Operating Engineer prevailing wage in California, 2026: rates by area

These are DIR's published general determination figures as of the issue date shown on each one. The rate for a job depends on the bid advertisement date and the determination in the bid documents (see how to read a determination), so confirm every figure on the DIR PDF linked in the section before you bid or pay.

DIR 2026-2 determinations, extracted November 13, 2026

The short answer

DIR's 2026-2 determinations on this page cover 15 different crafts and craft sections, so no single rate range is given. Each section below lists its own classifications, areas and rates; confirm your craft's rate on the DIR PDF.

  • No single range: this page holds different crafts, so read your own craft's section below.
  • Areas: Northern California; Southern California; San Diego; each section below lists its counties, issue date and expiration date.
  • Under 8 CCR 16204(a)(1), a call for bids put out on or after a determination's effective date must reflect that determination.
  • Between issues, DIR can issue interim determinations, corrections, and modifications, which it lists on its important notices page.
  • Expired determinations: NC-63-3-12-2025-1 expired July 31, 2026; SC-63-12-33-2026-2 expired October 31, 2026; SC-63-12-41-2025-1 expired June 30, 2026. Each is marked in its section below with the asterisk explanation.

Determinations for operating engineer

Each section below is one determination, headed by the determination number printed on DIR's PDF for operating engineer. A PDF can print more than one determination, and each one has its own section here; a PDF can also hold determinations for other crafts that this page does not list, so open the PDF linked in each section for any others. Pick the one for your county and craft scope; which craft classification applies is its own question. DIR lists any interim determination, correction or modification on its important notices page, so check it before you rely on a figure.

Operating Engineer (Heavy and Highway Work)#, Northern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba Counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed below)
  • Area 2: Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed below) Area 2 shall be all areas not part of Area 1.

Township and boundary descriptions of Area 1 (and Area 2 as all areas not part of Area 1) are printed on PDF pages 7 to 10.

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaydTrainingOtherHoursbTotal hourly rateDaily/Saturday Overtime Hourly Rate (1½ X)cSunday/Holiday Overtime Hourly Rate (2X)
Group 1Area 1$70.37$13.88$13.28$6.19$1.31$1.638$106.66$141.85$177.03
Group 2Area 1$68.84$13.88$13.28$6.19$1.31$1.638$105.13$139.55$173.97
Group 3Area 1$67.36$13.88$13.28$6.19$1.31$1.638$103.65$137.33$171.01
Group 4Area 1$65.98$13.88$13.28$6.19$1.31$1.638$102.27$135.26$168.25
Group 5Area 1$64.71$13.88$13.28$6.19$1.31$1.638$101.00$133.36$165.71
Group 6Area 1$63.39$13.88$13.28$6.19$1.31$1.638$99.68$131.38$163.07
Group 7Area 1$62.25$13.88$13.28$6.19$1.31$1.638$98.54$129.67$160.79
Group 8Area 1$61.11$13.88$13.28$6.19$1.31$1.638$97.40$127.96$158.51
Group 8-AArea 1$58.90$13.88$13.28$6.19$1.31$1.638$95.19$124.64$154.09
ALL CRANES & ATTACHMENTS Group 1Area 1$72.00$13.88$13.28$6.19$1.31$1.638$108.29$144.29$180.29
ALL CRANES & ATTACHMENTS Group 1: Truck Crane Assistant to EngineerArea 1$65.03$13.88$13.28$6.19$1.31$1.638$101.32$133.84$166.35
ALL CRANES & ATTACHMENTS Group 1: Assistant to EngineerArea 1$62.74$13.88$13.28$6.19$1.31$1.638$99.03$130.40$161.77
Group 1-AArea 1$71.25$13.88$13.28$6.19$1.31$1.638$107.54$143.17$178.79
Group 1-A: Truck Crane Assistant to EngineerArea 1$64.28$13.88$13.28$6.19$1.31$1.638$100.57$132.71$164.85
Group 1-A: Assistant to EngineerArea 1$61.99$13.88$13.28$6.19$1.31$1.638$98.28$129.28$160.27
Group 2-AArea 1$69.49$13.88$13.28$6.19$1.31$1.638$105.78$140.53$175.27
Group 2-A: Truck Crane Assistant to EngineerArea 1$64.02$13.88$13.28$6.19$1.31$1.638$100.31$132.32$164.33
Group 2-A: Assistant to EngineerArea 1$61.78$13.88$13.28$6.19$1.31$1.638$98.07$128.96$159.85
Group 3-AArea 1$67.75$13.88$13.28$6.19$1.31$1.638$104.04$137.92$171.79
Group 3-A: Truck Crane Assistant to EngineerArea 1$63.78$13.88$13.28$6.19$1.31$1.638$100.07$131.96$163.85
Group 3-A: HydraulicArea 1$63.39$13.88$13.28$6.19$1.31$1.638$99.68$131.38$163.07
Group 3-A: Assistant to EngineerArea 1$61.50$13.88$13.28$6.19$1.31$1.638$97.79$128.54$159.29
Group 4-AArea 1$64.71$13.88$13.28$6.19$1.31$1.638$101.00$133.36$165.71
Group 1Area 2$72.37$13.88$13.28$6.19$1.31$1.638$108.66$144.85$181.03
Group 2Area 2$70.84$13.88$13.28$6.19$1.31$1.638$107.13$142.55$177.97
Group 3Area 2$69.36$13.88$13.28$6.19$1.31$1.638$105.65$140.33$175.01
Group 4Area 2$67.98$13.88$13.28$6.19$1.31$1.638$104.27$138.26$172.25
Group 5Area 2$66.71$13.88$13.28$6.19$1.31$1.638$103.00$136.36$169.71
Group 6Area 2$65.39$13.88$13.28$6.19$1.31$1.638$101.68$134.38$167.07
Group 7Area 2$64.25$13.88$13.28$6.19$1.31$1.638$100.54$132.67$164.79
Group 8Area 2$63.11$13.88$13.28$6.19$1.31$1.638$99.40$130.96$162.51
Group 8-AArea 2$60.90$13.88$13.28$6.19$1.31$1.638$97.19$127.64$158.09
ALL CRANES & ATTACHMENTS Group 1Area 2$74.00$13.88$13.28$6.19$1.31$1.638$110.29$147.29$184.29
ALL CRANES & ATTACHMENTS Group 1: Truck Crane Assistant to EngineerArea 2$67.03$13.88$13.28$6.19$1.31$1.638$103.32$136.84$170.35
ALL CRANES & ATTACHMENTS Group 1: Assistant to EngineerArea 2$64.74$13.88$13.28$6.19$1.31$1.638$101.03$133.40$165.77
Group 1-AArea 2$73.25$13.88$13.28$6.19$1.31$1.638$109.54$146.17$182.79
Group 1-A: Truck Crane Assistant to EngineerArea 2$66.28$13.88$13.28$6.19$1.31$1.638$102.57$135.71$168.85
Group 1-A: Assistant to EngineerArea 2$63.99$13.88$13.28$6.19$1.31$1.638$100.28$132.28$164.27
Group 2-AArea 2$71.49$13.88$13.28$6.19$1.31$1.638$107.78$143.53$179.27
Group 2-A: Truck Crane Assistant to EngineerArea 2$66.02$13.88$13.28$6.19$1.31$1.638$102.31$135.32$168.33
Group 2-A: Assistant to EngineerArea 2$63.78$13.88$13.28$6.19$1.31$1.638$100.07$131.96$163.85
Group 3-AArea 2$69.75$13.88$13.28$6.19$1.31$1.638$106.04$140.92$175.79
Group 3-A: Truck Crane Assistant to EngineerArea 2$65.78$13.88$13.28$6.19$1.31$1.638$102.07$134.96$167.85
Group 3-A: HydraulicArea 2$65.39$13.88$13.28$6.19$1.31$1.638$101.68$134.38$167.07
Group 3-A: Assistant to EngineerArea 2$63.50$13.88$13.28$6.19$1.31$1.638$99.79$131.54$163.29
Group 4-AArea 2$66.71$13.88$13.28$6.19$1.31$1.638$103.00$136.36$169.71

Special Single and Second Shift#

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaydTrainingOtherHoursTotal hourly rateDaily/Saturday Overtime Hourly Rate (1½ X)cSunday/Holiday Overtime Hourly Rate (2X)
Group 1Area 1$77.37$13.88$13.28$6.19$1.31$1.638$113.66$152.35$191.03
Group 2Area 1$75.84$13.88$13.28$6.19$1.31$1.638$112.13$150.05$187.97
Group 3Area 1$74.36$13.88$13.28$6.19$1.31$1.638$110.65$147.83$185.01
Group 4Area 1$72.98$13.88$13.28$6.19$1.31$1.638$109.27$145.76$182.25
Group 5Area 1$71.71$13.88$13.28$6.19$1.31$1.638$108.00$143.86$179.71
Group 6Area 1$70.39$13.88$13.28$6.19$1.31$1.638$106.68$141.88$177.07
Group 7Area 1$69.25$13.88$13.28$6.19$1.31$1.638$105.54$140.17$174.79
Group 8Area 1$68.11$13.88$13.28$6.19$1.31$1.638$104.40$138.46$172.51
Group 8-AArea 1$65.90$13.88$13.28$6.19$1.31$1.638$102.19$135.14$168.09
ALL CRANES & ATTACHMENTS Group 1Area 1$79.00$13.88$13.28$6.19$1.31$1.638$115.29$154.79$194.29
ALL CRANES & ATTACHMENTS Group 1: Truck Crane Assistant to EngineerArea 1$72.03$13.88$13.28$6.19$1.31$1.638$108.32$144.34$180.35
ALL CRANES & ATTACHMENTS Group 1: Assistant to EngineerArea 1$69.74$13.88$13.28$6.19$1.31$1.638$106.03$140.90$175.77
Group 1-AArea 1$78.25$13.88$13.28$6.19$1.31$1.638$114.54$153.67$192.79
Group 1-A: Truck Crane Assistant to EngineerArea 1$71.28$13.88$13.28$6.19$1.31$1.638$107.57$143.21$178.85
Group 1-A: Assistant to EngineerArea 1$68.99$13.88$13.28$6.19$1.31$1.638$105.28$139.78$174.27
Group 2-AArea 1$76.49$13.88$13.28$6.19$1.31$1.638$112.78$151.03$189.27
Group 2-A: Truck Crane Assistant to EngineerArea 1$71.02$13.88$13.28$6.19$1.31$1.638$107.31$142.82$178.33
Group 2-A: Assistant to EngineerArea 1$68.78$13.88$13.28$6.19$1.31$1.638$105.07$139.46$173.85
Group 3-AArea 1$74.75$13.88$13.28$6.19$1.31$1.638$111.04$148.42$185.79
Group 3-A: Truck Crane Assistant to EngineerArea 1$70.78$13.88$13.28$6.19$1.31$1.638$107.07$142.46$177.85
Group 3-A: HydraulicArea 1$70.39$13.88$13.28$6.19$1.31$1.638$106.68$141.88$177.07
Group 3-A: Assistant to EngineerArea 1$68.50$13.88$13.28$6.19$1.31$1.638$104.79$139.04$173.29
Group 4-AArea 1$71.71$13.88$13.28$6.19$1.31$1.638$108.00$143.86$179.71
Group 1Area 2$79.37$13.88$13.28$6.19$1.31$1.638$115.66$155.35$195.03
Group 2Area 2$77.84$13.88$13.28$6.19$1.31$1.638$114.13$153.05$191.97
Group 3Area 2$76.36$13.88$13.28$6.19$1.31$1.638$112.65$150.83$189.01
Group 4Area 2$74.98$13.88$13.28$6.19$1.31$1.638$111.27$148.76$186.25
Group 5Area 2$73.71$13.88$13.28$6.19$1.31$1.638$110.00$146.86$183.71
Group 6Area 2$72.39$13.88$13.28$6.19$1.31$1.638$108.68$144.88$181.07
Group 7Area 2$71.25$13.88$13.28$6.19$1.31$1.638$107.54$143.17$178.79
Group 8Area 2$70.11$13.88$13.28$6.19$1.31$1.638$106.40$141.46$176.51
Group 8-AArea 2$67.90$13.88$13.28$6.19$1.31$1.638$104.19$138.14$172.09
ALL CRANES & ATTACHMENTS Group 1Area 2$81.00$13.88$13.28$6.19$1.31$1.638$117.29$157.79$198.29
ALL CRANES & ATTACHMENTS Group 1: Truck Crane Assistant to EngineerArea 2$74.03$13.88$13.28$6.19$1.31$1.638$110.32$147.34$184.35
ALL CRANES & ATTACHMENTS Group 1: Assistant to EngineerArea 2$71.74$13.88$13.28$6.19$1.31$1.638$108.03$143.90$179.77
Group 1-AArea 2$80.25$13.88$13.28$6.19$1.31$1.638$116.54$156.67$196.79
Group 1-A: Truck Crane Assistant to EngineerArea 2$73.28$13.88$13.28$6.19$1.31$1.638$109.57$146.21$182.85
Group 1-A: Assistant to EngineerArea 2$70.99$13.88$13.28$6.19$1.31$1.638$107.28$142.78$178.27
Group 2-AArea 2$78.49$13.88$13.28$6.19$1.31$1.638$114.78$154.03$193.27
Group 2-A: Truck Crane Assistant to EngineerArea 2$73.02$13.88$13.28$6.19$1.31$1.638$109.31$145.82$182.33
Group 2-A: Assistant to EngineerArea 2$70.78$13.88$13.28$6.19$1.31$1.638$107.07$142.46$177.85
Group 3-AArea 2$76.75$13.88$13.28$6.19$1.31$1.638$113.04$151.42$189.79
Group 3-A: Truck Crane Assistant to EngineerArea 2$72.78$13.88$13.28$6.19$1.31$1.638$109.07$145.46$181.85
Group 3-A: HydraulicArea 2$72.39$13.88$13.28$6.19$1.31$1.638$108.68$144.88$181.07
Group 3-A: Assistant to EngineerArea 2$70.50$13.88$13.28$6.19$1.31$1.638$106.79$142.04$177.29
Group 4-AArea 2$73.71$13.88$13.28$6.19$1.31$1.638$110.00$146.86$183.71

Footnotes as printed on the DIR determination PDF, NC-23-63-1-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classifications within each group, see Pages 5 to 7.
  • b When three shifts are employed for five (5) or more consecutive days, seven and one-half (7½) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate.
  • c Saturday in the same work week may be worked at straight-time if a job is shut down during the normal work week due to inclement weather.
  • d Includes an amount for supplemental dues.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Operating Engineer (Building Construction)#,a, Northern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (39)

Alpine; Amador; Butte; Calaveras; Colusa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Joaquin; Santa Cruz; Shasta; Sierra; Siskiyou; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: Butte, Kings, Merced, Napa, Sacramento, San Benito, San Joaquin, Santa Cruz, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tuolumne and Trinity Counties
  • Area 2: Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties

Portions of counties falling in each area are detailed in the Operating Engineer (Heavy and Highway Work) determination

ClassificationbArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidayeTrainingOtherHourscTotal hourly rateDaily/Saturday Overtime Hourly Rate (1½ x)dSunday/Holiday Overtime Hourly Rate (2 x)
Group 1Area 1$68.95$13.88$13.28$6.19$1.31$1.638$105.24$139.72$174.19
Group 2Area 1$67.50$13.88$13.28$6.19$1.31$1.638$103.79$137.54$171.29
Group 3Area 1$66.10$13.88$13.28$6.19$1.31$1.638$102.39$135.44$168.49
Group 4Area 1$64.77$13.88$13.28$6.19$1.31$1.638$101.06$133.45$165.83
Group 5Area 1$63.56$13.88$13.28$6.19$1.31$1.638$99.85$131.63$163.41
Group 6Area 1$62.29$13.88$13.28$6.19$1.31$1.638$98.58$129.73$160.87
Group 7Area 1$61.20$13.88$13.28$6.19$1.31$1.638$97.49$128.09$158.69
Group 8Area 1$60.12$13.88$13.28$6.19$1.31$1.638$96.41$126.47$156.53
Group 8-AArea 1$58.00$13.88$13.28$6.19$1.31$1.638$94.29$123.29$152.29
ALL CRANES & ATTACHMENTS: Group 1Area 1$70.55$13.88$13.28$6.19$1.31$1.638$106.84$142.12$177.39
Group 1: Truck Crane Assistant to EngineerArea 1$63.89$13.88$13.28$6.19$1.31$1.638$100.18$132.13$164.07
Group 1: Assistant to EngineerArea 1$61.72$13.88$13.28$6.19$1.31$1.638$98.01$128.87$159.73
Group 1-AArea 1$69.80$13.88$13.28$6.19$1.31$1.638$106.09$140.99$175.89
Group 1-A: Truck Crane Assistant to EngineerArea 1$63.14$13.88$13.28$6.19$1.31$1.638$99.43$131.00$162.57
Group 1-A: Assistant to EngineerArea 1$60.97$13.88$13.28$6.19$1.31$1.638$97.26$127.75$158.23
Group 2-AArea 1$68.11$13.88$13.28$6.19$1.31$1.638$104.40$138.46$172.51
Group 2-A: Truck Crane Assistant to EngineerArea 1$62.90$13.88$13.28$6.19$1.31$1.638$99.19$130.64$162.09
Group 2-A: Assistant to EngineerArea 1$60.75$13.88$13.28$6.19$1.31$1.638$97.04$127.42$157.79
Group 3-AArea 1$66.47$13.88$13.28$6.19$1.31$1.638$102.76$136.00$169.23
Group 3-A: Truck Crane Assistant to EngineerArea 1$62.66$13.88$13.28$6.19$1.31$1.638$98.95$130.28$161.61
Group 3-A: HydraulicArea 1$62.29$13.88$13.28$6.19$1.31$1.638$98.58$129.73$160.87
Group 3-A: Assistant to EngineerArea 1$60.50$13.88$13.28$6.19$1.31$1.638$96.79$127.04$157.29
Group 4-AArea 1$63.56$13.88$13.28$6.19$1.31$1.638$99.85$131.63$163.41
Group 1Area 2$70.95$13.88$13.28$6.19$1.31$1.638$107.24$142.72$178.19
Group 2Area 2$69.50$13.88$13.28$6.19$1.31$1.638$105.79$140.54$175.29
Group 3Area 2$68.10$13.88$13.28$6.19$1.31$1.638$104.39$138.44$172.49
Group 4Area 2$66.77$13.88$13.28$6.19$1.31$1.638$103.06$136.45$169.83
Group 5Area 2$65.56$13.88$13.28$6.19$1.31$1.638$101.85$134.63$167.41
Group 6Area 2$64.29$13.88$13.28$6.19$1.31$1.638$100.58$132.73$164.87
Group 7Area 2$63.20$13.88$13.28$6.19$1.31$1.638$99.49$131.09$162.69
Group 8Area 2$62.12$13.88$13.28$6.19$1.31$1.638$98.41$129.47$160.53
Group 8-AArea 2$60.00$13.88$13.28$6.19$1.31$1.638$96.29$126.29$156.29
ALL CRANES & ATTACHMENTS: Group 1Area 2$72.55$13.88$13.28$6.19$1.31$1.638$108.84$145.12$181.39
Group 1: Truck Crane Assistant to EngineerArea 2$65.89$13.88$13.28$6.19$1.31$1.638$102.18$135.13$168.07
Group 1: Assistant to EngineerArea 2$63.72$13.88$13.28$6.19$1.31$1.638$100.01$131.87$163.73
Group 1-AArea 2$71.80$13.88$13.28$6.19$1.31$1.638$108.09$143.99$179.89
Group 1-A: Truck Crane Assistant to EngineerArea 2$65.14$13.88$13.28$6.19$1.31$1.638$101.43$134.00$166.57
Group 1-A: Assistant to EngineerArea 2$62.97$13.88$13.28$6.19$1.31$1.638$99.26$130.75$162.23
Group 2-AArea 2$70.11$13.88$13.28$6.19$1.31$1.638$106.40$141.46$176.51
Group 2-A: Truck Crane Assistant to EngineerArea 2$64.90$13.88$13.28$6.19$1.31$1.638$101.19$133.64$166.09
Group 2-A: Assistant to EngineerArea 2$62.75$13.88$13.28$6.19$1.31$1.638$99.04$130.42$161.79
Group 3-AArea 2$68.47$13.88$13.28$6.19$1.31$1.638$104.76$139.00$173.23
Group 3-A: Truck Crane Assistant to EngineerArea 2$64.66$13.88$13.28$6.19$1.31$1.638$100.95$133.28$165.61
Group 3-A: HydraulicArea 2$64.29$13.88$13.28$6.19$1.31$1.638$100.58$132.73$164.87
Group 3-A: Assistant to EngineerArea 2$62.50$13.88$13.28$6.19$1.31$1.638$98.79$130.04$161.29
Group 4-AArea 2$65.56$13.88$13.28$6.19$1.31$1.638$101.85$134.63$167.41

Special Single and Second Shift#,a

ClassificationbArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidayeTrainingOtherHoursTotal hourly rateDaily/Saturday Overtime Hourly Rate (1½ X)dSunday/Holiday Overtime Hourly Rate (2X)
Group 1Area 1$75.95$13.88$13.28$6.19$1.31$1.638$112.24$150.22$188.19
Group 2Area 1$74.50$13.88$13.28$6.19$1.31$1.638$110.79$148.04$185.29
Group 3Area 1$73.10$13.88$13.28$6.19$1.31$1.638$109.39$145.94$182.49
Group 4Area 1$71.77$13.88$13.28$6.19$1.31$1.638$108.06$143.95$179.83
Group 5Area 1$70.56$13.88$13.28$6.19$1.31$1.638$106.85$142.13$177.41
Group 6Area 1$69.29$13.88$13.28$6.19$1.31$1.638$105.58$140.23$174.87
Group 7Area 1$68.20$13.88$13.28$6.19$1.31$1.638$104.49$138.59$172.69
Group 8Area 1$67.12$13.88$13.28$6.19$1.31$1.638$103.41$136.97$170.53
Group 8-AArea 1$65.00$13.88$13.28$6.19$1.31$1.638$101.29$133.79$166.29
ALL CRANES & ATTACHMENTS: Group 1Area 1$77.55$13.88$13.28$6.19$1.31$1.638$113.84$152.62$191.39
Group 1: Truck Crane Assistant to EngineerArea 1$70.89$13.88$13.28$6.19$1.31$1.638$107.18$142.63$178.07
Group 1: Assistant to EngineerArea 1$68.72$13.88$13.28$6.19$1.31$1.638$105.01$139.37$173.73
Group 1-AArea 1$76.80$13.88$13.28$6.19$1.31$1.638$113.09$151.49$189.89
Group 1-A: Truck Crane Assistant to EngineerArea 1$70.14$13.88$13.28$6.19$1.31$1.638$106.43$141.50$176.57
Group 1-A: Assistant to EngineerArea 1$67.97$13.88$13.28$6.19$1.31$1.638$104.26$138.25$172.23
Group 2-AArea 1$75.11$13.88$13.28$6.19$1.31$1.638$111.40$148.96$186.51
Group 2-A: Truck Crane Assistant to EngineerArea 1$69.90$13.88$13.28$6.19$1.31$1.638$106.19$141.14$176.09
Group 2-A: Assistant to EngineerArea 1$67.75$13.88$13.28$6.19$1.31$1.638$104.04$137.92$171.79
Group 3-AArea 1$73.47$13.88$13.28$6.19$1.31$1.638$109.76$146.50$183.23
Group 3-A: Truck Crane Assistant to EngineerArea 1$69.66$13.88$13.28$6.19$1.31$1.638$105.95$140.78$175.61
Group 3-A: HydraulicArea 1$69.29$13.88$13.28$6.19$1.31$1.638$105.58$140.23$174.87
Group 3-A: Assistant to EngineerArea 1$67.50$13.88$13.28$6.19$1.31$1.638$103.79$137.54$171.29
Group 4-AArea 1$70.56$13.88$13.28$6.19$1.31$1.638$106.85$142.13$177.41
Group 1Area 2$77.95$13.88$13.28$6.19$1.31$1.638$114.24$153.22$192.19
Group 2Area 2$76.50$13.88$13.28$6.19$1.31$1.638$112.79$151.04$189.29
Group 3Area 2$75.10$13.88$13.28$6.19$1.31$1.638$111.39$148.94$186.49
Group 4Area 2$73.77$13.88$13.28$6.19$1.31$1.638$110.06$146.95$183.83
Group 5Area 2$72.56$13.88$13.28$6.19$1.31$1.638$108.85$145.13$181.41
Group 6Area 2$71.29$13.88$13.28$6.19$1.31$1.638$107.58$143.23$178.87
Group 7Area 2$70.20$13.88$13.28$6.19$1.31$1.638$106.49$141.59$176.69
Group 8Area 2$69.12$13.88$13.28$6.19$1.31$1.638$105.41$139.97$174.53
Group 8-AArea 2$67.00$13.88$13.28$6.19$1.31$1.638$103.29$136.79$170.29
ALL CRANES & ATTACHMENTS: Group 1Area 2$79.55$13.88$13.28$6.19$1.31$1.638$115.84$155.62$195.39
Group 1: Truck Crane Assistant to EngineerArea 2$72.89$13.88$13.28$6.19$1.31$1.638$109.18$145.63$182.07
Group 1: Assistant to EngineerArea 2$70.72$13.88$13.28$6.19$1.31$1.638$107.01$142.37$177.73
Group 1-AArea 2$78.80$13.88$13.28$6.19$1.31$1.638$115.09$154.49$193.89
Group 1-A: Truck Crane Assistant to EngineerArea 2$72.14$13.88$13.28$6.19$1.31$1.638$108.43$144.50$180.57
Group 1-A: Assistant to EngineerArea 2$69.97$13.88$13.28$6.19$1.31$1.638$106.26$141.25$176.23
Group 2-AArea 2$77.11$13.88$13.28$6.19$1.31$1.638$113.40$151.96$190.51
Group 2-A: Truck Crane Assistant to EngineerArea 2$71.90$13.88$13.28$6.19$1.31$1.638$108.19$144.14$180.09
Group 2-A: Assistant to EngineerArea 2$69.75$13.88$13.28$6.19$1.31$1.638$106.04$140.92$175.79
Group 3-AArea 2$75.47$13.88$13.28$6.19$1.31$1.638$111.76$149.50$187.23
Group 3-A: Truck Crane Assistant to EngineerArea 2$71.66$13.88$13.28$6.19$1.31$1.638$107.95$143.78$179.61
Group 3-A: HydraulicArea 2$71.29$13.88$13.28$6.19$1.31$1.638$107.58$143.23$178.87
Group 3-A: Assistant to EngineerArea 2$69.50$13.88$13.28$6.19$1.31$1.638$105.79$140.54$175.29
Group 4-AArea 2$72.56$13.88$13.28$6.19$1.31$1.638$108.85$145.13$181.41

Rows are labelled by group only. The PDF lists what each group covers in the Operating Engineer (Heavy and Highway Work) determination, pages 5-7 (footnote b).

Rows are labelled by group only. The PDF lists what each group covers in the Operating Engineer (Heavy and Highway Work) determination, pages 5-7 (footnote b).

Footnotes as printed on the DIR determination PDF, NC-23-63-1-2026-2A

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For total base bid project value of less than $3,000,000 only. The Operating Engineer (Heavy and Highway Work) determination is applicable for all work $3,000,000 and above. Where there is a published or advertised estimate of the construction costs of a project, such estimate shall determine the total base bid project value, for the purposes of the three million dollars ($3,000,000) threshold.
  • b For classifications within each group, see Pages 5-7 of the OPERATING ENGINEER (HEAVY AND HIGHWAY WORK).
  • c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7½) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate.
  • d Saturday in the same work week may be worked at straight-time if a job is shut down during the normal work week due to inclement weather.
  • e Includes an amount for supplemental dues.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Pile Driver (Operating Engineer-Heavy and Highway Work)#, Northern California

  • Determination: NC-23-63-1-2026-2B
  • Region and counties: Northern California. 46 counties.
  • Issue date: August 22, 2026
  • Expiration date: June 27, 2027 (**)
  • Applies to: The second table is headed (SPECIAL SINGLE AND SECOND SHIFT) in the PDF. The classifications covered by each group (Group A-1 to Group 8) are listed on page 4 of the DIR determination PDF.
  • Source: DIR determination PDF, NC-23-63-1-2026-2B

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaydTrainingOtherHoursaTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)bSaturday Overtime Hourly Rate (1 ½ X)cSunday/Holiday Overtime Hourly Rate (2 X)
Group A-1$72.34$13.88$13.28$6.19$1.31$1.638$108.63$144.80$144.80$180.97
Truck Crane Assistant to EngineerGroup A-1$65.36$13.88$13.28$6.19$1.31$1.638$101.65$134.33$134.33$167.01
Assistant to EngineerGroup A-1$63.08$13.88$13.28$6.19$1.31$1.638$99.37$130.91$130.91$162.45
Group 1$71.59$13.88$13.28$6.19$1.31$1.638$107.88$143.68$143.68$179.47
Truck Crane Assistant to EngineerGroup 1$64.61$13.88$13.28$6.19$1.31$1.638$100.90$133.21$133.21$165.51
Assistant to EngineerGroup 1$62.33$13.88$13.28$6.19$1.31$1.638$98.62$129.79$129.79$160.95
Group 2$69.77$13.88$13.28$6.19$1.31$1.638$106.06$140.95$140.95$175.83
Truck Crane Assistant to EngineerGroup 2$64.36$13.88$13.28$6.19$1.31$1.638$100.65$132.83$132.83$165.01
Assistant to EngineerGroup 2$62.06$13.88$13.28$6.19$1.31$1.638$98.35$129.38$129.38$160.41
Group 3$68.09$13.88$13.28$6.19$1.31$1.638$104.38$138.43$138.43$172.47
Truck Crane Assistant to EngineerGroup 3$64.07$13.88$13.28$6.19$1.31$1.638$100.36$132.40$132.40$164.43
Assistant to EngineerGroup 3$61.84$13.88$13.28$6.19$1.31$1.638$98.13$129.05$129.05$159.97
Group 4$66.32$13.88$13.28$6.19$1.31$1.638$102.61$135.77$135.77$168.93
Group 6$63.68$13.88$13.28$6.19$1.31$1.638$99.97$131.81$131.81$163.65
Group 8$61.45$13.88$13.28$6.19$1.31$1.638$97.74$128.47$128.47$159.19

Special Single and Second Shift#

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaydTrainingOtherHoursaTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)bSaturday Overtime Hourly Rate (1 ½ X)cSunday/Holiday Overtime Hourly Rate (2 X)
Group A-1$79.34$13.88$13.28$6.19$1.31$1.638$115.63$155.30$155.30$194.97
Truck Crane Assistant to EngineerGroup A-1$72.36$13.88$13.28$6.19$1.31$1.638$108.65$144.83$144.83$181.01
Assistant to EngineerGroup A-1$70.08$13.88$13.28$6.19$1.31$1.638$106.37$141.41$141.41$176.45
Group 1$78.59$13.88$13.28$6.19$1.31$1.638$114.88$154.18$154.18$193.47
Truck Crane Assistant to EngineerGroup 1$71.61$13.88$13.28$6.19$1.31$1.638$107.90$143.71$143.71$179.51
Assistant to EngineerGroup 1$69.33$13.88$13.28$6.19$1.31$1.638$105.62$140.29$140.29$174.95
Group 2$76.77$13.88$13.28$6.19$1.31$1.638$113.06$151.45$151.45$189.83
Truck Crane Assistant to EngineerGroup 2$71.36$13.88$13.28$6.19$1.31$1.638$107.65$143.33$143.33$179.01
Assistant to EngineerGroup 2$69.06$13.88$13.28$6.19$1.31$1.638$105.35$139.88$139.88$174.41
Group 3$75.09$13.88$13.28$6.19$1.31$1.638$111.38$148.93$148.93$186.47
Truck Crane Assistant to EngineerGroup 3$71.07$13.88$13.28$6.19$1.31$1.638$107.36$142.90$142.90$178.43
Assistant to EngineerGroup 3$68.84$13.88$13.28$6.19$1.31$1.638$105.13$139.55$139.55$173.97
Group 4$73.32$13.88$13.28$6.19$1.31$1.638$109.61$146.27$146.27$182.93
Group 6$70.68$13.88$13.28$6.19$1.31$1.638$106.97$142.31$142.31$177.65
Group 8$68.45$13.88$13.28$6.19$1.31$1.638$104.74$138.97$138.97$173.19

Footnotes as printed on the DIR determination PDF, NC-23-63-1-2026-2B

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a When three shifts are employed for five (5) or more consecutive days, seven and one-half (7 1/2) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate.
  • b Rate applies to the first 2 daily overtime hours only. All other time is paid at the double time rate.
  • c Saturday in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather.
  • d Includes an amount withheld for supplemental dues.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Pile Driver (Operating Engineer-Building Construction)#,a, Northern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (39)

Alpine; Amador; Butte; Calaveras; Colusa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Joaquin; Santa Cruz; Shasta; Sierra; Siskiyou; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

ClassificationbArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidayeTrainingOtherHourscTotal hourly rateDaily (1 1/2X)Saturday (1 1/2X)dSunday/Holiday (2X)
Group A-1Group A-1$70.86$13.88$13.28$6.19$1.31$1.638$107.15$142.58$142.58$178.01
Truck Crane Assistant to EngineerGroup A-1$64.21$13.88$13.28$6.19$1.31$1.638$100.50$132.61$132.61$164.71
Assistant to EngineerGroup A-1$62.04$13.88$13.28$6.19$1.31$1.638$98.33$129.35$129.35$160.37
Group 1Group 1$70.11$13.88$13.28$6.19$1.31$1.638$106.40$141.46$141.46$176.51
Truck Crane Assistant to EngineerGroup 1$63.46$13.88$13.28$6.19$1.31$1.638$99.75$131.48$131.48$163.21
Assistant to EngineerGroup 1$61.29$13.88$13.28$6.19$1.31$1.638$97.58$128.23$128.23$158.87
Group 2Group 2$68.40$13.88$13.28$6.19$1.31$1.638$104.69$138.89$138.89$173.09
Truck Crane Assistant to EngineerGroup 2$63.23$13.88$13.28$6.19$1.31$1.638$99.52$131.14$131.14$162.75
Assistant to EngineerGroup 2$61.04$13.88$13.28$6.19$1.31$1.638$97.33$127.85$127.85$158.37
Group 3Group 3$66.79$13.88$13.28$6.19$1.31$1.638$103.08$136.48$136.48$169.87
Truck Crane Assistant to EngineerGroup 3$62.96$13.88$13.28$6.19$1.31$1.638$99.25$130.73$130.73$162.21
Assistant to EngineerGroup 3$60.81$13.88$13.28$6.19$1.31$1.638$97.10$127.51$127.51$157.91
Group 4Group 4$65.09$13.88$13.28$6.19$1.31$1.638$101.38$133.93$133.93$166.47
Group 6Group 6$62.59$13.88$13.28$6.19$1.31$1.638$98.88$130.18$130.18$161.47
Group 8Group 8$60.45$13.88$13.28$6.19$1.31$1.638$96.74$126.97$126.97$157.19

Special Single and Second Shift#,a

ClassificationbArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidayeTrainingOtherHoursTotal hourly rateDaily (1 1/2X)Saturday (1 1/2X)dSunday/Holiday (2X)
Group A-1Group A-1$77.86$13.88$13.28$6.19$1.31$1.638$114.15$153.08$153.08$192.01
Truck Crane Assistant to EngineerGroup A-1$71.21$13.88$13.28$6.19$1.31$1.638$107.50$143.11$143.11$178.71
Assistant to EngineerGroup A-1$69.04$13.88$13.28$6.19$1.31$1.638$105.33$139.85$139.85$174.37
Group 1Group 1$77.11$13.88$13.28$6.19$1.31$1.638$113.40$151.96$151.96$190.51
Truck Crane Assistant to EngineerGroup 1$70.46$13.88$13.28$6.19$1.31$1.638$106.75$141.98$141.98$177.21
Assistant to EngineerGroup 1$68.29$13.88$13.28$6.19$1.31$1.638$104.58$138.73$138.73$172.87
Group 2Group 2$75.40$13.88$13.28$6.19$1.31$1.638$111.69$149.39$149.39$187.09
Truck Crane Assistant to EngineerGroup 2$70.23$13.88$13.28$6.19$1.31$1.638$106.52$141.64$141.64$176.75
Assistant to EngineerGroup 2$68.04$13.88$13.28$6.19$1.31$1.638$104.33$138.35$138.35$172.37
Group 3Group 3$73.79$13.88$13.28$6.19$1.31$1.638$110.08$146.98$146.98$183.87
Truck Crane Assistant to EngineerGroup 3$69.96$13.88$13.28$6.19$1.31$1.638$106.25$141.23$141.23$176.21
Assistant to EngineerGroup 3$67.81$13.88$13.28$6.19$1.31$1.638$104.10$138.01$138.01$171.91
Group 4Group 4$72.09$13.88$13.28$6.19$1.31$1.638$108.38$144.43$144.43$180.47
Group 6Group 6$69.59$13.88$13.28$6.19$1.31$1.638$105.88$140.68$140.68$175.47
Group 8Group 8$67.45$13.88$13.28$6.19$1.31$1.638$103.74$137.47$137.47$171.19

Footnotes as printed on the DIR determination PDF, NC-23-63-1-2026-2B1

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For total base bid project value of less than $3,000,000 only. The Operating Engineer (Heavy and Highway Work) determination is applicable for all work $3,000,000 and above. Where there is a published or advertised estimate of the construction costs of a project, such estimate shall determine the total base bid project value, for the purposes of the three million dollars ($3,000,000) threshold.
  • b For classifications within each group, see Pile Driver (Operating Engineer - Heavy and Highway Work).
  • c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7 1/2) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate.
  • d Saturday in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather.
  • e Includes an amount withheld for supplemental dues.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Tunnel/Underground (Operating Engineer-Heavy and Highway Work)#, Northern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination)
  • Area 2: Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Tulare, Tuolumne and Trinity Counties. (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination)

The boundaries of the portions of counties in each area are given in the Operating Engineer (Heavy and Highway Work) determination.

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHourscTotal hourly rateDaily/Saturday Overtime Hourly Rate (1½ x)dSunday/Holiday Overtime Hourly Rate (2 x)
Underground Rate Group 1-AAREA 1$68.84$13.88$13.28$6.19$1.31$1.638$105.13$139.55$173.97
Underground Rate Group 1AREA 1$66.37$13.88$13.28$6.19$1.31$1.638$102.66$135.85$169.03
Underground Rate Group 2AREA 1$65.11$13.88$13.28$6.19$1.31$1.638$101.40$133.96$166.51
Underground Rate Group 3AREA 1$63.78$13.88$13.28$6.19$1.31$1.638$100.07$131.96$163.85
Underground Rate Group 4AREA 1$62.64$13.88$13.28$6.19$1.31$1.638$98.93$130.25$161.57
Underground Rate Group 5AREA 1$61.50$13.88$13.28$6.19$1.31$1.638$97.79$128.54$159.29
Shafts Stopes & Raises Group 1-AAREA 1$68.94$13.88$13.28$6.19$1.31$1.638$105.23$139.70$174.17
Shafts Stopes & Raises Group 1AREA 1$66.47$13.88$13.28$6.19$1.31$1.638$102.76$136.00$169.23
Shafts Stopes & Raises Group 2AREA 1$65.21$13.88$13.28$6.19$1.31$1.638$101.50$134.11$166.71
Shafts Stopes & Raises Group 3AREA 1$63.88$13.88$13.28$6.19$1.31$1.638$100.17$132.11$164.05
Shafts Stopes & Raises Group 4AREA 1$62.74$13.88$13.28$6.19$1.31$1.638$99.03$130.40$161.77
Shafts Stopes & Raises Group 5AREA 1$61.60$13.88$13.28$6.19$1.31$1.638$97.89$128.69$159.49
Underground Rate Group 1-AAREA 2$70.84$13.88$13.28$6.19$1.31$1.638$107.13$142.55$177.97
Underground Rate Group 1AREA 2$68.37$13.88$13.28$6.19$1.31$1.638$104.66$138.85$173.03
Underground Rate Group 2AREA 2$67.11$13.88$13.28$6.19$1.31$1.638$103.40$136.96$170.51
Underground Rate Group 3AREA 2$65.78$13.88$13.28$6.19$1.31$1.638$102.07$134.96$167.85
Underground Rate Group 4AREA 2$64.64$13.88$13.28$6.19$1.31$1.638$100.93$133.25$165.57
Underground Rate Group 5AREA 2$63.50$13.88$13.28$6.19$1.31$1.638$99.79$131.54$163.29
Shafts Stopes & Raises Group 1-AAREA 2$70.94$13.88$13.28$6.19$1.31$1.638$107.23$142.70$178.17
Shafts Stopes & Raises Group 1AREA 2$68.47$13.88$13.28$6.19$1.31$1.638$104.76$139.00$173.23
Shafts Stopes & Raises Group 2AREA 2$67.21$13.88$13.28$6.19$1.31$1.638$103.50$137.11$170.71
Shafts Stopes & Raises Group 3AREA 2$65.88$13.88$13.28$6.19$1.31$1.638$102.17$135.11$168.05
Shafts Stopes & Raises Group 4AREA 2$64.74$13.88$13.28$6.19$1.31$1.638$101.03$133.40$165.77
Shafts Stopes & Raises Group 5AREA 2$63.60$13.88$13.28$6.19$1.31$1.638$99.89$131.69$163.49

Special Single and Second Shift#

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHoursTotal hourly rateDaily/Saturday Overtime Hourly Rate (1½ x)dSunday/Holiday Overtime Hourly Rate (2 x)
Underground Rate Group 1-AAREA 1$75.84$13.88$13.28$6.19$1.31$1.638$112.13$150.05$187.97
Underground Rate Group 1AREA 1$73.37$13.88$13.28$6.19$1.31$1.638$109.66$146.35$183.03
Underground Rate Group 2AREA 1$72.11$13.88$13.28$6.19$1.31$1.638$108.40$144.46$180.51
Underground Rate Group 3AREA 1$70.78$13.88$13.28$6.19$1.31$1.638$107.07$142.46$177.85
Underground Rate Group 4AREA 1$69.64$13.88$13.28$6.19$1.31$1.638$105.93$140.75$175.57
Underground Rate Group 5AREA 1$68.50$13.88$13.28$6.19$1.31$1.638$104.79$139.04$173.29
Shafts Stopes & Raises Group 1-AAREA 1$75.94$13.88$13.28$6.19$1.31$1.638$112.23$150.20$188.17
Shafts Stopes & Raises Group 1AREA 1$73.47$13.88$13.28$6.19$1.31$1.638$109.76$146.50$183.23
Shafts Stopes & Raises Group 2AREA 1$72.21$13.88$13.28$6.19$1.31$1.638$108.50$144.61$180.71
Shafts Stopes & Raises Group 3AREA 1$70.88$13.88$13.28$6.19$1.31$1.638$107.17$142.61$178.05
Shafts Stopes & Raises Group 4AREA 1$69.74$13.88$13.28$6.19$1.31$1.638$106.03$140.90$175.77
Shafts Stopes & Raises Group 5AREA 1$68.60$13.88$13.28$6.19$1.31$1.638$104.89$139.19$173.49
Underground Rate Group 1-AAREA 2$77.84$13.88$13.28$6.19$1.31$1.638$114.13$153.05$191.97
Underground Rate Group 1AREA 2$75.37$13.88$13.28$6.19$1.31$1.638$111.66$149.35$187.03
Underground Rate Group 2AREA 2$74.11$13.88$13.28$6.19$1.31$1.638$110.40$147.46$184.51
Underground Rate Group 3AREA 2$72.78$13.88$13.28$6.19$1.31$1.638$109.07$145.46$181.85
Underground Rate Group 4AREA 2$71.64$13.88$13.28$6.19$1.31$1.638$107.93$143.75$179.57
Underground Rate Group 5AREA 2$70.50$13.88$13.28$6.19$1.31$1.638$106.79$142.04$177.29
Shafts Stopes & Raises Group 1-AAREA 2$77.94$13.88$13.28$6.19$1.31$1.638$114.23$153.20$192.17
Shafts Stopes & Raises Group 1AREA 2$75.47$13.88$13.28$6.19$1.31$1.638$111.76$149.50$187.23
Shafts Stopes & Raises Group 2AREA 2$74.21$13.88$13.28$6.19$1.31$1.638$110.50$147.61$184.71
Shafts Stopes & Raises Group 3AREA 2$72.88$13.88$13.28$6.19$1.31$1.638$109.17$145.61$182.05
Shafts Stopes & Raises Group 4AREA 2$71.74$13.88$13.28$6.19$1.31$1.638$108.03$143.90$179.77
Shafts Stopes & Raises Group 5AREA 2$70.60$13.88$13.28$6.19$1.31$1.638$106.89$142.19$177.49

Footnotes as printed on the DIR determination PDF, NC-23-63-1-2026-2C

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • ** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.
  • a For classifications within each group, see page 3.
  • b Includes an amount for supplemental dues.
  • c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7½) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate.
  • d Saturday in the same work week may be worked at straight-time if a job is shut down during the normal work week due to inclement weather.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Steel Erector and Fabricator (Operating Engineer-Heavy and Highway Work)#,a, Northern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHourscTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)dSaturday Overtime Hourly Rate (1 ½ X)e,dSunday/Holiday Overtime Hourly Rate (2 X)
Group A-1$72.97$13.88$13.28$6.19$1.31$1.638$109.26$145.75$145.75$182.23
Truck Crane Assistant to EngineerGroup A-1$65.65$13.88$13.28$6.19$1.31$1.638$101.94$134.77$134.77$167.59
Assistant to EngineerGroup A-1$63.42$13.88$13.28$6.19$1.31$1.638$99.71$131.42$131.42$163.13
Group 1$72.22$13.88$13.28$6.19$1.31$1.638$108.51$144.62$144.62$180.73
Truck Crane Assistant to EngineerGroup 1$64.90$13.88$13.28$6.19$1.31$1.638$101.19$133.64$133.64$166.09
Assistant to EngineerGroup 1$62.67$13.88$13.28$6.19$1.31$1.638$98.96$130.30$130.30$161.63
Group 2$70.45$13.88$13.28$6.19$1.31$1.638$106.74$141.97$141.97$177.19
Truck Crane Assistant to EngineerGroup 2$64.68$13.88$13.28$6.19$1.31$1.638$100.97$133.31$133.31$165.65
Assistant to EngineerGroup 2$62.40$13.88$13.28$6.19$1.31$1.638$98.69$129.89$129.89$161.09
Group 3$68.97$13.88$13.28$6.19$1.31$1.638$105.26$139.75$139.75$174.23
Truck Crane Assistant to EngineerGroup 3$64.41$13.88$13.28$6.19$1.31$1.638$100.70$132.91$132.91$165.11
Hydraulic Assistant to EngineerGroup 3$64.02$13.88$13.28$6.19$1.31$1.638$100.31$132.32$132.32$164.33
Assistant to EngineerGroup 3$62.18$13.88$13.28$6.19$1.31$1.638$98.47$129.56$129.56$160.65
Group 4$66.95$13.88$13.28$6.19$1.31$1.638$103.24$136.72$136.72$170.19
Group 5$65.65$13.88$13.28$6.19$1.31$1.638$101.94$134.77$134.77$167.59

Special Single and Second Shift#,a

ClassificationArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1 ½ X)dSaturday Overtime Hourly Rate (1 ½ X)d,eSunday/Holiday Overtime Hourly Rate (2 X)
Group A-1$79.97$13.88$13.28$6.19$1.31$1.638$116.26$156.25$156.25$196.23
Truck Crane Assistant to EngineerGroup A-1$72.65$13.88$13.28$6.19$1.31$1.638$108.94$145.27$145.27$181.59
Assistant to EngineerGroup A-1$70.42$13.88$13.28$6.19$1.31$1.638$106.71$141.92$141.92$177.13
Group 1$79.22$13.88$13.28$6.19$1.31$1.638$115.51$155.12$155.12$194.73
Truck Crane Assistant to EngineerGroup 1$71.90$13.88$13.28$6.19$1.31$1.638$108.19$144.14$144.14$180.09
Assistant to EngineerGroup 1$69.67$13.88$13.28$6.19$1.31$1.638$105.96$140.80$140.80$175.63
Group 2$77.45$13.88$13.28$6.19$1.31$1.638$113.74$152.47$152.47$191.19
Truck Crane Assistant to EngineerGroup 2$71.68$13.88$13.28$6.19$1.31$1.638$107.97$143.81$143.81$179.65
Assistant to EngineerGroup 2$69.40$13.88$13.28$6.19$1.31$1.638$105.69$140.39$140.39$175.09
Group 3$75.97$13.88$13.28$6.19$1.31$1.638$112.26$150.25$150.25$188.23
Truck Crane Assistant to EngineerGroup 3$71.41$13.88$13.28$6.19$1.31$1.638$107.70$143.41$143.41$179.11
Hydraulic Assistant to EngineerGroup 3$71.02$13.88$13.28$6.19$1.31$1.638$107.31$142.82$142.82$178.33
Assistant to EngineerGroup 3$69.18$13.88$13.28$6.19$1.31$1.638$105.47$140.06$140.06$174.65
Group 4$73.95$13.88$13.28$6.19$1.31$1.638$110.24$147.22$147.22$184.19
Group 5$72.65$13.88$13.28$6.19$1.31$1.638$108.94$145.27$145.27$181.59

The group-to-classification list (which equipment each Group covers) is printed on PDF page 2 under CLASSIFICATIONS. Group A-1: Cranes, Derricks and Self Propelled Boom Type Lifting Devices over 250 Tons. Group 1: the same over 100 Tons, and Tower Crane. Group 2: Cranes over 45 up to and including 100 tons, Derrick 100 tons and under, Rotating Tele Handler, Magni and similar, and Self Propelled Boom Type Lifting Device over 45 Tons. Group 3: Cranes, Rotating Tele Handler, Magni and similar, and Self Propelled Boom Type Lifting Device, 45 tons and under. Group 4: Chicago Boom, Forklift 10 Tons and over, Heavy Duty Repairman/Welder. Group 5: Boom Cat.

Footnotes as printed on the DIR determination PDF, NC-23-63-1-2026-2D

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For Building Construction, see Steel Erector and Fabricator (Operating Engineer-Building Construction) determination.
  • b Includes an amount for supplemental dues.
  • c When three shifts are employed for five (5) or more consecutive days, seven and one-half (7 1/2) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate.
  • d Rate applies to the first 2 daily overtime hours only. All other time is paid at the double time rate.
  • e Saturday in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Steel Erector and Fabricator (Operating Engineer-Building Construction)#,a, Northern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (39)

Alpine; Amador; Butte; Calaveras; Colusa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Joaquin; Santa Cruz; Shasta; Sierra; Siskiyou; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

ClassificationbBasic hourly rateHealth and welfarePensionVacation and holidaycTrainingOtherHoursdTotal hourly rateDaily (1 1/2X)Saturday (1 1/2X)eSunday/Holiday (2X)
Group A-1$71.49$13.88$13.28$6.19$1.31$1.638$107.78$143.53$143.53$179.27
Truck Crane Assistant to Engineer$64.50$13.88$13.28$6.19$1.31$1.638$100.79$133.04$133.04$165.29
Assistant to Engineer$62.36$13.88$13.28$6.19$1.31$1.638$98.65$129.83$129.83$161.01
Group 1$70.74$13.88$13.28$6.19$1.31$1.638$107.03$142.40$142.40$177.77
Truck Crane Assistant to Engineer$63.75$13.88$13.28$6.19$1.31$1.638$100.04$131.92$131.92$163.79
Assistant to Engineer$61.61$13.88$13.28$6.19$1.31$1.638$97.90$128.71$128.71$159.51
Group 2$69.03$13.88$13.28$6.19$1.31$1.638$105.32$139.84$139.84$174.35
Truck Crane Assistant to Engineer$63.53$13.88$13.28$6.19$1.31$1.638$99.82$131.59$131.59$163.35
Assistant to Engineer$61.36$13.88$13.28$6.19$1.31$1.638$97.65$128.33$128.33$159.01
Group 3$67.64$13.88$13.28$6.19$1.31$1.638$103.93$137.75$137.75$171.57
Truck Crane Assistant to Engineer$63.28$13.88$13.28$6.19$1.31$1.638$99.57$131.21$131.21$162.85
Hydraulic$62.90$13.88$13.28$6.19$1.31$1.638$99.19$130.64$130.64$162.09
Assistant to Engineer$61.13$13.88$13.28$6.19$1.31$1.638$97.42$127.99$127.99$158.55
Group 4$65.71$13.88$13.28$6.19$1.31$1.638$102.00$134.86$134.86$167.71
Group 5$64.46$13.88$13.28$6.19$1.31$1.638$100.75$132.98$132.98$165.21

Special Single and Second Shift#,a

ClassificationbBasic hourly rateHealth and welfarePensionVacation and holidaycTrainingOtherHoursTotal hourly rateDaily (1 1/2X)Saturday (1 1/2X)eSunday/Holiday (2X)
Group A-1$78.49$13.88$13.28$6.19$1.31$1.638$114.78$154.03$154.03$193.27
Truck Crane Assistant to Engineer$71.50$13.88$13.28$6.19$1.31$1.638$107.79$143.54$143.54$179.29
Assistant to Engineer$69.36$13.88$13.28$6.19$1.31$1.638$105.65$140.33$140.33$175.01
Group 1$77.74$13.88$13.28$6.19$1.31$1.638$114.03$152.90$152.90$191.77
Truck Crane Assistant to Engineer$70.75$13.88$13.28$6.19$1.31$1.638$107.04$142.42$142.42$177.79
Assistant to Engineer$68.61$13.88$13.28$6.19$1.31$1.638$104.90$139.21$139.21$173.51
Group 2$76.03$13.88$13.28$6.19$1.31$1.638$112.32$150.34$150.34$188.35
Truck Crane Assistant to Engineer$70.53$13.88$13.28$6.19$1.31$1.638$106.82$142.09$142.09$177.35
Assistant to Engineer$68.36$13.88$13.28$6.19$1.31$1.638$104.65$138.83$138.83$173.01
Group 3$74.64$13.88$13.28$6.19$1.31$1.638$110.93$148.25$148.25$185.57
Truck Crane Assistant to Engineer$70.28$13.88$13.28$6.19$1.31$1.638$106.57$141.71$141.71$176.85
Hydraulic$69.90$13.88$13.28$6.19$1.31$1.638$106.19$141.14$141.14$176.09
Assistant to Engineer$68.13$13.88$13.28$6.19$1.31$1.638$104.42$138.49$138.49$172.55
Group 4$72.71$13.88$13.28$6.19$1.31$1.638$109.00$145.36$145.36$181.71
Group 5$71.46$13.88$13.28$6.19$1.31$1.638$107.75$143.48$143.48$179.21

Rows that list only Truck Crane Assistant to Engineer, Hydraulic or Assistant to Engineer belong to the group printed just above them. The PDF lists what each group covers in the Steel Erector and Fabricator (Operating Engineer-Heavy and Highway Work) determination.

Footnotes as printed on the DIR determination PDF, NC-23-63-1-2026-2D1

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For total base bid project value of less than $3,000,000 only. The Operating Engineer (Heavy and Highway Work) determination is applicable for all work $3,000,000 and above. Where there is a published or advertised estimate of the construction costs of a project, such estimate shall determine the total base bid project value, for the purposes of the three million dollars ($3,000,000) threshold.
  • b For classifications within each group, see Steel Erector and Fabricator (Operating Engineer-Heavy And Highway Work) Determination.
  • c Includes an amount for supplemental dues.
  • d When three shifts are employed for five (5) or more consecutive days, seven and one-half (7 1/2) consecutive hours (exclusive of meal period), shall constitute a day of work, for which eight (8) times the straight time hourly rate shall be paid at the non-shift wage rate for the second shift. The third shift shall be seven (7) hours of work for eight (8) hours of pay at the non-shift wage rate.
  • e Saturday in the same work week may be worked at straight-time rates if a job is shut down during the normal work week due to inclement weather.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Dredger Operating Engineer#, Northern California

Expired on July 31, 2026 This determination's expiration date is before the date these pages were built (November 13, 2026), so the figures below may no longer be the ones to use on a current bid. The asterisk explanation below says why. Check DIR's current list for a newer determination.

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Trinity, Tulare, and Tuolumne Counties (Portions of counties falling in each area detailed on the Operating Engineer - Heavy and Highway Work Determination).
  • Area 2: Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Trinity, Tulare, and Tuolumne Counties (Portions of counties falling in each area detailed on the Operating Engineer - Heavy and Highway Work Determination).

The PDF gives the portions of the split counties on the Operating Engineer - Heavy and Highway Work Determination.

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionbVacation and holidaycTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ X)dSaturday Overtime Hourly Rate (1½ X)d,eSunday/Holiday Overtime Hourly Rate (2 X)
Group 1Area 1$62.61$13.38$23.10$6.43$0.73$0.428$106.67$137.975$137.975$169.28
Group 2Area 1$57.65$13.38$23.10$6.43$0.73$0.428$101.71$130.535$130.535$159.36
Group 3Area 1$56.53$13.38$23.10$6.43$0.73$0.428$100.59$128.855$128.855$157.12
Group 4Area 1$53.23$13.38$23.10$6.43$0.73$0.428$97.29$123.905$123.905$150.52
Group 1Area 2$64.61$13.38$23.10$6.43$0.73$0.428$108.67$140.975$140.975$173.28
Group 2Area 2$59.65$13.38$23.10$6.43$0.73$0.428$103.71$133.535$133.535$163.36
Group 3Area 2$58.53$13.38$23.10$6.43$0.73$0.428$102.59$131.855$131.855$161.12
Group 4Area 2$55.23$13.38$23.10$6.43$0.73$0.428$99.29$126.905$126.905$154.52

Special Single and Second Shift

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionbVacation and holidaycTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ X)dSaturday Overtime Hourly Rate (1½ X)d,eSunday/Holiday Overtime Hourly Rate (2 X)
Group 1Area 1 (Special Single and Second Shift)$70.44$13.38$23.10$6.43$0.73$0.428$114.50$149.72$149.72$184.94
Group 2Area 1 (Special Single and Second Shift)$64.86$13.38$23.10$6.43$0.73$0.428$108.92$141.35$141.35$173.78
Group 3Area 1 (Special Single and Second Shift)$63.60$13.38$23.10$6.43$0.73$0.428$107.66$139.46$139.46$171.26
Group 4Area 1 (Special Single and Second Shift)$59.88$13.38$23.10$6.43$0.73$0.428$103.94$133.88$133.88$163.82
Group 1Area 2 (Special Single and Second Shift)$72.44$13.38$23.10$6.43$0.73$0.428$116.50$152.72$152.72$188.94
Group 2Area 2 (Special Single and Second Shift)$66.86$13.38$23.10$6.43$0.73$0.428$110.92$144.35$144.35$177.78
Group 3Area 2 (Special Single and Second Shift)$65.60$13.38$23.10$6.43$0.73$0.428$109.66$142.46$142.46$175.26
Group 4Area 2 (Special Single and Second Shift)$61.88$13.38$23.10$6.43$0.73$0.428$105.94$136.88$136.88$167.82

Footnotes as printed on the DIR determination PDF, NC-63-3-12-2025-1

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classifications within each group, see Page 5.
  • b Includes an amount for Annuity Trust Fund.
  • c Includes an amount for Supplemental Dues.
  • d Rate applies to the first 4 daily overtime hours Monday thru Friday and the first 12 hours on Saturday. All other time worked is paid at the Sunday and Holiday overtime rate.
  • e Saturday in the same workweek may be worked at straight-time if a job is shut down during the normal workweek due to inclement weather.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Operating Engineer#, Northern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (46)

Alameda; Alpine; Amador; Butte; Calaveras; Colusa; Contra Costa; Del Norte; El Dorado; Fresno; Glenn; Humboldt; Kings; Lake; Lassen; Madera; Marin; Mariposa; Mendocino; Merced; Modoc; Monterey; Napa; Nevada; Placer; Plumas; Sacramento; San Benito; San Francisco; San Joaquin; San Mateo; Santa Clara; Santa Cruz; Shasta; Sierra; Siskiyou; Solano; Sonoma; Stanislaus; Sutter; Tehama; Trinity; Tulare; Tuolumne; Yolo; Yuba

Areas as printed on the DIR determination PDF

  • Area 1: Alameda, Butte, Contra Costa, Kings, Marin, Merced, Napa, Sacramento, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Solano, Stanislaus, Sutter, Yolo and Yuba counties; and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Trinity, Tulare, and Tuolumne Counties (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination).
  • Area 2: Modoc, and portions of Alpine, Amador, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Lake, Lassen, Madera, Mariposa, Mendocino, Monterey, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Sonoma, Tehama, Trinity, Tulare, and Tuolumne Counties (Portions of counties falling in each area detailed in the Operating Engineer (Heavy and Highway Work) determination).

For the parts of the listed counties that fall in each area, see the Operating Engineer (Heavy and Highway Work) determination.

Wages and Employer Payments (Area 1)#

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ X)Saturday Overtime Hourly Rate (1½ X)cSunday/ Holiday Overtime Hourly Rate (2 X)
Group IArea 1$59.26$13.88$11.85$4.68$1.38$1.428$92.47$122.10$122.10$151.73
Group IIArea 1$55.66$13.88$11.85$4.68$1.38$1.428$88.87$116.70$116.70$144.53
Group IIIArea 1$51.05$13.88$11.85$4.68$1.38$1.428$84.26$109.79$109.79$135.31
Group IVArea 1$48.34$13.88$11.85$4.68$1.38$1.428$81.55$105.72$105.72$129.89

Wages and Employer Payments (Area 2)#

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ X)Saturday Overtime Hourly Rate (1½ X)cSunday/ Holiday Overtime Hourly Rate (2 X)
Group IArea 2$61.26$13.88$11.85$4.68$1.38$1.428$94.47$125.10$125.10$155.73
Group IIArea 2$57.66$13.88$11.85$4.68$1.38$1.428$90.87$119.70$119.70$148.53
Group IIIArea 2$53.05$13.88$11.85$4.68$1.38$1.428$86.26$112.79$112.79$139.31
Group IVArea 2$50.34$13.88$11.85$4.68$1.38$1.428$83.55$108.72$108.72$133.89

Special Single and Second Shift, Wages and Employer Payments (Area 1)#

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ X)Saturday Overtime Hourly Rate (1½ X)cSunday/ Holiday Overtime Hourly Rate (2 X)
Group IArea 1$66.26$13.88$11.85$4.68$1.38$1.428$99.47$132.60$132.60$165.73
Group IIArea 1$62.66$13.88$11.85$4.68$1.38$1.428$95.87$127.20$127.20$158.53
Group IIIArea 1$58.05$13.88$11.85$4.68$1.38$1.428$91.26$120.29$120.29$149.31
Group IVArea 1$55.34$13.88$11.85$4.68$1.38$1.428$88.55$116.22$116.22$143.89

Special Single and Second Shift, Wages and Employer Payments (Area 2)#

ClassificationaArea or shiftBasic hourly rateHealth and welfarePensionVacation and holidaybTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ X)Saturday Overtime Hourly Rate (1½ X)cSunday/ Holiday Overtime Hourly Rate (2 X)
Group 1Area 2$68.26$13.88$11.85$4.68$1.38$1.428$101.47$135.60$135.60$169.73
Group 2Area 2$64.66$13.88$11.85$4.68$1.38$1.428$97.87$130.20$130.20$162.53
Group 3Area 2$60.05$13.88$11.85$4.68$1.38$1.428$93.26$123.29$123.29$153.31
Group 4Area 2$57.34$13.88$11.85$4.68$1.38$1.428$90.55$119.22$119.22$147.89

Footnotes as printed on the DIR determination PDF, NC-63-3-75-2026-1

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classifications within each group, see Page 5.
  • b Includes an amount for Supplemental Dues.
  • c Saturday in the same workweek may be worked at straight-time if a job is shut down during the normal workweek due to inclement weather, major mechanical breakdown or shortage of materials beyond the control of the Individual Employer.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Operating Engineer#, Southern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (11)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Luis Obispo; Santa Barbara; Ventura

Operating Engineer#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$64.40$17.45$17.40$2.95$1.10$0.458$103.75$135.95$135.95$168.15
Group 2$65.18$17.45$17.40$2.95$1.10$0.458$104.53$137.12$137.12$169.71
Group 3$65.47$17.45$17.40$2.95$1.10$0.458$104.82$137.555$137.555$170.29
Group 4$66.96$17.45$17.40$2.95$1.10$0.458$106.31$139.79$139.79$173.27
Group 6$67.18$17.45$17.40$2.95$1.10$0.458$106.53$140.12$140.12$173.71
Group 8$67.29$17.45$17.40$2.95$1.10$0.458$106.64$140.285$140.285$173.93
Group 10$67.41$17.45$17.40$2.95$1.10$0.458$106.76$140.465$140.465$174.17
Group 12$67.58$17.45$17.40$2.95$1.10$0.458$106.93$140.72$140.72$174.51
Group 13$67.68$17.45$17.40$2.95$1.10$0.458$107.03$140.87$140.87$174.71
Group 14$67.71$17.45$17.40$2.95$1.10$0.458$107.06$140.915$140.915$174.77
Group 15$67.79$17.45$17.40$2.95$1.10$0.458$107.14$141.035$141.035$174.93
Group 16$67.91$17.45$17.40$2.95$1.10$0.458$107.26$141.215$141.215$175.17
Group 17$68.08$17.45$17.40$2.95$1.10$0.458$107.43$141.47$141.47$175.51
Group 18$68.18$17.45$17.40$2.95$1.10$0.458$107.53$141.62$141.62$175.71
Group 19$68.29$17.45$17.40$2.95$1.10$0.458$107.64$141.785$141.785$175.93
Group 20$68.41$17.45$17.40$2.95$1.10$0.458$107.76$141.965$141.965$176.17
Group 21$68.58$17.45$17.40$2.95$1.10$0.458$107.93$142.22$142.22$176.51
Group 22$68.68$17.45$17.40$2.95$1.10$0.458$108.03$142.37$142.37$176.71
Group 23$68.79$17.45$17.40$2.95$1.10$0.458$108.14$142.535$142.535$176.93
Group 24$68.91$17.45$17.40$2.95$1.10$0.458$108.26$142.715$142.715$177.17
Group 25$69.08$17.45$17.40$2.95$1.10$0.458$108.43$142.97$142.97$177.51

Special Shift#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$65.40$17.45$17.40$2.95$1.10$0.458$104.75$137.45$137.45$170.15
Group 2$66.18$17.45$17.40$2.95$1.10$0.458$105.53$138.62$138.62$171.71
Group 3$66.47$17.45$17.40$2.95$1.10$0.458$105.82$139.055$139.055$172.29
Group 4$67.96$17.45$17.40$2.95$1.10$0.458$107.31$141.29$141.29$175.27
Group 6$68.18$17.45$17.40$2.95$1.10$0.458$107.53$141.62$141.62$175.71
Group 8$68.29$17.45$17.40$2.95$1.10$0.458$107.64$141.785$141.785$175.93
Group 10$68.41$17.45$17.40$2.95$1.10$0.458$107.76$141.965$141.965$176.17
Group 12$68.58$17.45$17.40$2.95$1.10$0.458$107.93$142.22$142.22$176.51
Group 13$68.68$17.45$17.40$2.95$1.10$0.458$108.03$142.37$142.37$176.71
Group 14$68.71$17.45$17.40$2.95$1.10$0.458$108.06$142.415$142.415$176.77
Group 15$68.79$17.45$17.40$2.95$1.10$0.458$108.14$142.535$142.535$176.93
Group 16$68.91$17.45$17.40$2.95$1.10$0.458$108.26$142.715$142.715$177.17
Group 17$69.08$17.45$17.40$2.95$1.10$0.458$108.43$142.97$142.97$177.51
Group 18$69.18$17.45$17.40$2.95$1.10$0.458$108.53$143.12$143.12$177.71
Group 19$69.29$17.45$17.40$2.95$1.10$0.458$108.64$143.285$143.285$177.93
Group 20$69.41$17.45$17.40$2.95$1.10$0.458$108.76$143.465$143.465$178.17
Group 21$69.58$17.45$17.40$2.95$1.10$0.458$108.93$143.72$143.72$178.51
Group 22$69.68$17.45$17.40$2.95$1.10$0.458$109.03$143.87$143.87$178.71
Group 23$69.79$17.45$17.40$2.95$1.10$0.458$109.14$144.035$144.035$178.93
Group 24$69.91$17.45$17.40$2.95$1.10$0.458$109.26$144.215$144.215$179.17
Group 25$70.08$17.45$17.40$2.95$1.10$0.458$109.43$144.47$144.47$179.51

Multi-Shift#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursfTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$65.40$17.45$17.40$2.95$1.10$0.458$104.75$137.45$137.45$170.15
Group 2$66.18$17.45$17.40$2.95$1.10$0.458$105.53$138.62$138.62$171.71
Group 3$66.47$17.45$17.40$2.95$1.10$0.458$105.82$139.055$139.055$172.29
Group 4$67.96$17.45$17.40$2.95$1.10$0.458$107.31$141.29$141.29$175.27
Group 5$68.06$17.45$17.40$2.95$1.10$0.458$107.41$141.44$141.44$175.47
Group 6$68.18$17.45$17.40$2.95$1.10$0.458$107.53$141.62$141.62$175.71
Group 7$68.28$17.45$17.40$2.95$1.10$0.458$107.63$141.77$141.77$175.91
Group 8$68.29$17.45$17.40$2.95$1.10$0.458$107.64$141.785$141.785$175.93
Group 9$68.39$17.45$17.40$2.95$1.10$0.458$107.74$141.935$141.935$176.13
Group 10$68.41$17.45$17.40$2.95$1.10$0.458$107.76$141.965$141.965$176.17
Group 11$68.51$17.45$17.40$2.95$1.10$0.458$107.86$142.115$142.115$176.37
Group 12$68.58$17.45$17.40$2.95$1.10$0.458$107.93$142.22$142.22$176.51
Group 13$68.68$17.45$17.40$2.95$1.10$0.458$108.03$142.37$142.37$176.71
Group 14$68.71$17.45$17.40$2.95$1.10$0.458$108.06$142.415$142.415$176.77
Group 15$68.79$17.45$17.40$2.95$1.10$0.458$108.14$142.535$142.535$176.93
Group 16$68.91$17.45$17.40$2.95$1.10$0.458$108.26$142.715$142.715$177.17
Group 17$69.08$17.45$17.40$2.95$1.10$0.458$108.43$142.97$142.97$177.51
Group 18$69.18$17.45$17.40$2.95$1.10$0.458$108.53$143.12$143.12$177.71
Group 19$69.29$17.45$17.40$2.95$1.10$0.458$108.64$143.285$143.285$177.93
Group 20$69.41$17.45$17.40$2.95$1.10$0.458$108.76$143.465$143.465$178.17
Group 21$69.58$17.45$17.40$2.95$1.10$0.458$108.93$143.72$143.72$178.51
Group 22$69.68$17.45$17.40$2.95$1.10$0.458$109.03$143.87$143.87$178.71
Group 23$69.79$17.45$17.40$2.95$1.10$0.458$109.14$144.035$144.035$178.93
Group 24$69.91$17.45$17.40$2.95$1.10$0.458$109.26$144.215$144.215$179.17
Group 25$70.08$17.45$17.40$2.95$1.10$0.458$109.43$144.47$144.47$179.51

Footnotes as printed on the DIR determination PDF, SC-23-63-2-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classifications within each group, see Pages 7 through 11.
  • b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
  • c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
  • d Includes an amount for Annuity.
  • e Includes an amount withheld for supplemental dues.
  • f The Third Shift shall work 6.5 hours, exclusive of meal period, for which 8 hours straight-time shall be paid at the non-shift rate, Monday through Friday.
  • ** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Cranes, Pile Driver and Hoisting Equipment (Operating Engineer)#, Southern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (11)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Luis Obispo; Santa Barbara; Ventura

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$65.75$17.45$17.40$2.95$1.10$0.458$105.10$137.975$137.975$170.85
Group 2$66.53$17.45$17.40$2.95$1.10$0.458$105.88$139.145$139.145$172.41
Group 3$66.82$17.45$17.40$2.95$1.10$0.458$106.17$139.58$139.58$172.99
Group 4$66.96$17.45$17.40$2.95$1.10$0.458$106.31$139.79$139.79$173.27
Group 5$67.18$17.45$17.40$2.95$1.10$0.458$106.53$140.12$140.12$173.71
Group 6$67.29$17.45$17.40$2.95$1.10$0.458$106.64$140.285$140.285$173.93
Group 7$67.41$17.45$17.40$2.95$1.10$0.458$106.76$140.465$140.465$174.17
Group 8$67.58$17.45$17.40$2.95$1.10$0.458$106.93$140.72$140.72$174.51
Group 9$67.75$17.45$17.40$2.95$1.10$0.458$107.10$140.975$140.975$174.85
Group 10$68.75$17.45$17.40$2.95$1.10$0.458$108.10$142.475$142.475$176.85
Group 11$69.75$17.45$17.40$2.95$1.10$0.458$109.10$143.975$143.975$178.85
Group 12$70.75$17.45$17.40$2.95$1.10$0.458$110.10$145.475$145.475$180.85
Group 13$71.75$17.45$17.40$2.95$1.10$0.458$111.10$146.975$146.975$182.85

Special Shift#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$66.75$17.45$17.40$2.95$1.10$0.458$106.10$139.475$139.475$172.85
Group 2$67.53$17.45$17.40$2.95$1.10$0.458$106.88$140.645$140.645$174.41
Group 3$67.82$17.45$17.40$2.95$1.10$0.458$107.17$141.08$141.08$174.99
Group 4$67.96$17.45$17.40$2.95$1.10$0.458$107.31$141.29$141.29$175.27
Group 5$68.18$17.45$17.40$2.95$1.10$0.458$107.53$141.62$141.62$175.71
Group 6$68.29$17.45$17.40$2.95$1.10$0.458$107.64$141.785$141.785$175.93
Group 7$68.41$17.45$17.40$2.95$1.10$0.458$107.76$141.965$141.965$176.17
Group 8$68.58$17.45$17.40$2.95$1.10$0.458$107.93$142.22$142.22$176.51
Group 9$68.75$17.45$17.40$2.95$1.10$0.458$108.10$142.475$142.475$176.85
Group 10$69.75$17.45$17.40$2.95$1.10$0.458$109.10$143.975$143.975$178.85
Group 11$70.75$17.45$17.40$2.95$1.10$0.458$110.10$145.475$145.475$180.85
Group 12$71.75$17.45$17.40$2.95$1.10$0.458$111.10$146.975$146.975$182.85
Group 13$72.75$17.45$17.40$2.95$1.10$0.458$112.10$148.475$148.475$184.85

Multi-Shift#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursfTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$66.75$17.45$17.40$2.95$1.10$0.458$106.10$139.475$139.475$172.85
Group 2$67.53$17.45$17.40$2.95$1.10$0.458$106.88$140.645$140.645$174.41
Group 3$67.82$17.45$17.40$2.95$1.10$0.458$107.17$141.08$141.08$174.99
Group 4$67.96$17.45$17.40$2.95$1.10$0.458$107.31$141.29$141.29$175.27
Group 5$68.18$17.45$17.40$2.95$1.10$0.458$107.53$141.62$141.62$175.71
Group 6$68.29$17.45$17.40$2.95$1.10$0.458$107.64$141.785$141.785$175.93
Group 7$68.41$17.45$17.40$2.95$1.10$0.458$107.76$141.965$141.965$176.17
Group 8$68.58$17.45$17.40$2.95$1.10$0.458$107.93$142.22$142.22$176.51
Group 9$68.75$17.45$17.40$2.95$1.10$0.458$108.10$142.475$142.475$176.85
Group 10$69.75$17.45$17.40$2.95$1.10$0.458$109.10$143.975$143.975$178.85
Group 11$70.75$17.45$17.40$2.95$1.10$0.458$110.10$145.475$145.475$180.85
Group 12$71.75$17.45$17.40$2.95$1.10$0.458$111.10$146.975$146.975$182.85
Group 13$72.75$17.45$17.40$2.95$1.10$0.458$112.10$148.475$148.475$184.85

Footnotes as printed on the DIR determination PDF, SC-23-63-2-2026-2B

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classifications within each group, see Pages 4 and 5.
  • b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
  • c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
  • d Includes an amount for Annuity.
  • e Includes an amount withheld for supplemental dues.
  • f The Third Shift shall work 6.5 hours, exclusive of meal period, for which 8 hours straight-time shall be paid at the non-shift rate, Monday through Friday.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Tunnel (Operating Engineer)#, Southern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (11)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Luis Obispo; Santa Barbara; Ventura

Tunnel (Operating Engineer)#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ x)bSaturday Overtime Hourly Rate (1½ x)cSunday/Holiday Overtime Hourly Rate (2 x)
Group 1$66.25$17.45$17.40$2.95$1.10$0.458$105.60$138.725$138.725$171.85
Group 2$67.03$17.45$17.40$2.95$1.10$0.458$106.38$139.895$139.895$173.41
Group 3$67.32$17.45$17.40$2.95$1.10$0.458$106.67$140.33$140.33$173.99
Group 4$67.46$17.45$17.40$2.95$1.10$0.458$106.81$140.54$140.54$174.27
Group 5$67.68$17.45$17.40$2.95$1.10$0.458$107.03$140.87$140.87$174.71
Group 6$67.79$17.45$17.40$2.95$1.10$0.458$107.14$141.035$141.035$174.93
Group 7$67.91$17.45$17.40$2.95$1.10$0.458$107.26$141.215$141.215$175.17
Group 8$69.26$17.45$17.40$2.95$1.10$0.458$108.61$143.24$143.24$177.87
Group 9$68.21$17.45$17.40$2.95$1.10$0.458$107.56$141.665$141.665$175.77

Tunnel (Operating Engineer) (Multi-Shift)#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ x)bSaturday Overtime Hourly Rate (1½ x)cSunday/Holiday Overtime Hourly Rate (2 x)
Group 1$66.25$17.45$17.40$2.95$1.10$0.457.5$105.60$138.725$138.725$171.85
Group 2$67.03$17.45$17.40$2.95$1.10$0.457.5$106.38$139.895$139.895$173.41
Group 3$67.32$17.45$17.40$2.95$1.10$0.457.5$106.67$140.33$140.33$173.99
Group 4$67.46$17.45$17.40$2.95$1.10$0.457.5$106.81$140.54$140.54$174.27
Group 5$67.68$17.45$17.40$2.95$1.10$0.457.5$107.03$140.87$140.87$174.71
Group 6$67.79$17.45$17.40$2.95$1.10$0.457.5$107.14$141.035$141.035$174.93
Group 7$67.91$17.45$17.40$2.95$1.10$0.457.5$107.26$141.215$141.215$175.17
Group 8$69.26$17.45$17.40$2.95$1.10$0.457.5$108.61$143.24$143.24$177.87
Group 9$68.21$17.45$17.40$2.95$1.10$0.457.5$107.56$141.665$141.665$175.77

Footnotes as printed on the DIR determination PDF, SC-23-63-2-2026-2C

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classifications within each group, see Page 3.
  • b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
  • c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
  • d Includes an amount for Annuity.
  • e Includes an amount withheld for supplemental dues.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Dredger (Operating Engineer)#, Southern California

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (12)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Diego; San Luis Obispo; Santa Barbara; Ventura

ClassificationBasic hourly rateHealth and welfarePensionaVacation and holidaybTrainingOtherHoursTotal hourly rateDaily (1 ½ X)cSaturday (1 ½ X)cSunday (2 X)Holiday (3X)
Chief Engineer, Deck Captain$65.90$17.45$21.40$6.70$1.10$0.158$112.70$145.65$145.65$178.60$244.50
Leverman$68.90$17.45$21.40$6.70$1.10$0.158$115.70$150.15$150.15$184.60$253.50
Watch Engineer, Deckmate$62.82$17.45$21.40$6.70$1.10$0.158$109.62$141.03$141.03$172.44$235.26
Winchman (Stern Winch on Dredge)$62.27$17.45$21.40$6.70$1.10$0.158$109.07$140.21$140.21$171.34$233.61
Fireman-Oiler, Leveehand, Deckhand (can operate anchor scow under direction of mate), Bargeman$61.73$17.45$21.40$6.70$1.10$0.158$108.53$139.40$139.40$170.26$231.99
Dozer Operator$62.93$17.45$21.40$6.70$1.10$0.158$109.73$141.20$141.20$172.66$235.59
Hydrographic Surveyor$64.36$17.45$21.40$6.70$1.10$0.158$111.16$143.34$143.34$175.52$239.88
Barge Mate$62.34$17.45$21.40$6.70$1.10$0.158$109.14$140.31$140.31$171.48$233.82
Welder$64.32$17.45$21.40$6.70$1.10$0.158$111.12$143.28$143.28$175.44$239.76

Footnotes as printed on the DIR determination PDF, SC-63-12-23-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount for annuity.
  • b Includes an amount for supplemental dues.
  • c Rate applies to the first 4 daily overtime hours and first 12 hours on Saturdays. All other time is paid at the Sunday overtime rate.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Landscape Operating Engineer#, Southern California

Expired on October 31, 2026 This determination's expiration date is before the date these pages were built (November 13, 2026), so the figures below may no longer be the ones to use on a current bid. The asterisk explanation below says why. Check DIR's current list for a newer determination.

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (12)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Diego; San Luis Obispo; Santa Barbara; Ventura

ClassificationBasic hourly rateHealth and welfarePensionaVacation and holidaybTrainingOtherHoursTotal hourly rateDaily/Saturday Overtime Hourly Rate (1½ X)cSunday Overtime Hourly Rate (2X)dHoliday Overtime Hourly Rate (3X)d
Landscape Operating Engineer (Journeyperson): Backhoe Operators; Skidsteer; Forklifts-Tree Planting Equipment (jobsite); HDR Welder-Landscape, Irrigation, Operating Engineers' Equipment; Mulching Tractors; Roller Operators; Rubber-tired & Track Earthmoving Equipment; Skiploader Operators; Trencher-31 horsepower and up$55.51$15.20$15.65$2.95$1.10$0.158.0$90.56$118.315$146.07$201.58

Footnotes as printed on the DIR determination PDF, SC-63-12-33-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a Includes an amount for the Defined Contribution Plan (Annuity).
  • b Includes an amount per hour worked for supplemental dues.
  • c Rate applies to the first four overtime hours daily and the first twelve hours on Saturday. Thereafter use the Sunday overtime rate.
  • d All work performed on a Dewatering Operation on holidays and all other work on holidays except Labor Day and the 1st Saturday following the 1st Friday in the months of June and December is paid at Sunday rate.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Landfill Worker (Operating Engineer), Southern California

Expired on June 30, 2026 This determination's expiration date is before the date these pages were built (November 13, 2026), so the figures below may no longer be the ones to use on a current bid. The asterisk explanation below says why. Check DIR's current list for a newer determination.

Under 8 CCR 16204(b), a single asterisk after the expiration date means a determination in effect on the date of advertisement for bids remains in effect for the life of the project. See the asterisks guide.

Localities as printed on the determination (12)

Imperial; Inyo; Kern; Los Angeles; Mono; Orange; Riverside; San Bernardino; San Diego; San Luis Obispo; Santa Barbara; Ventura

ClassificationBasic hourly rateHealth and welfareaPensionVacation and holidaybHoursTotal hourly ratecDaily/Holiday Overtime Hourly Rate (1 ½ X)dSunday Overtime Hourly Rate (2 X)
Heavy Duty Repairman and/or Welder$40.75$6.32$9.65$0.78e8.0$57.50$70.775$91.15
Equipment Operator II$31.25$6.14$9.65$0.60f8.0$47.64$56.525$72.15
Equipment Operator III$32.25$6.16$9.65$0.62g8.0$48.68$58.025$74.15
PM Tech$33.50$6.18$9.65$0.64h8.0$49.97$59.90$76.65
Laborer/Spotter$23.60$5.99$4.07$0.45i8.0$34.11$39.47$51.27

Footnotes as printed on the DIR determination PDF, SC-63-12-41-2025-1

  • a Includes amounts for Sick Leave and Health Insurance that apply to the first 173.33 hours worked per month.
  • b This amount applies to the first 173.33 hours worked per month.
  • c Computation is based on the first year of employment. This rate should be increased by any applicable vacation increase as stated in the other footnotes.
  • d Rate applies to all hours worked in excess of forty (40) hours in a workweek or in excess of eight (8) hours in any one day. Rate also applies to sixth consecutive day of work. For any daily hours worked in excess of twelve (12) hours, the Sunday overtime rate would apply.
  • e $1.57 after 2 years of service; $2.35 after 5 years of service.
  • f $1.20 after 2 years of service; $1.80 after 5 years of service.
  • g $1.24 after 2 years of service; $1.86 after 5 years of service.
  • h $1.29 after 2 years of service; $1.93 after 5 years of service.
  • i $0.91 after 2 years of service; $1.36 after 5 years of service.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Operating Engineer#, San Diego

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (1)

San Diego County

Operating Engineer#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily Overtime (1½ X)bSaturday Overtime (1½ X)cSunday/Holiday Overtime (2X)
Group 1$62.40$17.45$18.40$3.95$1.10$0.418$103.71$134.91$134.91$166.11
Group 2$63.18$17.45$18.40$3.95$1.10$0.418$104.49$136.08$136.08$167.67
Group 3$63.47$17.45$18.40$3.95$1.10$0.418$104.78$136.515$136.515$168.25
Group 4$64.96$17.45$18.40$3.95$1.10$0.418$106.27$138.75$138.75$171.23
Group 6$65.18$17.45$18.40$3.95$1.10$0.418$106.49$139.08$139.08$171.67
Group 8$65.29$17.45$18.40$3.95$1.10$0.418$106.60$139.245$139.245$171.89
Group 10$65.41$17.45$18.40$3.95$1.10$0.418$106.72$139.425$139.425$172.13
Group 12$65.58$17.45$18.40$3.95$1.10$0.418$106.89$139.68$139.68$172.47
Group 13$65.68$17.45$18.40$3.95$1.10$0.418$106.99$139.83$139.83$172.67
Group 14$65.71$17.45$18.40$3.95$1.10$0.418$107.02$139.875$139.875$172.73
Group 15$65.79$17.45$18.40$3.95$1.10$0.418$107.10$139.995$139.995$172.89
Group 16$65.91$17.45$18.40$3.95$1.10$0.418$107.22$140.175$140.175$173.13
Group 17$66.08$17.45$18.40$3.95$1.10$0.418$107.39$140.43$140.43$173.47
Group 18$66.18$17.45$18.40$3.95$1.10$0.418$107.49$140.58$140.58$173.67
Group 19$66.29$17.45$18.40$3.95$1.10$0.418$107.60$140.745$140.745$173.89
Group 20$66.41$17.45$18.40$3.95$1.10$0.418$107.72$140.925$140.925$174.13
Group 21$66.58$17.45$18.40$3.95$1.10$0.418$107.89$141.18$141.18$174.47
Group 22$66.68$17.45$18.40$3.95$1.10$0.418$107.99$141.33$141.33$174.67
Group 23$66.79$17.45$18.40$3.95$1.10$0.418$108.10$141.495$141.495$174.89
Group 24$66.91$17.45$18.40$3.95$1.10$0.418$108.22$141.675$141.675$175.13
Group 25$67.08$17.45$18.40$3.95$1.10$0.418$108.39$141.93$141.93$175.47

Operating Engineer (Special Shift)#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily Overtime (1½ X)bSaturday Overtime (1½ X)cSunday/Holiday Overtime (2X)
Group 1$63.40$17.45$18.40$3.95$1.10$0.418$104.71$136.41$136.41$168.11
Group 2$64.18$17.45$18.40$3.95$1.10$0.418$105.49$137.58$137.58$169.67
Group 3$64.47$17.45$18.40$3.95$1.10$0.418$105.78$138.015$138.015$170.25
Group 4$65.96$17.45$18.40$3.95$1.10$0.418$107.27$140.25$140.25$173.23
Group 6$66.18$17.45$18.40$3.95$1.10$0.418$107.49$140.58$140.58$173.67
Group 8$66.29$17.45$18.40$3.95$1.10$0.418$107.60$140.745$140.745$173.89
Group 10$66.41$17.45$18.40$3.95$1.10$0.418$107.72$140.925$140.925$174.13
Group 12$66.58$17.45$18.40$3.95$1.10$0.418$107.89$141.18$141.18$174.47
Group 13$66.68$17.45$18.40$3.95$1.10$0.418$107.99$141.33$141.33$174.67
Group 14$66.71$17.45$18.40$3.95$1.10$0.418$108.02$141.375$141.375$174.73
Group 15$66.79$17.45$18.40$3.95$1.10$0.418$108.10$141.495$141.495$174.89
Group 16$66.91$17.45$18.40$3.95$1.10$0.418$108.22$141.675$141.675$175.13
Group 17$67.08$17.45$18.40$3.95$1.10$0.418$108.39$141.93$141.93$175.47
Group 18$67.18$17.45$18.40$3.95$1.10$0.418$108.49$142.08$142.08$175.67
Group 19$67.29$17.45$18.40$3.95$1.10$0.418$108.60$142.245$142.245$175.89
Group 20$67.41$17.45$18.40$3.95$1.10$0.418$108.72$142.425$142.425$176.13
Group 21$67.58$17.45$18.40$3.95$1.10$0.418$108.89$142.68$142.68$176.47
Group 22$67.68$17.45$18.40$3.95$1.10$0.418$108.99$142.83$142.83$176.67
Group 23$67.79$17.45$18.40$3.95$1.10$0.418$109.10$142.995$142.995$176.89
Group 24$67.91$17.45$18.40$3.95$1.10$0.418$109.22$143.175$143.175$177.13
Group 25$68.08$17.45$18.40$3.95$1.10$0.418$109.39$143.43$143.43$177.47

Operating Engineer (Multi-Shift)#

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursfTotal hourly rateDaily Overtime (1½ X)bSaturday Overtime (1½ X)cSunday/Holiday Overtime (2X)
Group 1$63.40$17.45$18.40$3.95$1.10$0.418$104.71$136.41$136.41$168.11
Group 2$64.18$17.45$18.40$3.95$1.10$0.418$105.49$137.58$137.58$169.67
Group 3$64.47$17.45$18.40$3.95$1.10$0.418$105.78$138.015$138.015$170.25
Group 4$65.96$17.45$18.40$3.95$1.10$0.418$107.27$140.25$140.25$173.23
Group 5$66.06$17.45$18.40$3.95$1.10$0.418$107.37$140.40$140.40$173.43
Group 6$66.18$17.45$18.40$3.95$1.10$0.418$107.49$140.58$140.58$173.67
Group 7$66.28$17.45$18.40$3.95$1.10$0.418$107.59$140.73$140.73$173.87
Group 8$66.29$17.45$18.40$3.95$1.10$0.418$107.60$140.745$140.745$173.89
Group 9$66.39$17.45$18.40$3.95$1.10$0.418$107.70$140.895$140.895$174.09
Group 10$66.41$17.45$18.40$3.95$1.10$0.418$107.72$140.925$140.925$174.13
Group 11$66.51$17.45$18.40$3.95$1.10$0.418$107.82$141.075$141.075$174.33
Group 12$66.58$17.45$18.40$3.95$1.10$0.418$107.89$141.18$141.18$174.47
Group 13$66.68$17.45$18.40$3.95$1.10$0.418$107.99$141.33$141.33$174.67
Group 14$66.71$17.45$18.40$3.95$1.10$0.418$108.02$141.375$141.375$174.73
Group 15$66.79$17.45$18.40$3.95$1.10$0.418$108.10$141.495$141.495$174.89
Group 16$66.91$17.45$18.40$3.95$1.10$0.418$108.22$141.675$141.675$175.13
Group 17$67.08$17.45$18.40$3.95$1.10$0.418$108.39$141.93$141.93$175.47
Group 18$67.18$17.45$18.40$3.95$1.10$0.418$108.49$142.08$142.08$175.67
Group 19$67.29$17.45$18.40$3.95$1.10$0.418$108.60$142.245$142.245$175.89
Group 20$67.41$17.45$18.40$3.95$1.10$0.418$108.72$142.425$142.425$176.13
Group 21$67.58$17.45$18.40$3.95$1.10$0.418$108.89$142.68$142.68$176.47
Group 22$67.68$17.45$18.40$3.95$1.10$0.418$108.99$142.83$142.83$176.67
Group 23$67.79$17.45$18.40$3.95$1.10$0.418$109.10$142.995$142.995$176.89
Group 24$67.91$17.45$18.40$3.95$1.10$0.418$109.22$143.175$143.175$177.13
Group 25$68.08$17.45$18.40$3.95$1.10$0.418$109.39$143.43$143.43$177.47

The PDF lists what each group covers on pages 7 through 11.

Footnotes as printed on the DIR determination PDF, SD-23-63-3-2026-2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classifications within each group, see Pages 7 through 11.
  • b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
  • c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
  • d Includes an amount for Annuity.
  • e Includes an amount withheld for supplemental dues.
  • f The Third Shift shall work 6.5 hours, exclusive of meal period, for which 8 hours straight-time shall be paid at the non-shift rate, Monday through Friday.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Cranes, Pile Driving and Hoisting Equipment (Operating Engineer)#, San Diego

  • Determination: SD-23-63-3-2026-2B
  • Region and counties: San Diego. 1 county.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (**)
  • Printed in the same PDF: SD-23-63-3-2026-2B1, SD-23-63-3-2026-2B2, each in its own section on this page.
  • Source: DIR determination PDF, SD-23-63-3-2026-2B

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (1)

San Diego County

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$63.75$17.45$18.40$3.95$1.10$0.418$105.06$136.935$136.935$168.81
Group 2$64.53$17.45$18.40$3.95$1.10$0.418$105.84$138.105$138.105$170.37
Group 3$64.82$17.45$18.40$3.95$1.10$0.418$106.13$138.54$138.54$170.95
Group 4$64.96$17.45$18.40$3.95$1.10$0.418$106.27$138.75$138.75$171.23
Group 5$65.18$17.45$18.40$3.95$1.10$0.418$106.49$139.08$139.08$171.67
Group 6$65.29$17.45$18.40$3.95$1.10$0.418$106.60$139.245$139.245$171.89
Group 7$65.41$17.45$18.40$3.95$1.10$0.418$106.72$139.425$139.425$172.13
Group 8$65.58$17.45$18.40$3.95$1.10$0.418$106.89$139.68$139.68$172.47
Group 9$65.75$17.45$18.40$3.95$1.10$0.418$107.06$139.935$139.935$172.81
Group 10$66.75$17.45$18.40$3.95$1.10$0.418$108.06$141.435$141.435$174.81
Group 11$67.75$17.45$18.40$3.95$1.10$0.418$109.06$142.935$142.935$176.81
Group 12$68.75$17.45$18.40$3.95$1.10$0.418$110.06$144.435$144.435$178.81
Group 13$69.75$17.45$18.40$3.95$1.10$0.418$111.06$145.935$145.935$180.81

Classifications within each group are listed on pages 4 and 5 of the PDF.

Footnotes as printed on the DIR determination PDF, SD-23-63-3-2026-2B

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classcations within each group, see pages 4 thru 5.
  • b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
  • c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
  • d Includes an amount for annuity.
  • e Includes an amount withheld for supplemental dues.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Cranes, Pile Driving and Hoisting Equipment (Operating Engineer) (Special Shift)#, San Diego

  • Determination: SD-23-63-3-2026-2B1
  • Region and counties: San Diego. 1 county.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (**)
  • Applies to: Special shift applies only when one shift is working and it is outside the regular starting times for shifts.
  • Printed in the same PDF: SD-23-63-3-2026-2B, SD-23-63-3-2026-2B2, each in its own section on this page.
  • Source: DIR determination PDF, SD-23-63-3-2026-2B1

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (1)

San Diego County

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$64.75$17.45$18.40$3.95$1.10$0.418$106.06$138.435$138.435$170.81
Group 2$65.53$17.45$18.40$3.95$1.10$0.418$106.84$139.605$139.605$172.37
Group 3$65.82$17.45$18.40$3.95$1.10$0.418$107.13$140.04$140.04$172.95
Group 4$65.96$17.45$18.40$3.95$1.10$0.418$107.27$140.25$140.25$173.23
Group 5$66.18$17.45$18.40$3.95$1.10$0.418$107.49$140.58$140.58$173.67
Group 6$66.29$17.45$18.40$3.95$1.10$0.418$107.60$140.745$140.745$173.89
Group 7$66.41$17.45$18.40$3.95$1.10$0.418$107.72$140.925$140.925$174.13
Group 8$66.58$17.45$18.40$3.95$1.10$0.418$107.89$141.18$141.18$174.47
Group 9$66.75$17.45$18.40$3.95$1.10$0.418$108.06$141.435$141.435$174.81
Group 10$67.75$17.45$18.40$3.95$1.10$0.418$109.06$142.935$142.935$176.81
Group 11$68.75$17.45$18.40$3.95$1.10$0.418$110.06$144.435$144.435$178.81
Group 12$69.75$17.45$18.40$3.95$1.10$0.418$111.06$145.935$145.935$180.81
Group 13$70.75$17.45$18.40$3.95$1.10$0.418$112.06$147.435$147.435$182.81

Classifications within each group are listed on pages 4 and 5 of the PDF.

Footnotes as printed on the DIR determination PDF, SD-23-63-3-2026-2B1

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classcations within each group, see pages 4 thru 5.
  • b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
  • c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
  • d Includes an amount for annuity.
  • e Includes an amount withheld for supplemental dues.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Cranes, Pile Driving and Hoisting Equipment (Operating Engineer) (Multi-Shift)#, San Diego

  • Determination: SD-23-63-3-2026-2B2
  • Region and counties: San Diego. 1 county.
  • Issue date: August 22, 2026
  • Expiration date: June 30, 2027 (**)
  • Printed in the same PDF: SD-23-63-3-2026-2B, SD-23-63-3-2026-2B1, each in its own section on this page.
  • Source: DIR determination PDF, SD-23-63-3-2026-2B2

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (1)

San Diego County

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursfTotal hourly rateDaily (1 1/2X)bSaturday (1 1/2X)cSunday/Holiday (2X)
Group 1$64.75$17.45$18.40$3.95$1.10$0.418$106.06$138.435$138.435$170.81
Group 2$65.53$17.45$18.40$3.95$1.10$0.418$106.84$139.605$139.605$172.37
Group 3$65.82$17.45$18.40$3.95$1.10$0.418$107.13$140.04$140.04$172.95
Group 4$65.96$17.45$18.40$3.95$1.10$0.418$107.27$140.25$140.25$173.23
Group 5$66.18$17.45$18.40$3.95$1.10$0.418$107.49$140.58$140.58$173.67
Group 6$66.29$17.45$18.40$3.95$1.10$0.418$107.60$140.745$140.745$173.89
Group 7$66.41$17.45$18.40$3.95$1.10$0.418$107.72$140.925$140.925$174.13
Group 8$66.58$17.45$18.40$3.95$1.10$0.418$107.89$141.18$141.18$174.47
Group 9$66.75$17.45$18.40$3.95$1.10$0.418$108.06$141.435$141.435$174.81
Group 10$67.75$17.45$18.40$3.95$1.10$0.418$109.06$142.935$142.935$176.81
Group 11$68.75$17.45$18.40$3.95$1.10$0.418$110.06$144.435$144.435$178.81
Group 12$69.75$17.45$18.40$3.95$1.10$0.418$111.06$145.935$145.935$180.81
Group 13$70.75$17.45$18.40$3.95$1.10$0.418$112.06$147.435$147.435$182.81

Classifications within each group are listed on pages 4 and 5 of the PDF.

Footnotes as printed on the DIR determination PDF, SD-23-63-3-2026-2B2

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classcations within each group, see pages 4 thru 5.
  • b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
  • c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
  • d Includes an amount for annuity.
  • e Includes an amount withheld for supplemental dues.
  • f The third-shift shall work 6.5 hours, exclusive of meal period, for which 8 hours straight-time shall be paid at the non-shift rate, Monday through Friday.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Tunnel Operating Engineer#, San Diego

Under 8 CCR 16204(b), a double asterisk means the basic hourly rate, overtime and holiday pay rates, and employer payments for work performed after the expiration date have been predetermined, and the new rate must be paid. See the guide to predetermined increases for how to get it.

Localities as printed on the determination (1)

San Diego County

ClassificationaBasic hourly rateHealth and welfarePensiondVacation and holidayeTrainingOtherHoursTotal hourly rateDaily Overtime Hourly Rate (1½ X)bSaturday Overtime Hourly Rate (1½ X)cSunday/Holiday Overtime Hourly Rate (2X)
Group 1$64.25$17.45$18.40$3.95$1.10$0.418$105.56$137.685$137.685$169.81
Group 2$65.03$17.45$18.40$3.95$1.10$0.418$106.34$138.855$138.855$171.37
Group 3$65.32$17.45$18.40$3.95$1.10$0.418$106.63$139.29$139.29$171.95
Group 4$65.46$17.45$18.40$3.95$1.10$0.418$106.77$139.50$139.50$172.23
Group 5$65.68$17.45$18.40$3.95$1.10$0.418$106.99$139.83$139.83$172.67
Group 6$65.79$17.45$18.40$3.95$1.10$0.418$107.10$139.995$139.995$172.89
Group 7$65.91$17.45$18.40$3.95$1.10$0.418$107.22$140.175$140.175$173.13
Group 8$67.26$17.45$18.40$3.95$1.10$0.418$108.57$142.20$142.20$175.83
Group 9$66.21$17.45$18.40$3.95$1.10$0.418$107.52$140.625$140.625$173.73

Footnotes as printed on the DIR determination PDF, SD-23-63-3-2026-2C

  • # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp).
  • a For classifications within each group, see Page 2.
  • b Rate applies to the first 4 overtime hours. All other daily overtime is paid at the Sunday rate.
  • c Rate applies to the first 12 hours worked. All other time is paid at the Sunday rate.
  • d Includes an amount for Annuity.
  • e Includes an amount withheld for supplemental dues.

Small raised letters and symbols in the table are the footnote marks printed on the DIR determination PDF linked above, shown on the heading, row or figure where the PDF prints them; the list under the table gives each footnote's text. See overtime, shift and holiday pay for how the overtime columns are used.

Counties these determinations cover

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. 8 CCR 16204 dir.ca.gov
  2. important notices page dir.ca.gov
  3. DIR determination PDF, NC-23-63-1-2026-2 dir.ca.gov
  4. DIR determination PDF, NC-23-63-1-2026-2A dir.ca.gov
  5. DIR determination PDF, NC-23-63-1-2026-2B dir.ca.gov
  6. DIR determination PDF, NC-23-63-1-2026-2B1 dir.ca.gov
  7. DIR determination PDF, NC-23-63-1-2026-2C dir.ca.gov
  8. DIR determination PDF, NC-23-63-1-2026-2D dir.ca.gov
  9. DIR determination PDF, NC-23-63-1-2026-2D1 dir.ca.gov
  10. DIR determination PDF, NC-63-3-12-2025-1 dir.ca.gov
  11. DIR determination PDF, NC-63-3-75-2026-1 dir.ca.gov
  12. DIR determination PDF, SC-23-63-2-2026-2 dir.ca.gov
  13. DIR determination PDF, SC-23-63-2-2026-2B dir.ca.gov
  14. DIR determination PDF, SC-23-63-2-2026-2C dir.ca.gov
  15. DIR determination PDF, SC-63-12-23-2026-2 dir.ca.gov
  16. DIR determination PDF, SC-63-12-33-2026-2 dir.ca.gov
  17. DIR determination PDF, SC-63-12-41-2025-1 dir.ca.gov
  18. DIR determination PDF, SD-23-63-3-2026-2 dir.ca.gov
  19. DIR determination PDF, SD-23-63-3-2026-2B dir.ca.gov
  20. DIR determination PDF, SD-23-63-3-2026-2C dir.ca.gov

Paying these rates on a public job? First filing free

Send the payroll export you already run. We turn it into the WH-347 and the DIR eCPR filing, checked by software and verified by a person. First filing free, before you pay us anything. $995 one time setup, then $249 per month flat for crews up to 25 workers.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallFirst filing free