Alabama certified payroll: how ALDOT checks it, and what AL-100 and AL-150 are

This page covers weekly payroll on ALDOT federal-aid highway contracts, from ALDOT's Construction Manual section 109 (updated July 2025), and its Office Engineer forms list and forms.

Last reviewed against the sources it cites

The short answer

Alabama has no prevailing wage law (repealed 1980), so on ALDOT federal-aid work the payroll duty comes from the contract. The prime sends the project manager each week's payrolls for itself and every sub, within 7 days after wages are paid. The prime's documents are its labor reports and the AL-100, plus the AL-150 if it has an approved sub. Project staff check them against ALDOT's own activity records.

  • Alabama's Prevailing Wage Act, sections 39-4-1 through 39-4-18, is listed as repealed effective May 19, 1980, in ADECA's public works law manual (updated September 2021).
  • Construction Manual 109-9 (updated 7/2025) has the prime submit weekly payrolls for its own and all subcontractor employees to the project manager, one original and one copy on paper, within 7 days after wages are paid.
  • The federal contract clause in 29 CFR 5.5(a)(3)(ii)(A) says only to submit weekly, so the 7-day window is ALDOT's own.
  • AL-100 is ALDOT's Statement of Compliance (Rev. 10/2026) and AL-150 is the prime's weekly Active or Inactive list of approved subs, and both blank forms are on ALDOT's Office Engineer forms list.
  • Manual 109-8 requires the prime to pay subcontractors within 14 calendar days of receiving ALDOT payment and to give the project manager a notarized statement within 60 days of the close of the estimate period.
  • ALDOT's Notice to Contractors says that from October 1, 2026 primes and subs must submit certified payroll on the revised WH-347 or an alternative format that captures every element of it.

Alabama has no prevailing wage law

Alabama has no prevailing wage law. On ALDOT federal-aid work the duty comes from the contract. ADECA's Competitive Bid and Public Works Law Manual (updated September 2021) lists the Prevailing Wage Act, sections 39-4-1 through 39-4-18, as repealed effective May 19, 1980. Bryson v. Central Electric Co. quotes the act's sunset clause and records that the 1980 session closed on May 19, 1980 without continuing it.

ALDOT's August 28, 2026 Notice to Contractors puts predetermined minimum wage rates under "For Federal Aid Projects". Manual 109-9 says Special Provision FH0001 is in every contract with federal funding and makes Davis-Bacon compliance a contract requirement. The manual's section 2.12 (May 29, 2012) says its requirements apply to Federal Aid projects, but that all projects are subject to investigation by the Department of Labor and appropriate records should be maintained on all projects. Other states are in the state table.

What goes to ALDOT each week

The prime submits the package to the ALDOT project manager, for its own employees and all subcontractor employees.

ItemWhat it doesWho signs
Certified payroll, WH-347 or equivalentEach contractor's and sub's weekly payrollEach employer; the prime submits them all
AL-100, Statement of Compliance (Rev. 10/2026)Certifies the payroll and the wage and fringe rates paidThe contractor or sub, or their agent who paid or supervised payment of the workers
AL-150, Statement Required on All Projects in the State of Alabama (Rev. September 2018)Marks the prime and each approved sub Active or Inactive for the weekThe prime, then the ALDOT project engineer
OE-Payroll Form (Rev. 7-2026), signer authorization: ask whether your project needs itNames who may sign payroll affidavits for the firmA president or vice-president, sworn before a notary

AL-100

ALDOT's instructions on the AL-100 say each certified payroll submission must include a signed Statement of Compliance. They walk through the same checkbox statements as page 2 of the revised WH-347, which our WH-347 guide covers. Each contractor gets its own. The manual's 2012 section 2.12 lists the prime's documents as its labor reports and the AL-100, plus the AL-150 if applicable, and a sub's as its labor reports and an AL-100 if it is active.

AL-150

On the AL-150 the prime lists itself and each approved sub as Active or Inactive for the week ending date. It states that the subs listed as Active were the only subcontractors working under the contract that week and that labor reports are attached. The ALDOT project engineer signs a second line, and the instructions say the engineer checks the form against ALDOT's records of weekly activity. The AL-150 instructions attach the AL-100 to the payroll for the active prime and each active sub. A prime with no approved sub does not submit an AL-150. When a sub sends its final labor report, mark it Final on both forms and drop its name from later AL-150s.

Manual 109-9 words the forms as going in weekly "when subcontractors are performing work". The manual also mentions "affidavits" without naming a form, so ask whether an OE-Payroll Form is needed for your signer.

When and how it goes in

  1. Collect every sub's payroll. The prime is responsible for submitting them.
  2. Prepare the AL-100 and AL-150. The prime sends its own AL-100, and the AL-150 when it has an approved sub.
  3. Submit one original and one copy, on paper, to the project manager within 7 days after wages are paid. The 2012 section 2.12 and the AL-150 instructions say two copies, so confirm the count.
  4. Start in the first week of work for the prime and each sub.

The 7-day window is ALDOT's. The federal contract clause in 29 CFR 5.5(a)(3)(ii)(A) says only to submit weekly. The manual describes paper. The federal clause lets an agency permit electronic submission, so ask before sending PDFs.

What the project manager checks

Staff check each form for completeness, accuracy and reasonableness against ALDOT's contractor activity records. The manual's checklist includes:

  • The correct project number, county and week ending date.
  • Documents for each contractor and sub working on the project, with active or inactive status.
  • Each worker's employer, sex, race, and last four digits of the Social Security number or an employee number.
  • The classification as listed in the contract, the minimum pay rate, and any deductions.
  • Authorized titles and signatures.

The federal list of required payroll information in 29 CFR 5.5(a)(3)(i)(B) has no sex or race item, so a report built only from it will lack them. A classification missing from the contract goes through the SF-1444 process.

If your package comes back

The manual says the contractor is notified of all deficiencies and corrections are made before the final area construction office review. Contractor corrections are in blue ink, authorization to make corrections is documented in writing (email is appropriate), and staff corrections are in red ink and initialed.

For a wage shortfall, the only posted procedure is the manual's 2012 section 2.12, dated May 29, 2012 and listed under "previously updated sections" on the Construction Manual page. The project manager notifies the contractor in writing, and that letter is held in suspense until the employees are repaid. The contractor prepares an AL-100, a supplemental payroll and a letter explaining the error.

Manual 109-9 names no late fee or payment hold. The contract clauses do. The paragraphs quoted here are from the FHWA-1273 posted by ALDOT (revised June 25, 2026). ALDOT's notice dated 07/10/2026 says the new form is included in proposals beginning with the July 31, 2026 letting, so earlier-let contracts carry the earlier version, and your contract's own copy controls. The June 2026 form says that from June 10, 2026 physical incorporation in contracts was eliminated and use of the form is now optional for the contracting agency, but ALDOT's notice shows it is still including it and requiring a copy in each subcontract. In the June 2026 revision, Section III, paragraph 3.d.(2), says that if required records are not submitted, the federal agency may, after written notice, cause suspension of further payment, advance or guarantee of funds, and that failing to submit them on request may be grounds for debarment. Paragraph 3 of Section I says a breach may be grounds for withholding progress or final payment. Wage withholding is in our withholding guide, and our debarment guide covers debarment.

The revised WH-347 and FHWA-1273 on ALDOT jobs

ALDOT's notice says the revised WH-347 is required from October 1, 2026, and an alternative format must capture every element of it. The December 4, 2026 notice repeats that text. See which WH-347 version to use for the form. The notices also say a copy of the new FHWA-1273 must go in each subcontract submitted with the Request for Permission to Sublet Work. Our FHWA-1273 guide explains the 2026 rule.

Sub payments and trainee reports

Under manual 109-8, the prime pays subs within 14 calendar days of receiving ALDOT payment. It gives the project manager a signed, notarized statement within 60 days of the close of the estimate period. No retainage may be held on subs.

Where the contract carries the OJT special provision or a training goal, the OJT manual (revised September 2022) has contractors send monthly trainee enrollment and time reports to project personnel, with payroll documentation that substantiates the trainee activity.

If a city or county let the job

ALDOT's standard bid package for locally let federal-aid projects includes the June 25, 2026 FHWA-1273 and a slot for the Davis-Bacon wage rates. Its template note tells the local agency to keep the wage-rate sentence only above $2,000 on or linked to a federal-aid eligible highway. It does not mention AL-100 or AL-150, so ask the local agency where payrolls go.

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Does Alabama require certified payroll on state-funded jobs?
Alabama has no state prevailing wage law. The AL-150 form is titled "All Projects", manual 109-9 describes the weekly labor reports in its discussion of the federal-funding provision FH0001. Check your contract's special provisions.
Do I submit an AL-150 if I have no subcontractors?
No. The AL-150 instructions say it is not required when the prime performs all the work and no sub has been approved.
When is a payroll package late?
The manual's checklist asks for documents within 7 days after wages are paid. It names no fee for a late package.
Where are the blank AL-100 and AL-150 forms?
On ALDOT's Office Engineer forms list, under Payroll Form(s) and Wage Statements, next to the OE-Payroll Form and the SF-1444. The AL-100 there is revised 10/2026 and the AL-150 September 2018.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. Construction Manual section 109 aldot.gov
  2. Office Engineer forms list alletting.dot.state.al.us
  3. ADECA's public works law manual adeca.alabama.gov
  4. 29 CFR 5.5(a)(3)(ii)(A) ecfr.gov
  5. Notice to Contractors alletting.dot.state.al.us
  6. Bryson v. Central Electric Co. hallapproved.com
  7. section 2.12 dot.state.al.us
  8. AL-100 alletting.dot.state.al.us
  9. AL-150 alletting.dot.state.al.us
  10. OE-Payroll Form alletting.dot.state.al.us
  11. Construction Manual page dot.state.al.us
  12. FHWA-1273 posted by ALDOT alletting.dot.state.al.us
  13. December 4, 2026 notice alletting.dot.state.al.us
  14. OJT manual dot.state.al.us
  15. standard bid package for locally let federal-aid projects dot.state.al.us

Questions about your project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us