SHRA certified payroll requirements: eComply, wage rates, and DIR

This page reads the Doing Business With SHRA page (footer dated 2022), IFB 1973-DD (December 4, 2019), SHRA's CDBG and Federal Requirements attachments (both revised February 2017), and 29 CFR 5.5. The newest SHRA solicitation text read is from 2019, and SHRA's current OpenGov solicitations were not readable, so check your own contract.

Last reviewed against the sources it cites

The short answer

SHRA's Doing Business page says all SHRA contractors and subcontractors will be required to use eComply, with no schedule stated. One 2019 solicitation, IFB 1973-DD for an Under $10,000 Qualified Vendor List, sets weekly submission. Which wage rate applies depends on your contract: SHRA's attachments sort it by funding source, that IFB by funding source and property list, and 24 CFR 965.101 limits state rates on low-income public housing work. Ask SHRA in writing which rate and filings apply.

  • SHRA's Doing Business With SHRA page, whose footer reads 2022, says all SHRA contractors and subcontractors will be required to use eComply Solutions for labor compliance submittals, and it states no submission schedule.
  • IFB 1973-DD, an Under $10,000 Qualified Vendor List issued December 4, 2019, requires the contractor and lower tiered subcontractors to submit weekly certified payroll through eComply, while allowing a subcontractor only at the Agency's discretion for incidental work.
  • SHRA's CDBG attachment (Rev 2/6/2017), which binds the Subrecipient in a CDBG-funded SHRA contract, says California prevailing wages may apply and, if they do, the wage is the higher of Davis-Bacon or the state rate, as determined by trade.
  • 24 CFR 965.101 (last amended 1996) makes a state prevailing wage rate inapplicable on a contract or work item otherwise subject to state wage law, for the development, maintenance and modernization of a project assisted with low-income public housing funds, when the state rate exceeds the applicable Davis-Bacon or HUD-determined rate.
  • IFB 1973-DD says it is the Agency's discretion which projects or contracts are registered with DIR for payroll reporting.
  • The Doing Business page lists only a Procurement Services contact, ps@shra.org and (916) 440-1378, and no labor compliance contact.

SHRA says contractors will be required to use eComply

The Sacramento Housing and Redevelopment Agency (SHRA) says it partnered with eComply Solutions for labor compliance submittals. Its Doing Business page says all SHRA contractors and subcontractors will be required to use eComply, links to eComply's sign-in page, and states no submission schedule.

Where "weekly" comes from

In the SHRA documents read, one solicitation sets weekly submission. IFB 1973-DD (December 4, 2019), titled "Under $10,000 Qualified Vendor List", requires the contractor and all lower tiered subcontractors to submit all weekly certified payroll reports and labor compliance documentation through eComply. It sets up task orders, mainly at Public Housing locations but usable by any Agency department, and allows no subcontracting except, at the Agency's discretion, incidental work outside the contractor's license type. It is not the rule for every SHRA contract.

If you are a subcontractor

Register your company on eComply, as SHRA's page asks of every subcontractor, and ask how often to submit. The Doing Business page gives no schedule and the IFB says weekly. For Davis-Bacon work, 29 CFR 5.5(a)(3)(ii)(A) calls for weekly certified payrolls and makes the prime responsible for its subcontractors' submissions.

Which wage rate applies: Davis-Bacon, HUD-determined, or California?

Funding or propertyWhat the document saysSource and date
CDBG-funded SHRA agreementFor construction, alteration or repair, the Subrecipient must follow Davis-Bacon unless an exemption determination is made and expressly stated elsewhere in the contract. California wages may apply, and if so, pay the higher, by tradeCDBG attachment, paragraph 25, Rev 2/6/2017
HOME (12 or more units) or CDBG (8 or more units) multifamily loanDavis-Bacon applies. If state wages also apply, pay the higher, by tradeCity lending policies, sections 6.1.2 and 6.1.3, adopted January 1, 2025
Other HUD or federal money, not CDBGFor construction, alteration or repair, Davis-Bacon applies unless the contract expressly indicates otherwise. No higher-of sentenceFederal Requirements attachment, paragraph 8, REV 020617 (2017)
Low-income public housing fundsFor development, maintenance and modernization work otherwise subject to state wage law, a state rate above the Davis-Bacon or HUD-determined rate is inapplicable24 CFR 965.101(a) and (b), last amended March 5, 1996
IFB 1973-DD task ordersFederal funds, ACC locations (Exhibits 1 and 2; the IFB does not spell out ACC): Part A HUD-determined maintenance wages, Part B Davis-Bacon Residential, Part C (5 stories or higher) Davis-Bacon Building. Local funds, non-ACC locations: Part D California state prevailing wages. Section 00150 separately applies state prevailing wage at the Exhibit 3 addressesIFB 1973-DD, Sections 00800 and 00150 and Exhibit 3, December 4, 2019

Each attachment applies only if all or part of the funds come from its stated federal source. The CDBG attachment binds the "Subrecipient" (the Contractor under that contract) and the other the "Contractor"; neither Davis-Bacon paragraph mentions subcontractors, so check your own subcontract.

The IFB's own clauses pull both ways. Section 00150 says its contracts are subject to Federal and State labor standards and applies state prevailing wage at the Exhibit 3 addresses, while the HUD clause it reproduces (HUD-5370-EZ, paragraph (m)) makes a state rate inapplicable whenever it exceeds the Davis-Bacon rate, with no Exhibit 3 carve-out. Part D says "Local Funds: Non-ACC locations" and Exhibit 3 is a "Non-ACC Property List"; joining the two is this page's reading. The wage line on your task order, then SHRA's written answer, settles it.

So "the higher rate governs" is not an SHRA-wide rule, and neither is its opposite. DIR's public works FAQ says federally funded projects carried out by California awarding bodies must pay California's rates if they exceed Davis-Bacon rates. 24 CFR 965.101 says the reverse, but only for low-income public housing work. Ask SHRA in writing which rate it enforces. If both apply, see Davis-Bacon plus California prevailing wage.

Do you also file certified payroll with DIR?

IFB 1973-DD says contractors must register with the Department of Industrial Relations (DIR) and that it is the Agency's discretion which projects or contracts will be "registered with the DIR for payroll reporting".

DIR's FAQ has the awarding body register the project, after which contractors submit through DIR's portal. If it is not registered, ask the awarding body to register it, and if it still has not, contact the DIR Public Works Office at publicworks@dir.ca.gov. Labor Code 1771.4(a)(3) requires each contractor and subcontractor on covered public works to furnish payroll records electronically to the Labor Commissioner at least monthly, or more often if the awarding body's contract says so, meaning at least once every 30 days while work is performed.

The small project exemption is narrow

The FAQ says contractors who work exclusively on small public works projects need not register or file electronic certified payroll for them. The limit is $25,000 for new construction, alteration, installation, demolition or repair and $15,000 for maintenance, measured on the whole contract between the awarding body and the prime contractor, so a small subcontract under a larger contract does not qualify. The IFB says the Agency may register some or all projects even below DIR's small project limit. The text of 24 CFR 965.101 addresses wage rates and is silent on payroll filing.

Ask SHRA in writing whether it registered your project and for its project ID, or search with our project ID guide. If it did, the filing duty applies and you also submit on DIR's portal: see how to submit certified payroll to DIR.

Forms and signatures

IFB 1973-DD reproduces form HUD-5370-EZ (1/2014), which accepts a properly executed WH-347 certification as the Statement of Compliance. The IFB does not say whether eComply replaces the form or its signature. Under current 29 CFR 5.5(a)(3)(ii), the statement must be signed by the contractor or subcontractor, or the agent who pays or supervises payment of the workers, with an original handwritten or legally valid electronic signature, and the IFB's clause has no signature-type wording. Ask SHRA which clause applies. See ink or electronic signature on HUD work and who signs.

If a week is late or missed

29 CFR 5.5(a)(3)(iv)(B) lets the federal agency, after written notice, act to suspend further payment, advance or guarantee of funds if a contractor fails to submit required records or make them available, and failure to submit on request may be grounds for debarment. Labor Code 1771.4(a)(3)(B) adds a state penalty of $100 per day for failing to furnish records to the Labor Commissioner, up to $5,000 per project, and (C) bars it until the records are 14 days late. For a week with no covered work, see the no-work payroll guide.

Who to contact at SHRA

The Doing Business page (footer 2022) lists the Procurement Services Division, ps@shra.org, (916) 440-1378, and no labor compliance contact.

The HUD maintenance wage decision form in IFB 1973-DD (Form 52158, December 4, 2019) gives a name and the title Compliance Analyst, and the IFB cover lists the same name as its Procurement buyer. That person may not hold either role now. Start with Procurement, ask to be routed, and keep every answer in writing.

What we do

WellStanding prepares the WH-347 and, where it applies, the eCPR from the payroll export you already run, and a person reviews every filing. You review and sign, and nothing is filed until you have signed; we never sign for you.

Questions

Do subcontractors have to use eComply on SHRA jobs?
SHRA's Doing Business page says all contractors and subcontractors will be required to use it, with no schedule stated. IFB 1973-DD adds weekly submission by lower tiered subcontractors.
Does the higher of Davis-Bacon or California prevailing wage always apply on SHRA work?
No. The higher-of lines are in the CDBG attachment and the City lending policies, while IFB 1973-DD carries a HUD clause making a higher state rate inapplicable, which 24 CFR 965.101 covers only for low-income public housing work.
Do I file with DIR as well as eComply?
SHRA's 2019 text leaves DIR registration to the Agency, and DIR's FAQ has the awarding body register the project. Labor Code 1771.4(a)(3) puts the filing duty on contractors and subcontractors.
Can I email WH-347 PDFs instead of using eComply?
The SHRA pages do not say. The current 29 CFR 5.5(a)(3)(ii)(A) lets an agency or prime contractor require an electronic system as long as it permits other methods when the contractor is unable or limited in its ability to use or access it. That wording is in the 10/23/2023 eCFR version, not the 8/23/2023 version, and the IFB's HUD-5370-EZ (1/2014) lacks it.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. Doing Business With SHRA page shra.org
  2. IFB 1973-DD shra.org
  3. CDBG shra.org
  4. Federal Requirements shra.org
  5. 29 CFR 5.5 ecfr.gov
  6. 24 CFR 965.101 ecfr.gov
  7. eComply's sign-in page prod.ecomply.us
  8. City lending policies shra.org
  9. DIR's public works FAQ dir.ca.gov
  10. Labor Code 1771.4 leginfo.legislature.ca.gov
  11. 10/23/2023 eCFR version ecfr.gov
  12. 8/23/2023 version ecfr.gov

Working an SHRA job? First filing free

Send the payroll export you already run. We turn it into the WH-347 and, where it applies, the DIR eCPR filing, checked by software and verified by a person. First filing free, before you pay us anything. $995 one time setup, then $249 per month flat for crews up to 25 workers.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallFirst filing free