Building, or Heavy and Highway (see 8 CSR 30-3.040). |
| Occupational title | One line per title and rate, using the titles in 8 CSR 30-3.060. Different rates in the same title need separate lines. |
| Total hours and basic hourly rate | Actual hours worked and the straight time rate. Estimated or averaged figures are not accepted. |
| Fringe columns | H&W (dental, health, vision, life), Retirement (annuities, pension supplements, 401K), Paid Time Off (holiday and vacation), and Training (apprenticeship and safety). Percentages must be converted to hourly rates. |
| Certification | Name, title, date and signature. Typing your name is the signature, and it certifies the figures are true. |
Rules that change what you enter
- Report journeyman wages only. Leave out apprentices and entry-level workers during on-the-job training.
- A working foreman can be reported at the journeyman line for hours actually spent working with the tools, but only if the foreman is paid more than the journeyman rate.
- Report straight time rates only. Overtime hours go in at the straight time rate, not the overtime rate.
The certification states that false statements are punishable under sections 290.340, 570.090, 575.050 and 575.060, RSMo. A survey built from clean payroll records avoids guessing. A weekly payroll that already shows title, hours, base rate and fringes by line gives you most of these columns directly, though your payroll's overtime lines must be converted to straight time before you enter them.
Deadlines and how to send it
| Date | What happens |
|---|---|
| Any time, monthly or quarterly | The form says surveys can be sent monthly and strongly recommends at least quarterly, within 31 days after each quarter ends. |
| January 31 | The form says the survey must be submitted by January 31, and 8 CSR 30-3.010(4) counts hours only if DLS receives them by then. The Public Works Guidebook says you can send it any time until January 31 of the year following your project. |
| March 10 | DLS must make its initial determination of the prevailing rates and the contracting minimum wage. Objections may be filed under section 290.262. |
| July 1 | The annual wage order must be final. It stays in effect until a new order replaces it. |
The LS-04 form (edition 06-25) gives two ways to send it: email to prevailingwage@labor.mo.gov, or mail to the Prevailing Wage Section at the Division of Labor Standards in Jefferson City. DLS also runs an online survey that its contractors page links to. In a January 2023 reminder, DLS said mailed surveys must be postmarked by January 31 and that a contractor who used electronic filing the year before must re-register. That is a 2023 notice, so confirm the current steps on the DLS page before the deadline, not on January 30.
The order is not fixed on March 10. DLS's look-up page says Annual Wage Order 33 became final and in effect on May 29, 2026, after the Labor and Industrial Relations Commission resolved all objections. Check the order number on any bid package you price.
The survey is separate from your payroll (Missouri certified payroll) and from the PW-4 and PW-5 and PW-8 check-off lists. For other states, see certified payroll requirements by state.
We prepare certified payroll for public works contractors. Tell us about your project.
Questions
Is the Missouri LS-04 required?
Can a subcontractor submit hours?
Do private jobs count?
What if my county has under 1,000 hours for my trade?
Should I report overtime at the overtime rate?
Can I send the LS-04 after January 31?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- RSMo 290.257 revisor.mo.gov
- 8 CSR 30-3.010 sos.mo.gov
- wage survey page labor.mo.gov
- calculations page labor.mo.gov
- FAQ labor.mo.gov
- 2018 changes page labor.mo.gov
- LS-04 and its instruction sheet labor.mo.gov
- Public Works Guidebook labor.mo.gov
- contractors page labor.mo.gov
- January 2023 reminder labor.mo.gov
- look-up page laborwebapps.mo.gov