Davis-Bacon certified payroll for a week with no work
This page compares what the federal rule, HUD, FHWA and two state DOTs say about weeks with no work. The sources are 29 CFR 5.5, HUD Handbook 1344.1, chapter 4 and the FHWA-1273 contract provisions.
Last reviewed against the sources it cites
The short answer
The federal regulation does not say. It requires a certified payroll for each week in which covered work is performed, and it is silent on weeks with none. The answer is in your contract and the agency that collects your payroll: HUD excuses a no work week on two conditions, and Mississippi and South Dakota highway contracts ask for a no work statement or report.
- 29 CFR 5.5(a)(3)(ii)(A) requires certified payrolls "for each week in which any DBA- or Related Acts-covered work is performed" and says nothing about weeks without work (29 CFR 5.5, eCFR current to November 3, 2026).
- FHWA-1273 clause 3.b.(1), revised June 25, 2026, uses the same "each week in which" wording and contains no sentence on idle weeks (FHWA-1273).
- HUD Handbook 1344.1 paragraph 4-3(C) excuses a no work week if your payroll reports are numbered sequentially or you gave written notice that work was suspended (HUD handbook chapter 4, January 2023).
- Mississippi DOT's rule requires, once work has begun, a negative (NO WORK) statement for a period in which no work is completed, on federal-aid and 100% state-funded projects (37 Miss. Code R. 1-7401-04000-101).
- South Dakota DOT's manual, revised February 2026, says no payroll is required for a week without project work, but a No Work report should be marked (SDDOT Chapter 4).
What the federal rule says
The regulation sets a trigger, not an idle-week rule. Under 29 CFR 5.5(a)(3)(ii)(A), the contractor or subcontractor "must submit weekly, for each week in which any DBA- or Related Acts-covered work is performed, certified payrolls." The eCFR page showed Title 29 as up to date as of November 3, 2026. Nothing in that paragraph says what to send for a week when no covered work happened.
Older clause wording differs. The eCFR text as of August 23, 2023 reads "for each week in which any contract work is performed." The eCFR text as of October 23, 2023, uses the current "DBA- or Related Acts-covered" wording. The change comes from the final rule at 88 FR 57734, published August 23, 2023. It took effect October 23, 2023 and, apart from one wage-determination provision, applies only to contracts entered into after that date. Contracts entered into before October 23, 2023 keep the older "any contract work" wording. Both versions tie the payroll to a week of work, and neither addresses an idle week. The clause that binds you is the one your contract incorporates.
The FHWA-1273 contract provisions, revised June 25, 2026, repeat the current wording in clause 3.b.(1). The clause has no sentence about weeks without work. Incorporating the form into federal-aid highway contracts stopped being mandatory on June 10, 2026, so the controlling clause is whatever your contract actually contains. Where your contract includes FHWA-1273, clause 3.b.(1) is silent on idle weeks. Where it does not, read the DOT's own provision.
What the regulation does punish
Failing to submit required records is a separate matter. Under 29 CFR 5.5(a)(3)(iv)(B), if a contractor fails to submit the required records, the federal agency may, after written notice, cause a suspension of further payment, advance or guarantee of funds. Failing to submit records on request may also be grounds for debarment under 29 CFR 5.12. A missing week on an idle job matters if the agency or prime treats it as a required record.
Federal baseline versus what your agency asks
| Source | What it says about a week with no work |
|---|---|
| 29 CFR 5.5(a)(3)(ii)(A) | Payroll due for each week covered work is performed. Silent on idle weeks. |
| FHWA-1273, clause 3.b.(1) | Same wording. No idle-week sentence. |
| HUD Handbook 1344.1, para. 4-3(C) | No report required for a week with no work on the site, if reports are numbered sequentially or you gave written notice of suspension. |
| Mississippi DOT, 37 Miss. Code R. 1-7401-04000-101 | Once work has begun, a negative (NO WORK) statement is required for the period. |
| South Dakota DOT construction manual, ch. 4 (Feb. 2026) | No payroll required for the week, but a No Work report should be marked. |
| Your contract, prime or housing authority | Can ask for more than any of the above. Read it. |
HUD: the two-condition exemption
Chapter 4 of HUD Handbook 1344.1 (REV-3, January 2023) starts with the general duty. Paragraph 4-3 says each employer must prepare, certify and submit payroll reports for each week to the sponsor, applicant or owner for any contract work that is performed.
Paragraph 4-3(B) says reports begin with the first week the employer performs work on the site, and are sent promptly after each pay week closes. Paragraph 4-3(C) then handles "No Work" payrolls. Employers are not required to submit reports for weeks with no work on the site, provided that "the payroll reports are numbered sequentially or that the employer has provided written notice that its work on the project has been suspended."
Read that as two ways to qualify. Number your reports, so a reviewer sees that week 6 follows week 5 and nothing is missing. Or send written notice that you have stopped work. Paragraph 4-11(C) says numbering starts at 1, that HUD encourages but does not require it, and that your last payroll should be marked Final. As a practical reading, not a rule the handbook states, skipping numbers and sending no notice leaves a missing week with no explanation.
Paragraph 4-5 is the stakes. Failure to submit required records can, after written notice to the contractor, cause a suspension of any further payment, advance or guarantee of funds. See our housing authority guide for housing authority payroll rules.
State DOT examples
Mississippi
The Mississippi DOT rule, 37 Miss. Code R. 1-7401-04000-101, says that once work has begun, each contractor and subcontractor submits its weekly payroll on form CAD-880 (plus CAD-881 on federal-aid projects). It adds: "If no work is completed, the contractor/subcontractor will be required to submit a negative (NO WORK) statement for the period." It also says the warrant will not be issued for the monthly estimate if the required payroll reports have not been received. That is how an idle week can hold up a pay application. The rule applies to both federal-aid and 100% state-funded projects. The linked Cornell reproduction of the Mississippi Administrative Code is undated.
South Dakota
The SDDOT construction manual, chapter 4, marked revised February 2026, says each week in which any contract work is performed, payrolls and a Statement of Compliance go in through the Electronic Payroll Submission System run through Elation Systems. It continues: "If project work is not performed then payrolls are not required to be submitted for that week, however a No Work report should be marked." The manual also says the department's bi-weekly progress report, completed by DOT field staff, marks which contractors worked on which days and triggers when payrolls are required. If your name is marked as having worked, expect a payroll request. See our Elation Systems guide for the system itself.
Other state DOTs set their own rules, so get the labor compliance provision from the prime.
Which rule binds you
- Read the contract clause. The federal clause is a floor. A state DOT special provision or housing authority addendum can add a no work statement.
- Check the prime's portal. If the prime or agency runs an electronic system, look for a No Work option or an instruction page.
- Read the agency's labor compliance page. Look for a form, a statement wording, or a due date.
- Ask in writing. Email the prime or labor compliance specialist: "We were idle the week ending [date]. Do you want a no work statement or nothing?" Keep the reply.
- Keep the paper. Under 29 CFR 5.5(a)(3)(ii)(G), certified payrolls are kept during the work and for 3 years after all work on the prime contract is complete. Keep your no work statements, suspension notices and the replies with them.
Do not assume a partial week is idle. If anyone did covered work on the site, even for one day, the weekly payroll is due. Which workers count is a separate question, covered in our working foremen and owners guide.
California and LCPtracker
California has its own statement and its own deadlines. Our California no work performed guide covers them, and the LCPtracker no work payroll guide covers the system steps. This page does not repeat either.
We prepare certified payroll for public works contractors. Tell us about your project.
Questions
Does 29 CFR 5.5 require a payroll for a week with no work?
Does the final payroll need a special mark?
Is the HUD exemption automatic?
What if only one person worked for one day?
Can an idle week delay my payment?
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- 29 CFR 5.5 ecfr.gov
- HUD Handbook 1344.1, chapter 4 hud.gov
- FHWA-1273 contract provisions fhwa.dot.gov
- 37 Miss. Code R. 1-7401-04000-101 law.cornell.edu
- SDDOT Chapter 4 dot.sd.gov
- eCFR text as of August 23, 2023 ecfr.gov
- eCFR text as of October 23, 2023 ecfr.gov
- final rule at 88 FR 57734 federalregister.gov