Carpenter prevailing wage in California, 2026: rates by area

These are DIR's published general determination figures as of the issue date shown on each one. The rate for a job depends on the bid advertisement date and the determination in the bid documents (see how to read a determination), so confirm every figure on the DIR PDF linked in the section before you bid or pay.

DIR 2026-2 determinations, extracted November 13, 2026

The short answer

DIR's 2026-2 determinations on this page cover 9 different crafts and craft sections, so no single rate range is given. Each section below lists its own classifications, areas and rates; confirm your craft's rate on the DIR PDF.

  • No single range: this page holds different crafts, so read your own craft's section below.
  • Areas: Northern California; Southern California; San Diego; each section below lists its counties, issue date and expiration date.
  • Under 8 CCR 16204(a)(1), a call for bids put out on or after a determination's effective date must reflect that determination.
  • Between issues, DIR can issue interim determinations, corrections, and modifications, which it lists on its important notices page.
  • Expired determination: SC-23-31-20-2026-1 expired June 30, 2026. It is marked in its section below with the asterisk explanation.

Determinations for carpenter

Each section below is one determination, headed by the determination number printed on DIR's PDF for carpenter. A PDF can print more than one determination, and each one has its own section here; a PDF can also hold determinations for other crafts that this page does not list, so open the PDF linked in each section for any others. Pick the one for your county and craft scope; which craft classification applies is its own question. DIR lists any interim determination, correction or modification on its important notices page, so check it before you rely on a figure.

Carpenter#, Northern California

  • Determination: NC-23-31-1-2026-2
  • Region and counties: Northern California. 46 counties.
  • Issue date: October 30, 2026
  • Expiration date: June 30, 2027 (*)
  • Applies to: DIR's determination applies to projects advertised for bids on or after November 9, 2026.
  • Source: DIR determination PDF, NC-23-31-1-2026-2

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, Sonoma
  • Area 2: Monterey, San Benito, Santa Cruz
  • Area 3: El Doradoa, Placera, Sacramento, San Joaquin, Yolo
  • Area 4: Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Doradoa, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Nevada, Placera, Plumas, Shasta, Sierra, Siskiyou, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yuba
ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOthercHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)d,eDaily Overtime Hourly Rate (2 X)dSaturday Overtime Hourly Rate (1 ½ X)d,f,gSaturday Overtime Hourly Rate (2X)d,fSunday/Holiday Overtime Hourly Rate (2 X)d,h
CarpenterArea 1$74.46$15.87$7.50$6.28$1.36$3.948$109.41$146.64$183.87$146.64$183.87$183.87
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 1$74.61$15.87$7.50$6.28$1.36$3.948$109.56$146.87$184.17$146.87$184.17$184.17
CarpenterArea 2$68.58$15.87$7.50$6.28$1.36$3.948$103.53$137.82$172.11$137.82$172.11$172.11
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 2$68.73$15.87$7.50$6.28$1.36$3.948$103.68$138.05$172.41$138.05$172.41$172.41
CarpenterArea 3$68.58$15.87$7.50$6.28$1.36$3.948$103.53$137.82$172.11$137.82$172.11$172.11
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 3$68.73$15.87$7.50$6.28$1.36$3.948$103.68$138.05$172.41$138.05$172.41$172.41
CarpenterArea 4$67.23$15.87$7.50$6.28$1.36$3.948$102.18$135.80$169.41$135.80$169.41$169.41
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 4$67.38$15.87$7.50$6.28$1.36$3.948$102.33$136.02$169.71$136.02$169.71$169.71

2nd Shift (i)

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOthercHoursjTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)d,kDaily Overtime Hourly Rate (2 X)dSaturday Overtime Hourly Rate (1 ½ X)d,f,gSaturday Overtime Hourly Rate (2X)d,fSunday/Holiday Overtime Hourly Rate (2 X)d,h
CarpenterArea 1$79.42$15.87$7.50$6.28$1.36$3.947.5$114.37$146.64$183.87$146.64$183.87$183.87
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 1$79.58$15.87$7.50$6.28$1.36$3.947.5$114.53$146.87$184.17$146.87$184.17$184.17
CarpenterArea 2$73.15$15.87$7.50$6.28$1.36$3.947.5$108.10$137.82$172.11$137.82$172.11$172.11
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 2$73.31$15.87$7.50$6.28$1.36$3.947.5$108.26$138.05$172.41$138.05$172.41$172.41
CarpenterArea 3$73.15$15.87$7.50$6.28$1.36$3.947.5$108.10$137.82$172.11$137.82$172.11$172.11
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 3$73.31$15.87$7.50$6.28$1.36$3.947.5$108.26$138.05$172.41$138.05$172.41$172.41
CarpenterArea 4$71.71$15.87$7.50$6.28$1.36$3.947.5$106.66$135.80$169.41$135.80$169.41$169.41
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 4$71.87$15.87$7.50$6.28$1.36$3.947.5$106.82$136.02$169.71$136.02$169.71$169.71

3rd Shift (i)

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOthercHoursjTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)d,kDaily Overtime Hourly Rate (2 X)dSaturday Overtime Hourly Rate (1 ½ X)d,f,gSaturday Overtime Hourly Rate (2X)d,fSunday/Holiday Overtime Hourly Rate (2 X)d,h
CarpenterArea 1$85.10$15.87$7.50$6.28$1.36$3.947$120.05$146.64$183.87$146.64$183.87$183.87
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 1$85.27$15.87$7.50$6.28$1.36$3.947$120.22$146.87$184.17$146.87$184.17$184.17
CarpenterArea 2$78.38$15.87$7.50$6.28$1.36$3.947$113.33$137.82$172.11$137.82$172.11$172.11
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 2$78.55$15.87$7.50$6.28$1.36$3.947$113.50$138.05$172.41$138.05$172.41$172.41
CarpenterArea 3$78.38$15.87$7.50$6.28$1.36$3.947$113.33$137.82$172.11$137.82$172.11$172.11
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 3$78.55$15.87$7.50$6.28$1.36$3.947$113.50$138.05$172.41$138.05$172.41$172.41
CarpenterArea 4$76.83$15.87$7.50$6.28$1.36$3.947$111.78$135.80$169.41$135.80$169.41$169.41
Hardwood Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel Scaffold And Steel Shoring ErectorArea 4$77.01$15.87$7.50$6.28$1.36$3.947$111.96$136.02$169.71$136.02$169.71$169.71

Footnotes as printed on the DIR determination PDF, NC-23-31-1-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Area 3 includes the portion of Placer County west of and including Highway 49 and the portion of El Dorado County west of and including Highway 49 and the territory inside the city limits of Placerville. Area 4 includes the portions of Placer and El Dorado Counties not covered in Area 3.
  • b Includes an amount per hour worked for Work Fees and Vacation.
  • c Includes Annuity Trust Fund, Industry Promotion, Carpenters International Training Fund, Work Preservation, Carpenter Employers Contract Administration, and Vacation/Holiday/Sick Leave Admin.
  • d The overtime rates for shift work are based on the non-shift overtime rates.
  • e For building construction, rate applies to the first 4 hours daily overtime. For all heavy, highway and engineering construction overtime worked, Monday through Friday, rate applies to the first 4 hours daily overtime.
  • f In the event that work cannot be performed Monday through Friday because of inclement weather or major mechanical breakdown, employees may voluntarily make up such day on Saturday and shall be paid at the applicable straight time rates.
  • g Rate applies to the first 8 hours for building construction and for the first 10 hours worked on heavy, highway and engineering construction.
  • h Time and one-half shall be paid for the first eight (8) hours worked on the four (4) days of each year selected by the Union as designated off/holidays listed in the Holiday Provision.
  • i Does not apply to tenant improvement or renovation projects in occupied buildings with a total contract value of $5 million or less.
  • j Daily overtime applies after 7 ½ hours worked at the straight-time rate for second shift and after 7 hours worked at the straight-time rate for third shift.
  • k For building construction, rate applies to the first 2 hours prior to the start of the regular or approved day, or the first 4 hours after the end of the approved or regular work day, not to exceed a total of 4 hours in any 1 work day. For heavy, highway and engineering construction rate applies to the first 4 hours prior to the start of the regular or approved day, or the first 4 hours after the end of the approved or regular work day, not to exceed a total of 4 hours in any 1 work day

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Bridge Builder/Highway Carpenter, Northern California

  • Determination: NC-23-31-1-2026-2A
  • Region and counties: Northern California. 46 counties.
  • Issue date: October 30, 2026
  • Expiration date: June 30, 2027 (*)
  • Applies to: DIR's determination applies to projects advertised for bids on or after November 9, 2026. The same PDF also prints determinations NC-23-31-1-2026-2 and NC-23-31-1-2026-2B for the craft of Carpenter.
  • Source: DIR determination PDF, NC-23-31-1-2026-2A

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOthercHoursTotal hourly rateDaily (1 ½ X)d,eDaily (2 X)dSaturday (1 ½ X)d,f,gSaturday (2X)d,fSunday/Holiday (2 X)d,h
Bridge Builder/Highway Carpenter$74.46$15.87$7.50$6.28$1.36$3.948.0$109.41$146.64$183.87$146.64$183.87$183.87
Bridge Builder/Highway CarpenterSpecial Single Shift$83.77$15.87$7.50$6.28$1.36$3.948.0$118.72$146.64$183.87$146.64$183.87$183.87

2nd Shifti

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOthercHoursjTotal hourly rateDaily (1 ½ X)d,kDaily (2 X)dSaturday (1 ½ X)d,f,gSaturday (2X)d,fSunday/Holiday (2 X)d,h
Bridge Builder/Highway Carpenter$79.42$15.87$7.50$6.28$1.36$3.947.5$114.37$146.64$183.87$146.64$183.87$183.87

3rd Shifti

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOthercHoursjTotal hourly rateDaily (1 ½ X)d,kDaily (2 X)dSaturday (1 ½ X)d,f,gSaturday (2X)d,fSunday/Holiday (2 X)d,h
Bridge Builder/Highway Carpenter$85.10$15.87$7.50$6.28$1.36$3.947.0$120.05$146.64$183.87$146.64$183.87$183.87

Footnotes as printed on the DIR determination PDF, NC-23-31-1-2026-2A

  • * Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director - Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.
  • b Includes an amount per hour worked for Work Fees and Vacation.
  • c Includes Annuity Trust Fund, Industry Promotion, Carpenters International Training Fund, Work Preservation, Carpenter Employers Contract Administration, and Vacation/Holiday/Sick Leave Admin.
  • d The overtime rates for shift work are based on the non-shift overtime rates.
  • e For building construction, rate applies to the first 4 hours daily overtime. For all heavy, highway and engineering construction overtime worked, Monday through Friday, rate applies to the first 4 hours daily overtime.
  • f In the event that work cannot be performed Monday through Friday because of inclement weather or major mechanical breakdown, employees may voluntarily make up such day on Saturday and shall be paid at the applicable straight time rates.
  • g Rate applies to the first 8 hours for building construction and for the first 10 hours worked on heavy, highway and engineering construction.
  • h Time and one-half shall be paid for the first eight (8) hours worked on the four (4) days of each year selected by the Union as designated off/holidays listed in the Holiday Provision.
  • i Does not apply to tenant improvement or renovation projects in occupied buildings with a total contract value of $5 million or less.
  • j Daily overtime applies after 7 ½ hours worked at the straight-time rate for second shift and after 7 hours worked at the straight-time rate for third shift.
  • k For building construction, rate applies to the first 2 hours prior to the start of the regular or approved day, or the first 4 hours after the end of the approved or regular work day, not to exceed a total of 4 hours in any 1 work day. For heavy, highway and engineering construction rate applies to the first 4 hours prior to the start of the regular or approved day, or the first 4 hours after the end of the approved or regular work day, not to exceed a total of 4 hours in any 1 work day

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Millwright, Northern California

  • Determination: NC-23-31-1-2026-2B
  • Region and counties: Northern California. 46 counties.
  • Issue date: October 30, 2026
  • Expiration date: June 30, 2027 (*)
  • Applies to: DIR's determination applies to projects advertised for bids on or after November 9, 2026.
  • Source: DIR determination PDF, NC-23-31-1-2026-2B

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, Sonoma
  • Area 2: Monterey, San Benito, Santa Cruz
  • Area 3: El Doradoa, Placera, Sacramento, San Joaquin, Yolo
  • Area 4: Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Doradoa, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Nevada, Placera, Plumas, Shasta, Sierra, Siskiyou, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yuba
ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherlHoursTotal hourly rateDaily (1 1/2X)d,eDaily (2X)dSaturday (1 1/2X)d,f,gSaturday (2X)d,fSunday/Holiday (2X)d,h
MillwrightArea 1$74.56$15.87$7.50$6.37$1.36$5.458.0$111.11$148.39$185.67$148.39$185.67$185.67
MillwrightArea 2$71.08$15.87$7.50$6.37$1.36$5.458.0$107.63$143.17$178.71$143.17$178.71$178.71
MillwrightArea 3$71.08$15.87$7.50$6.37$1.36$5.458.0$107.63$143.17$178.71$143.17$178.71$178.71
MillwrightArea 4$69.73$15.87$7.50$6.37$1.36$5.458.0$106.28$141.15$176.01$141.15$176.01$176.01

2nd Shifti

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherlHoursjTotal hourly rateDaily (1 1/2X)d,kDaily (2X)dSaturday (1 1/2X)d,f,gSaturday (2X)d,fSunday/Holiday (2X)d,h
MillwrightArea 1$79.53$15.87$7.50$6.37$1.36$5.457.5$116.08$148.39$185.67$148.39$185.67$185.67
MillwrightArea 2$75.82$15.87$7.50$6.37$1.36$5.457.5$112.37$143.17$178.71$143.17$178.71$178.71
MillwrightArea 3$75.82$15.87$7.50$6.37$1.36$5.457.5$112.37$143.17$178.71$143.17$178.71$178.71
MillwrightArea 4$74.38$15.87$7.50$6.37$1.36$5.457.5$110.93$141.15$176.01$141.15$176.01$176.01

3rd Shifti

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherlHoursjTotal hourly rateDaily (1 1/2X)d,kDaily (2X)dSaturday (1 1/2X)d,f,gSaturday (2X)d,fSunday/Holiday (2X)d,h
MillwrightArea 1$85.21$15.87$7.50$6.37$1.36$5.457.0$121.76$148.39$185.67$148.39$185.67$185.67
MillwrightArea 2$81.23$15.87$7.50$6.37$1.36$5.457.0$117.78$143.17$178.71$143.17$178.71$178.71
MillwrightArea 3$81.23$15.87$7.50$6.37$1.36$5.457.0$117.78$143.17$178.71$143.17$178.71$178.71
MillwrightArea 4$79.69$15.87$7.50$6.37$1.36$5.457.0$116.24$141.15$176.01$141.15$176.01$176.01

Footnotes as printed on the DIR determination PDF, NC-23-31-1-2026-2B

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Area 3 includes the portion of Placer County west of and including Highway 49 and the portion of El Dorado County west of and including Highway 49 and the territory inside the city limits of Placerville. Area 4 includes the portions of Placer and El Dorado Counties not covered in Area 3.
  • b Includes an amount per hour worked for Work Fees and Vacation.
  • d The overtime rates for shift work are based on the non-shift overtime rates.
  • e For building construction, rate applies to the first 4 hours daily overtime. For all heavy, highway and engineering construction overtime worked, Monday through Friday, rate applies to the first 4 hours daily overtime.
  • f In the event that work cannot be performed Monday through Friday because of inclement weather or major mechanical breakdown, employees may voluntarily make up such day on Saturday and shall be paid at the applicable straight time rates.
  • g Rate applies to the first 8 hours for building construction and for the first 10 hours worked on heavy, highway and engineering construction.
  • h Time and one-half shall be paid for the first eight (8) hours worked on the four (4) days of each year selected by the Union as designated off/holidays listed in the Holiday Provision.
  • i Does not apply to tenant improvement or renovation projects in occupied buildings with a total contract value of $5 million or less.
  • j Daily overtime applies after 7 ½ hours worked at the straight-time rate for second shift and after 7 hours worked at the straight-time rate for third shift.
  • k For building construction, rate applies to the first 2 hours prior to the start of the regular or approved day, or the first 4 hours after the end of the approved or regular work day, not to exceed a total of 4 hours in any 1 work day. For heavy, highway and engineering construction rate applies to the first 4 hours prior to the start of the regular or approved day, or the first 4 hours after the end of the approved or regular work day, not to exceed a total of 4 hours in any 1 work day
  • l Millwright Annuity Trust Fund, Industry Promotion, Carpenters International Training Fund, Work Preservation, and Vacation/Holiday/Sick Leave Admin.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Pile Driver (Carpenter)#, Northern California

  • Determination: NC-23-31-11-2026-2
  • Region and counties: Northern California. 46 counties.
  • Issue date: October 30, 2026
  • Expiration date: June 30, 2027 (*)
  • Applies to: DIR's determination applies to projects advertised for bids on or after November 9, 2026.
  • Source: DIR determination PDF, NC-23-31-11-2026-2

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

ClassificationBasic hourly rateHealth and welfarePensionaVacation and holidaybTrainingOthercHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)dSaturday Overtime Hourly Rate (1 ½ X)dSunday/Holiday Overtime Hourly Rate (2 X)
Pile Driver, Wharf, and Dock Buildere$73.71$15.87$12.95$7.48$1.41$0.458.0$111.87$148.73$148.73$185.58
Diver (wet) up to 50 ft depthf,g$123.23$15.87$12.95$7.48$1.41$0.458.0$161.39$223.01$223.01$284.62
Diver's Tenderf$81.08$15.87$12.95$7.48$1.41$0.458.0$119.24$159.78$159.78$200.32
Assistant Tender$73.71$15.87$12.95$7.48$1.41$0.458.0$111.87$148.73$148.73$185.58
Diver (stand-by)$82.08$15.87$12.95$7.48$1.41$0.458.0$120.24$161.28$161.28$202.32

Footnotes as printed on the DIR determination PDF, NC-23-31-11-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount per hour for Annuity Trust Fund. Pursuant to Labor Code Sections 1773.1 and 1773.8, the amount paid for this employer payment may vary resulting in a lower taxable basic hourly wage rate, but the total hourly rates for straight time and overtime may not be less than the general prevailing rate of per diem wages.
  • b Includes an amount per hour for work fees.
  • c Includes Industry Promotion, Carpenters International Training Fund, Pile Drivers Employers Contract Administration, Contract Work Preservation, Millwright Pile Driver Fund and Vacation/Holiday/Sick Leave Admin (VHSLA).
  • d Rate applies to the first 2 daily overtime hours and the first 8 hours worked on Saturdays. All other time is paid at the Sunday/Holiday overtime rate. For work associated with cast-in-place piles, drill shaft, Tubex piles, Tubex grout injection piles, geo piles, soil improvement piles, sand piles, augured cast in place piles, CISS and CIDH: Rate applies to all hours worked after 8 hours Monday-Friday and all hours worked on Saturday.
  • e On bridges, powerhouses and dams, men working from bosun’s chairs or swinging scaffolds or suspended from rope, cable, safety belts, or any device used as a substitute for or in lieu thereof (excluding piledriving rigs) shall receive $0.15 per hour above this rate.
  • f Shall receive a minimum of 8 hours pay for any day or part thereof worked.
  • g For specific rates over 50 ft depth, contact the Office of the Director - Research Unit.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Modular Furniture Installer (Carpenter)#, Northern California

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, Sonoma
  • Area 2: Monterey, San Benito, Santa Cruz
  • Area 3: Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Nevada, Placer, Plumas, Sacramento, San Joaquin, Shasta, Sierra, Siskiyou, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, Yuba
ClassificationArea or shiftBasic hourly rateHealth and welfarePensionaVacation and holidaybTrainingOtherHoursTotal hourly rateDaily (1 ½ X)Saturday (1 ½ X)cSunday/Holiday (2 X)
Master InstallerdArea 1$47.47$14.72$8.86$5.24$0.58$0.478.0$77.34$101.075$101.075$124.81
Lead InstallerdArea 1$43.25$14.72$8.86$5.24$0.58$0.478.0$73.12$94.745$94.745$116.37
InstallerdArea 1$39.80$14.72$8.36$5.24$0.58$0.478.0$69.17$89.07$89.07$108.97
Master InstallerdArea 2$43.75$14.72$8.86$5.24$0.58$0.478.0$73.62$95.495$95.495$117.37
Lead InstallerdArea 2$40.12$14.72$8.86$5.24$0.58$0.478.0$69.99$90.05$90.05$110.11
InstallerdArea 2$37.15$14.72$8.36$5.24$0.58$0.478.0$66.52$85.095$85.095$103.67
Master InstallerdArea 3$42.42$14.72$8.86$5.24$0.58$0.478.0$72.29$93.50$93.50$114.71
Lead InstallerdArea 3$39.00$14.72$8.86$5.24$0.58$0.478.0$68.87$88.37$88.37$107.87
InstallerdArea 3$36.20$14.72$8.36$5.24$0.58$0.478.0$65.57$83.67$83.67$101.77

Footnotes as printed on the DIR determination PDF, NC-23-31-15-2026-1

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount for Annuity Trust Fund.
  • b Includes an amount for Work Fee.
  • c Rate applies for the first 10 hours only. All hours worked in excess of ten hours on Saturdays shall be paid at double time (2X).
  • d Area 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma Counties. Area 2: Monterey, San Benito, and Santa Cruz Counties. Area 3: Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Nevada, Placer, Plumas, Sacramento, San Joaquin, Shasta, Sierra, Siskiyou, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Drywall Installer/Lather (Carpenter)#, Northern California

  • Determination: NC-31-X-16-2026-2
  • Region and counties: Northern California. 46 counties.
  • Issue date: October 30, 2026
  • Expiration date: June 30, 2027 (*)
  • Applies to: DIR's determination applies to projects advertised for bids on or after November 9, 2026.
  • Source: DIR determination PDF, NC-31-X-16-2026-2

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: All localities within Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma Counties.
  • Area 2: All localities within Monterey, San Benito, and Santa Cruz Counties.
  • Area 3: All localities within El Dorado (a), Placer (a), Sacramento, San Joaquin and Yolo Counties.
  • Area 4: All localities within Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado (a), Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Nevada, Placer (a), Plumas, Shasta, Sierra, Siskiyou, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, and Yuba Counties.
ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)cSaturday Overtime Hourly Rate (1 ½ X)cSunday/Holiday Overtime Hourly Rate (2 X)
Drywall Installer/LatherArea 1$74.46$15.87$11.50$6.28$1.30$1.378.0$110.78$148.01$148.01$185.24
Stocker/ScrapperdArea 1$37.23$15.87$7.93$6.23$0.00$0.108.0$67.36$85.98$85.98$104.59
Stocker/ScrapperArea 1$37.23$15.87$2.25$6.23$0.00$0.108.0$61.68$80.30$80.30$98.91
Drywall Installer/LatherArea 2$68.58$15.87$11.50$6.28$1.30$1.378.0$104.90$139.19$139.19$173.48
Stocker/ScrapperdArea 2$34.29$15.87$7.93$6.23$0.00$0.108.0$64.42$81.57$81.57$98.71
Stocker/ScrapperArea 2$34.29$15.87$2.25$6.23$0.00$0.108.0$58.74$75.89$75.89$93.03
Drywall Installer/LatherArea 3$69.08$15.87$11.50$6.28$1.30$1.378.0$105.40$139.94$139.94$174.48
Stocker/ScrapperdArea 3$34.54$15.87$7.93$6.23$0.00$0.108.0$64.67$81.94$81.94$99.21
Stocker/ScrapperArea 3$34.54$15.87$2.25$6.23$0.00$0.108.0$58.99$76.26$76.26$93.53
Drywall Installer/LatherArea 4$67.73$15.87$11.50$6.28$1.30$1.378.0$104.05$137.92$137.92$171.78
Stocker/ScrapperdArea 4$33.87$15.87$7.93$6.23$0.00$0.108.0$64.00$80.94$80.94$97.87
Stocker/ScrapperArea 4$33.87$15.87$2.25$6.23$0.00$0.108.0$58.32$75.26$75.26$92.19

Wages and Employer Payments (2nd Shift)

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHourseTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)f,gSaturday Overtime Hourly Rate (1 ½ X)gSunday/Holiday Overtime Hourly Rate (2 X)h
Drywall Installer/LatherArea 1$79.42$15.87$11.50$6.28$1.30$1.377.5$115.74$148.01$148.01$185.24
Stocker/ScrapperdArea 1$39.71$15.87$7.93$6.23$0.00$0.107.5$69.84$85.98$85.95$104.59
Stocker/ScrapperArea 1$39.71$15.87$2.25$6.23$0.00$0.107.5$64.16$80.30$80.30$98.91
Drywall Installer/LatherArea 2$73.15$15.87$11.50$6.28$1.30$1.377.5$109.47$139.19$139.19$173.48
Stocker/ScrapperdArea 2$36.58$15.87$7.93$6.23$0.00$0.107.5$66.71$81.57$81.57$98.71
Stocker/ScrapperArea 2$36.58$15.87$2.25$6.23$0.00$0.107.5$61.03$75.89$75.89$93.03
Drywall Installer/LatherArea 3$73.69$15.87$11.50$6.28$1.30$1.377.5$110.01$139.94$139.94$174.48
Stocker/ScrapperdArea 3$36.84$15.87$7.93$6.23$0.00$0.107.5$66.97$81.94$81.94$99.21
Stocker/ScrapperArea 3$36.84$15.87$2.25$6.23$0.00$0.107.5$61.29$76.26$76.26$93.53
Drywall Installer/LatherArea 4$72.25$15.87$11.50$6.28$1.30$1.377.5$108.57$137.92$137.92$171.78
Stocker/ScrapperdArea 4$36.13$15.87$7.93$6.23$0.00$0.107.5$66.26$80.94$80.94$97.87
Stocker/ScrapperArea 4$36.13$15.87$2.25$6.23$0.00$0.107.5$60.58$75.26$75.26$92.19

Wages and Employer Payments (3rd Shift)

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHourseTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)f,iSaturday Overtime Hourly Rate (1 ½ X)f,iSunday/Holiday Overtime Hourly Rate (2 X)j
Drywall Installer/LatherArea 1$85.10$15.87$11.50$6.28$1.30$1.377.0$121.42$148.01$148.01$185.24
Stocker/ScrapperdArea 1$42.55$15.87$7.93$6.23$0.00$0.107.0$72.68$85.98$85.98$104.59
Stocker/ScrapperArea 1$42.55$15.87$2.25$6.23$0.00$0.107.0$67.00$80.30$80.30$98.91
Drywall Installer/LatherArea 2$78.38$15.87$11.50$6.28$1.30$1.377.0$114.70$139.19$139.19$173.48
Stocker/ScrapperdArea 2$39.19$15.87$7.93$6.23$0.00$0.107.0$69.32$81.57$81.57$98.71
Stocker/ScrapperArea 2$39.19$15.87$2.25$6.23$0.00$0.107.0$63.64$75.89$75.89$93.03
Drywall Installer/LatherArea 3$78.95$15.87$11.50$6.28$1.30$1.377.0$115.27$139.94$139.94$174.48
Stocker/ScrapperdArea 3$39.47$15.87$7.93$6.23$0.00$0.107.0$69.60$81.94$81.94$99.21
Stocker/ScrapperArea 3$39.47$15.87$2.25$6.23$0.00$0.107.0$63.92$76.26$76.26$93.53
Drywall Installer/LatherArea 4$77.41$15.87$11.50$6.28$1.30$1.377.0$113.73$137.92$137.92$171.78
Stocker/ScrapperdArea 4$38.71$15.87$7.93$6.23$0.00$0.107.0$68.84$80.94$80.94$97.87
Stocker/ScrapperArea 4$38.71$15.87$2.25$6.23$0.00$0.107.0$63.16$75.26$75.26$92.19

Footnotes as printed on the DIR determination PDF, NC-31-X-16-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (https://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Area 3 includes the portion of Placer County west of and including Highway 49 and the portion of El Dorado County west of and including Highway 49 and the territory inside the city limits of Placerville. Area 4 includes the portions of Placer and El Dorado Counties not covered in Area 3.
  • b Includes an amount for Work Fees.
  • c Rate applies to the first 4 overtime hours Monday through Friday and the first 8 hours on Saturday. All other time is paid at the Sunday and Holiday overtime rate. Saturdays may be worked at straight time if job is shut down during Monday through Friday due to inclement weather or major mechanical breakdown.
  • d Employed for 2000 hours (consecutively or cumulatively).
  • e Daily overtime applies after 7 ½ hours worked at the straight-time rate for second shift and after 7 hours worked at the straight-time rate for third shift.
  • f The overtime rates for shift work are based on the non-shift overtime rates.
  • g Rate applies to the first 4 overtime hours Monday through Friday and the first 7.5 hours on Saturday. All other time is paid at the Sunday and Holiday overtime rate. Saturdays may be worked at straight time if job is shut down during Monday through Friday due to inclement weather or major mechanical breakdown.
  • h Time and one-half shall be paid for the first 7.5 hours worked on the four (4) days of each year selected by the Union as designated off/holidays listed in the Holiday Provision.
  • i Rate applies to the first 4 overtime hours Monday through Friday and the first 7 hours on Saturday. All other time is paid at the Sunday and Holiday overtime rate. Saturdays may be worked at straight time if job is shut down during Monday through Friday due to inclement weather or major mechanical breakdown.
  • j Time and one-half shall be paid for the first 7 hours worked on the four (4) days of each year selected by the Union as designated off/holidays listed in the Holiday Provision.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Modular Furniture Installer (Carpenter)#, Southern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (12)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Diego; San Luis Obispo; Santa Barbara; Ventura

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidayaTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)b6th Workday Overtime Hourly Rate (1 ½ X)b7th Workday/Holiday Overtime Hourly Rate (2 X)
Modular Installer: Installer$27.00$7.80$3.00$3.85$0.10$0.038.0$41.78$55.28$55.28$68.78
Modular Installer: Lead Installer$29.00$7.80$3.00$3.85$0.10$0.038.0$43.78$58.28$58.28$72.78

Footnotes as printed on the DIR determination PDF, SC-23-31-16-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount for Supplemental Dues.
  • b Rate applies to the first 4 daily overtime hours and first 12 hours worked on a sixth (6th) consecutive day. All other daily overtime is paid the 7th Workday/Holiday rate.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Carpenter and Related Trades#, Southern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (11)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Luis Obispo; Santa Barbara; Ventura

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidayaTrainingOtherbHoursTotal hourly rateDaily (1 ½ X)cSaturday (1 ½ X)dSunday/Holiday (2 X)
Carpentere,f, Cabinet Installer, Insulation Installer, Hardwood Floor Worker, Acoustical Installer$54.41$10.25$6.41$7.57$0.79$4.898.0$84.32$111.525$111.525$138.73
Pile Drivermang, Derrick Bargeman, Rockslinger, Bridge or Dock Carpenter, Cable Splicer$54.54$10.25$6.41$7.57$0.79$4.898.0$84.45$111.72$111.72$138.99
Bridge Carpentere$54.54$10.25$6.41$7.57$0.79$4.898.0$84.45$111.72$111.72$138.99
Shinglere$54.54$10.25$6.41$7.57$0.79$4.898.0$84.45$111.72$111.72$138.99
Saw Filer$54.50$10.25$6.41$7.57$0.79$4.898.0$84.41$111.66$111.66$138.91
Table Power Saw Operator$54.51$10.25$6.41$7.57$0.79$4.898.0$84.42$111.675$111.675$138.93
Pneumatic Nailer or Power Stapler$54.54$10.25$6.41$7.57$0.79$4.898.0$84.45$111.72$111.72$138.99
Roof Loader of Shingles$38.09$10.25$6.41$7.57$0.79$4.818.0$67.92$86.965$86.965$106.01
Scaffold Builder$47.54$10.00$6.41$7.53$0.79$4.398.0$76.66$100.43$100.43$124.20
Millwrighte$54.91$10.25$6.41$7.57$0.99$4.898.0$85.02$116.26$116.26$147.50
Head Rockslinger$54.64$10.25$6.41$7.57$0.79$4.898.0$84.55$111.87$111.87$139.19
Rock Bargeman or Scowman$54.44$10.25$6.41$7.57$0.79$4.898.0$84.35$111.57$111.57$138.79
Diver, Wet (Up To 50 Ft. Depth)h,i$114.91$10.25$6.41$7.57$0.79$4.898.0$144.82$202.275$202.275$259.73
Diver, (Stand-By)h,i$58.57$10.25$6.41$7.57$0.79$4.898.0$88.48$117.765$117.765$147.05
Diver's Tenderh$57.54$10.25$6.41$7.57$0.79$4.898.0$87.45$116.22$116.22$144.99

Footnotes as printed on the DIR determination PDF, SC-23-31-2-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes amounts for Vacation and Supplemental Dues. For Millwright only, Vacation is factored at the applicable overtime multiplier.
  • b Includes an amount for Annuity.
  • c All overtime worked Mon - Fri shall be paid at 1 1/2 times the straight time rate for the first four (4) hours and double (2x) the straight time for work performed after twelve (12) hours.
  • d First eight (8) hours worked paid at 1 1/2 times the straight time rate, all hours after that paid at double (2x) the straight time rate. Saturdays in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather, major mechanical breakdown or lack of materials beyond the control of the Employer.
  • e When performing welding work requiring certification, classification will receive an additional $1.00 per hour.
  • f A Carpenter who performs work of forming in the construction of open cut sewers or storm drains shall receive a premium of thirteen cents ($0.13) per hour in addition to his Carpenter's scale. This premium shall apply only on an operation in which horizontal lagging is used in conjunction with Steel H-Beams driven or placed in pre-drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a substitute for back forms, which work is performed by pile drivers.
  • g When performing welding work requiring certification, classification will receive an additional $1.00 per hour. An additional $0.50 per hour when handling or working with new pressure-treated creosote piling or timber, or driving of used pressure-treated creosote piling.
  • h Shall receive a minimum of 8 hours pay for any day or part thereof.
  • i For specific rates over 50 ft depth, contact the Office of the Director - Research Unit. Rates for Technicians, Manifold Operators, Pressurized Submersible Operators, Remote Control Vehicle Operators, and Remote Operated Vehicle Operators, as well as rates for Pressurized Bell Diving and Saturation Diving are available upon request.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Fence Builder (Carpenter)#, Southern California

Expired on June 30, 2026 This determination's expiration date is before the date these pages were built (November 13, 2026), so the figures below may no longer be the ones to use on a current bid. The asterisk explanation below says why. Check DIR's current list for a newer determination.

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (12)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Diego; San Luis Obispo; Santa Barbara; Ventura

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidayTrainingOtheraHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)bSaturday Overtime Hourly Rate (1 ½ X)cSunday/ Holiday Overtime Hourly Rate
Fence Builder$48.25$9.50$6.25$7.21$0.72$4.268.0$76.19$100.315$100.315$124.44

Footnotes as printed on the DIR determination PDF, SC-23-31-20-2026-1

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount for Annuity.
  • b Rate applies to the first 4 overtime hours. All other time is paid at the Sunday and Holiday overtime hourly rate.
  • c Saturdays in the same work week may be worked at straight-time for the first 8 hours if the job is shut down during the normal work week due to inclement weather, or reasons beyond the control of the employer.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Drywall Installer/Lather (Carpenter)#, Southern California

  • Determination: SC-31-X-41-2026-2
  • Region and counties: Southern California. 11 counties.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (**)
  • Printed in the same PDF: SC-31-X-41-2026-2A, each in its own section on this page.
  • Source: DIR determination PDF, SC-31-X-41-2026-2

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (11)

Imperial County; Inyo County; Kern County; Los Angeles County; Mono County; Orange County; Riverside County; San Bernardino County; San Luis Obispo County; Santa Barbara County; Ventura County

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidayaTrainingOtherbHoursTotal hourly rateDaily (1 ½ X)cSaturday (1 ½ X)cSunday/Holiday (2 X)
Drywall Installer/Lather$54.41$10.25$6.41$7.57$0.79$5.228.0$84.65$111.855$111.855$139.06

Footnotes as printed on the DIR determination PDF, SC-31-X-41-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount per hour worked for supplemental dues.
  • b Includes an amount for Annuity.
  • c Rate applies to the first 4 daily overtime hours and to the first 8 hours on Saturday. All other overtime will be paid the Sunday and Holiday double time rate. Saturdays in the same workweek may be worked at straight-time if job is shut down during the normal work week due to inclement weather.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Stocker, Scrapper (Carpenter), Southern California

  • Determination: SC-31-X-41-2026-2A
  • Region and counties: Southern California. 11 counties.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (*)
  • Printed in the same PDF: SC-31-X-41-2026-2, each in its own section on this page.
  • Source: DIR determination PDF, SC-31-X-41-2026-2A

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (11)

Imperial County; Inyo County; Kern County; Los Angeles County; Mono County; Orange County; Riverside County; San Bernardino County; San Luis Obispo County; Santa Barbara County; Ventura County

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidayaTrainingOtherHoursTotal hourly rateDaily (1 ½ X)cSaturday (1 ½ X)cSunday/Holiday (2 X)
Stocker, Scrapper$21.97$6.25$0.00$8.57$0.79$0.008.0$37.58$48.565$48.565$59.55

Footnotes as printed on the DIR determination PDF, SC-31-X-41-2026-2A

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount per hour worked for supplemental dues.
  • b Includes an amount for Annuity.
  • c Rate applies to the first 4 daily overtime hours and to the first 8 hours on Saturday. All other overtime will be paid the Sunday and Holiday double time rate. Saturdays in the same workweek may be worked at straight-time if job is shut down during the normal work week due to inclement weather.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Carpenter#, San Diego

  • Determination: SD-23-31-4-2026-2
  • Region and counties: San Diego. 1 county.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (**)
  • Printed in the same PDF: SD-23-31-4-2026-2A, each in its own section on this page.
  • Source: DIR determination PDF, SD-23-31-4-2026-2

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (1)

All localities within San Diego County

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidayaTrainingOtherbHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)cSaturday Overtime Hourly Rate (1 ½ X)cSunday/Holiday Overtime Hourly Rate (2 X)
Carpenter (Heavy and Highway Work)Engineering Construction$54.41$10.25$6.41$7.57$0.79$4.898.0$84.32$111.525$111.525$138.73
Bridge Carpenter (Highway Work)Engineering Construction$54.54$10.25$6.41$7.57$0.79$4.898.0$84.45$111.72$111.72$138.99
MillwrightEngineering Construction$54.91$10.25$6.41$7.57$0.99$4.898.0$85.02$116.26$116.26$147.50
Pile DriverdEngineering Construction$54.54$10.25$6.41$7.57$0.79$4.898.0$84.45$111.72$111.72$138.99
Diver, Wet (up to 50ft. depth)e,fEngineering Construction$114.91$10.25$6.41$7.57$0.79$4.898.0$144.82$202.275$202.275$259.73
Diver, Standbye,fEngineering Construction$58.57$10.25$6.41$7.57$0.79$4.898.0$88.48$117.765$117.765$147.05
Diver's TendereEngineering Construction$57.54$10.25$6.41$7.57$0.79$4.898.0$87.45$116.22$116.22$144.99

Footnotes as printed on the DIR determination PDF, SD-23-31-4-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes amounts for Vacation and Supplemental Dues. For Millwright only, Vacation is factored at the applicable overtime multiplier.
  • b Includes an amount for Annuity.
  • c Rate only applies to the first 4 daily overtime hours and the first 8 hours on Saturday; all other time is paid at the Sunday/Holiday rate. Saturday in the same workweek may be worked at straight-time rate for the first 8 hours if the employee was unable to complete the 40 hours during the normal workweek for reasons beyond the control of the Employer, such as inclement weather. In addition, for Building Construction only, reasons can be due to major mechanical breakdown or lack of materials beyond the control of the Employer or because the employee voluntarily chooses to miss a scheduled workday, he may voluntarily work on Saturdays at straight time rate.
  • d An additional $0.50 per hour when handling or working with new pressure-treated creosote piling or timber, or driving of used pressure-treated creosote piling.
  • e Shall receive a minimum of 8 hours pay for any day or part thereof.
  • f For specific rates over 50 ft. depth, contact the Office of the Director - Research Unit. Rates for Technicians, Manifold Operators, Pressurized Submersible Operators, Remote Control Vehicle Operators, and Remote Operated Vehicle Operators, as well as rates for Pressurized Bell Diving and Saturation Diving are available upon request.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Carpenter (Building Construction)#, San Diego

  • Determination: SD-23-31-4-2026-2A
  • Region and counties: San Diego. 1 county.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (**)
  • Printed in the same PDF: SD-23-31-4-2026-2, each in its own section on this page.
  • Source: DIR determination PDF, SD-23-31-4-2026-2A

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (1)

All localities within San Diego County

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidayaTrainingOtherbHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)gSaturday Overtime Hourly Rate (1 ½ X)gSunday/Holiday Overtime Hourly Rate (2 X)
CarpenterBuilding Construction$51.11$10.25$6.41$7.57$0.79$4.588.0$80.71$106.265$106.265$131.82
Light CommercialBuilding Construction$40.89$10.25$6.41$7.57$0.79$4.588.0$70.49$90.935$90.935$111.38

Footnotes as printed on the DIR determination PDF, SD-23-31-4-2026-2A

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes amounts for Vacation and Supplemental Dues. For Millwright only, Vacation is factored at the applicable overtime multiplier.
  • b Includes an amount for Annuity.
  • g Rate only applies to the first 4 daily overtime hours and the first 8 hours on Saturday; all other time is paid at the Sunday/Holiday rate. Saturday in the same workweek may be worked at straight-time rate for the first 8 hours if the employee was unable to complete the 40 hours during the normal workweek due to inclement weather, major mechanical breakdown or lack of materials beyond the control of the Employer or because the employee voluntarily chooses to miss a scheduled workday, he may voluntarily work on Saturdays at straight time rate.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Drywall Installer/Lather (Carpenter)#, San Diego

  • Determination: SD-31-X-41-2026-2
  • Region and counties: San Diego. 1 county.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (**)
  • Printed in the same PDF: SD-31-X-41-2026-2A, each in its own section on this page.
  • Source: DIR determination PDF, SD-31-X-41-2026-2

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (1)

San Diego County

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidayaTrainingOtherbHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)cSaturday Overtime Hourly Rate (1 ½ X)cSunday/Holiday Overtime Hourly Rate (2 X)
Drywall Installer/Latherer (Journeyperson)$47.65$10.25$6.41$8.53$0.79$5.008.0$78.63$102.455$102.455$126.28

Footnotes as printed on the DIR determination PDF, SD-31-X-41-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount for Supplemental Dues.
  • b Includes an amount for Annuity.
  • c Rate applies to the first 4 daily overtime hours and to the first 8 hours on Saturday. All other overtime will be paid the Sunday and Holiday double time rate. Saturdays in the same workweek may be worked at straight-time if job is shut down during the normal work week due to inclement weather.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Stocker, Scrapper (Carpenter)#, San Diego

  • Determination: SD-31-X-41-2026-2A
  • Region and counties: San Diego. 1 county.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (*)
  • Printed in the same PDF: SD-31-X-41-2026-2, each in its own section on this page.
  • Source: DIR determination PDF, SD-31-X-41-2026-2A

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (1)

San Diego County

ClassificationBasic hourly rateHealth and welfarePensionVacation and holidayaTrainingOtherbHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)cSaturday Overtime Hourly Rate (1 ½ X)cSunday/Holiday Overtime Hourly Rate (2 X)Footnotes
Stocker/Scrapper (Journeyperson)$21.97$6.25$0.00$9.53$0.79$0.208.0$38.74$49.725$49.725$60.71Printed under determination SD-31-X-41-2026-2A (expiry marker *), not SD-31-X-41-2026-2

Footnotes as printed on the DIR determination PDF, SD-31-X-41-2026-2A

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount for Supplemental Dues.
  • b Includes an amount for Annuity.
  • c Rate applies to the first 4 daily overtime hours and to the first 8 hours on Saturday. All other overtime will be paid the Sunday and Holiday double time rate. Saturdays in the same workweek may be worked at straight-time if job is shut down during the normal work week due to inclement weather.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Counties these determinations cover

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. 8 CCR 16204 dir.ca.gov
  2. important notices page dir.ca.gov
  3. DIR determination PDF, NC-23-31-1-2026-2 dir.ca.gov
  4. DIR determination PDF, NC-23-31-11-2026-2 dir.ca.gov
  5. DIR determination PDF, NC-23-31-15-2026-1 dir.ca.gov
  6. DIR determination PDF, NC-31-X-16-2026-2 dir.ca.gov
  7. DIR determination PDF, SC-23-31-16-2026-2 dir.ca.gov
  8. DIR determination PDF, SC-23-31-2-2026-2 dir.ca.gov
  9. DIR determination PDF, SC-23-31-20-2026-1 dir.ca.gov
  10. DIR determination PDF, SC-31-X-41-2026-2 dir.ca.gov
  11. DIR determination PDF, SD-23-31-4-2026-2 dir.ca.gov
  12. DIR determination PDF, SD-31-X-41-2026-2 dir.ca.gov

Paying these rates on a public job? First filing free

Send the payroll export you already run. We turn it into the WH-347 and the DIR eCPR filing, checked by software and verified by a person. First filing free, before you pay us anything. $995 one time setup, then $249 per month flat for crews up to 25 workers.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallFirst filing free