Port of San Diego certified payroll: what the Port requires

This page follows the Port's own documents: its Equal Opportunity Contracting Program page and its Labor Compliance Forms packet. The packet is undated, so your contract documents and preconstruction meeting control if they differ.

Last reviewed against the sources it cites

The short answer

The Port of San Diego's labor compliance packet requires weekly certified payroll through LCPtracker, each with a Statement of Compliance, plus start-of-job forms and a monthly CAC-2. The Port says it reviews weekly payrolls, interviews workers on site, and may withhold progress payments when reports are late, inaccurate or incomplete.

  • The Port's Equal Opportunity Contracting page says its staff review weekly certified payroll reports, interview workers at the construction site, and audit contractor records when appropriate.
  • The Port's Labor Compliance Forms packet requires prime and subcontractors at every tier to submit weekly certified payrolls online through LCPtracker.
  • The same packet says progress payments may be withheld if reports are not on time, accurate and complete.
  • The packet says payroll reports will be rejected if the Statement of Compliance is not included.
  • The packet says DAS 142 apprentice dispatch requests must go out at least 72 hours before work starts, and that CAC-2 training fund contributions are due on the 15th of each month even if you are not training apprentices.
  • The Port's Authorized Signatory form says the person named, and any delegate whose name also appears, must be owners or officers of the company, while the Port's packet says an owner or a designee may sign.

What does the Port of San Diego require on public works?

The Port's program page says contractors on District public works projects are subject to state and federal laws on paying wages, reporting them and using apprentices. Its staff check this by reviewing weekly certified payroll reports, interviewing your workers at the site and, when appropriate, auditing your records. They also give preconstruction presentations on your obligations.

The packet adds the stakes. The prime contractor must review every subcontractor's reports for completeness and accuracy before they go to the District, and progress payments may be withheld if reports are not on time, accurate and complete. The packet applies to all contractors regardless of tier.

What is due, and when?

WhenWhat the packet requires
At project startA contact list for the prime, every subcontractor and vendor, with all trades and crafts; the List of Trades/Crafts; DAS 140 for each apprenticeable trade; the Fringe Benefit Statement; the Authorized Signatory form; an Authorization for Payroll Deduction, which the affected employee must sign; and DAS 142, which the packet lists with the start-of-project items and requires at least 72 hours before work starts.
WeeklyA certified payroll for every worker, submitted online through LCPtracker, with a Statement of Compliance. A Statement of Non-Performance when no work was done for a week or longer.
MonthlyCAC-2 training fund contributions, due the 15th of each month. See the CAC-2 section for what the form copy says about federal projects.
When neededA revised Fringe Benefit Statement whenever rates or the way benefits are paid change.

The packet gives no day of the week by which the weekly payroll is due. Read your contract, and ask the labor compliance officer at the preconstruction meeting.

Where do you submit the weekly payroll?

The packet says weekly certified payrolls go online through LCPtracker, "the District's web based labor compliance program," and points to LCPtracker's contractor training page for support. The Port's program page names no portal, so the packet is the source for this.

The packet does not mention DIR's eCPR system. Whether you also owe a separate filing to the Labor Commissioner on your job is a different question from what the Port collects. Our LCPtracker versus DIR guide covers it, and our awarding body portal list shows how other agencies handle the same split. If the Port rejects a payroll, see rejected payroll in LCPtracker.

The Statement of Compliance and the authorized signatory

Each certified payroll must come with a Statement of Compliance, and the packet says reports are rejected without it. The Port's form has the signer state four things:

  1. Everyone on the project was paid the full weekly sums earned, with no rebates and no deductions other than the permissible ones you list.
  2. The payroll is correct and complete, the wage rates are not below the applicable determination, and the classifications match the work performed.
  3. Any apprentices employed were registered in a bona fide apprenticeship program.
  4. Fringe benefits were paid to approved plans or in cash, with any exceptions listed by craft.

The form closes by saying willful falsification may lead to civil or criminal prosecution, and cites federal code sections as printed. The signature is the contractor's. Our Labor Code 1776 guide covers the state record-keeping duty behind it.

Who may sign is set by the Authorized Signatory form. The form says the person identified, and any delegate, must be owners or officers of the company, and that if you delegate, both names must appear and stay current. The packet's General Information says something different: the form "must be signed by the company's owner or a designee," and the designee is usually the person who prepares and submits the payroll reports. The form and the packet do not match, so follow the form's text and confirm with the Port before you name a preparer who is not an owner or officer. If the authorization changes, you resubmit the form with an original signature.

Which payroll form does the Port link?

The Port links DIR's Public Works Payroll Reporting Form, A-1-131, as its payroll form. It has columns for each worker's classification, daily and total hours, hourly rate, gross pay, deductions and contributions, and net wages. See our Form A-1-131 guide for how to fill it out.

Check which version of each form you use. The packet embeds copies of the DAS 140 and DAS 142 forms. Its DAS 142 copy is marked Revised 12/11 and lacks the PWC project number and PWC registration number lines that appear on DIR's DAS 142 (6/24). We suggest using DIR's current form and filling in those lines, and confirming that with the Port.

DAS 140, DAS 142 and the CAC-2

DAS 140

The packet requires DAS 140 from the prime and every subcontractor, for each apprenticeable trade, listing anticipated dates, number of apprentices and journeyman hours. The packet says to send it to every apprenticeship program in the geographic area of the project, for each craft you intend to employ, with a copy to the District. The form itself says not to send it to the Division of Apprenticeship Standards, and the packet says proof of submission must be given to the Labor Compliance Officer.

DAS 142

The DAS 142 requests dispatch of an apprentice. The packet requires it at least 72 hours before work commences, with a copy to the District and proof of submission. It says contractors not already employing sufficient apprentices must request dispatch from all approved programs in the geographical area, and contractors who employ apprentices but do not meet the required ratio for their craft must request dispatch from any other programs for that craft in the area. The form says requests must be in writing, exclude weekends and holidays from the 72 hours, and, except for projects with under 40 hours of journeyworker work, must be for no less than 8 hour increments. Our DAS 140 and 142 guide covers the timing in more detail.

CAC-2

The packet says contributions are due on the 15th of each month, must be paid even if you are not training apprentices, cannot be paid to employees, and are based on the rate in the wage determination for the craft. The delivery instructions conflict. The packet lists the CAC-2 under monthly reports submitted through LCPtracker. The packet's own form copy and the CAC-2 page the Port links, which is DIR's, describe a paper form with a check mailed to the California Apprenticeship Council at a Los Angeles P.O. box; DIR's page says to print the form and "mail it with your payment." Ask the Port's labor compliance officer how you show proof. The form copy also says the Council does not accept training fund contributions for federal public works projects, unless a public agency administers the project or the work is in non-apprenticeable occupations, and DIR's page says you need not submit a zero CAC-2 for a month with no work. The packet cover has separate state and Davis-Bacon boxes, so check which are marked for your job. Our CAC training fund guide covers the rate and mailing.

Which wage determination applies?

The packet says the bid advertisement date decides which general prevailing wage determination applies. It also says that where a project carries both state and federal rates, contractors must pay the higher of the two. Your contract names which applies. DIR publishes the general determinations.

Questions

Does the Port of San Diego use LCPtracker?
Its Labor Compliance Forms packet says weekly certified payrolls are submitted online through LCPtracker, which it calls the District's web based labor compliance program.
What if no work happened this week?
The packet lists a Statement of Non-Performance for when no work was performed on a project for one week or longer. Confirm with the labor compliance officer how it wants that submitted.
Can the Port hold my payment over late payroll?
The packet says progress payments may be withheld if reports are not on time, accurate and complete.
Who can sign for my company?
The Port's Authorized Signatory form says the person named and any delegate must be owners or officers. The packet says an owner or a designee, usually the preparer. Follow the form and confirm with the Port. Resubmit the form with an original signature if the authorization changes.
Who do I contact at the Port?
The Port's Equal Opportunity Contracting page points to Procurement Services and the general Contact the Port page. The public packet's cover leaves the Labor Compliance Officer field blank, so the officer for your job is named at the preconstruction conference and on your project's packet cover.
Is the packet the final word?
No. The packet is undated, and it says additional posters may be required depending on the funding source and refers you to the funding agency requirements in the contract documents. Your contract and preconstruction meeting control.

WellStanding prepares the WH-347 and the eCPR from the payroll export you already run, and a person reviews every filing. You review the finished filing and sign the certification in one step, and nothing is filed until you have signed; we never sign for you.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. Equal Opportunity Contracting Program page portofsandiego.org
  2. Labor Compliance Forms packet pantheonstorage.blob.core.windows.net
  3. Authorized Signatory form pantheonstorage.blob.core.windows.net
  4. LCPtracker's contractor training page lcptracker.com
  5. form pantheonstorage.blob.core.windows.net
  6. Public Works Payroll Reporting Form dir.ca.gov
  7. DIR's DAS 142 (6/24) dir.ca.gov
  8. DAS 140 dir.ca.gov
  9. CAC-2 page dir.ca.gov
  10. general determinations dir.ca.gov
  11. Procurement Services portofsandiego.org
  12. Contact the Port portofsandiego.org

Payroll rejected by the Port? First filing free

Send the payroll export you already run. We turn it into the WH-347 and the DIR eCPR filing, checked by software and verified by a person. First filing free, before you pay us anything. $995 one time setup, then $249 per month flat for crews up to 25 workers.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallFirst filing free