NDDOT certified payroll in LCPtracker: who approves it, when it is due, and what happens if it is missing

Payroll on North Dakota Department of Transportation federal-aid highway contracts. Sources: NDDOT's LCPtracker special provision (March 7, 2024), its Davis-Bacon Wage and Payroll Requirements Handbook (2026), its LCPtracker FAQ (March 7, 2024) and its Labor Compliance Program page.

Last reviewed against the sources it cites

The short answer

On NDDOT federal-aid highway contracts, the prime and every subcontractor enter weekly certified payroll in LCPtracker. Paper is not accepted. Each payroll is due within seven calendar days after the regular payment date, and the prime's Prime Approver must approve it before NDDOT can see it. A subcontractor must be on an NDDOT list before it can be entered.

  • The special provision dated March 7, 2024 says a payroll the Prime Approver has not approved cannot be viewed by NDDOT and is not deemed submitted.
  • NDDOT's 2026 handbook says payrolls and compliance statements are due within seven calendar days after the regular payment date of the payroll period.
  • A subcontractor not on NDDOT's Approved Subcontractor List or Qualified Contractor List must be placed on one before it can be entered into LCPtracker, and the special provision limits entering subcontractors to Prime Approvers and the Civil Rights Division.
  • NDDOT's LCPtracker FAQ of March 7, 2024 says you can submit a corrected payroll that supersedes an earlier one for 60 days, and after that you need the prime approver's permission to edit.
  • On LCPtracker, the handbook says Social Security numbers are entered as XXX-XX followed by the last four digits.
  • If a contractor fails to submit required records, 29 CFR 5.5(a)(2)(i) lets the agency named in the contract, after written notice, cause suspension of further payment, advance or guarantee of funds until the violations cease.

Your payroll is in LCPtracker, but NDDOT cannot see it

The special provision has the prime contractor name a Prime Approver, who oversees the payroll of every subcontractor at every tier. Until the Prime Approver approves a payroll, NDDOT cannot view it and it is "not deemed submitted." The handbook applies the same gate to the prime's own payroll and says resolving a subcontractor's payroll problems is the prime's job, not the Project Engineer's. Certifying your week is your part. Approval is the step that lets NDDOT see it.

If you are a subcontractor, ask the prime's approver whether your week is waiting. If a payroll was rejected, or project staff asked for a correction, the prime is responsible for seeing that a corrected payroll is submitted. Edit and resubmit steps are in our guide to LCPtracker rejected payroll.

WhoWhat NDDOT's documents assign
Prime contractorNames the Prime Approver after award, assigns subcontractors to the project, and sees that every tier submits payroll, and sees that a corrected payroll is submitted when payroll is rejected or project staff ask for a correction (special provision).
Subcontractor, any tierSets up a contractor account (FAQ), enters each week and certifies it with an e-signature (handbook).

Who submits, how often, and by when

All contractors on NDDOT federal-aid projects, including city and county projects, must submit weekly certified payrolls through LCPtracker, per the special provision. Paper payrolls are not accepted.

QuestionNDDOT's answerSource
Due dateWithin seven calendar days after the regular payment date of the payroll period. A week paid on a Friday is due the next Friday.Handbook
Which contractsFederal-aid highway work bid after October 1, 2017 (handbook; the special provision covers all NDDOT federal-aid projects). State-funded-only contracts need no weekly payroll.FAQ, handbook
CostNone to the contractor. The one possible extra charge is an interface to your accounting software.FAQ

The handbook says a non-federally-funded project tied to a federally funded one makes the whole contract federal. A week with no work can also need a payroll: the FAQ says non-performing payrolls are required if you will be on and off the site. Our no work week guide covers the screen steps, though its deadline rules are Caltrans's.

Our state table lists no state prevailing wage law found for North Dakota. The federal WH-347 is optional under 29 CFR 5.5(a)(3)(ii)(B), but NDDOT requires LCPtracker, so it is not a substitute. Paragraph (a)(3)(ii)(A) lets an agency require an electronic system as long as it permits other methods where a contractor cannot use or access it. The special provision, handbook and FAQ describe none, so ask the Civil Rights Division before sending anything on paper.

The two gates before you can submit

Gate 1: be on an NDDOT list

The special provision says a subcontractor not on the Approved Subcontractor List or the Qualified Contractor List must register and be placed on one before it can be entered into LCPtracker. NDDOT's contractor information page links the Approved Subcontractors list, titled Registered Contractors, and the Qualified Contractors list.

The paper route is SFN 52243, the Subcontractor Registration Request (6-2026), for contractors not already prequalified, DBE certified or registered. Registration expires each December 31. The form has a notary block and asks whether you are debarred from federal-aid contracts. Online registration is also offered.

Gate 2: be entered into the project

The special provision limits entering subcontractors into LCPtracker to Prime Approvers and the Civil Rights Division. The FAQ, which carries the same date, says a contractor account or a Prime Approver account can add one. NDDOT's two documents differ: the special provision says only Prime Approvers or the Civil Rights Division may enter subcontractors, and the FAQ says a contractor or Prime Approver account can do it. The FAQ's own answer is to call the LCP Tracker Program Administrator for help, so do that if you are not yet in the system.

The FAQ says you get an email asking you to set up a contractor account when you are assigned to a project, and you need your federal tax ID. A prime also needs a Prime Approver account. The special provision has the Division set it up; the handbook says that happens automatically when the project is entered; the FAQ says the prime contacts the LCP Tracker Program Administrator to set it up. Calling the Division resolves all three versions. If no email arrived, call the Division at the number on NDDOT's LCPtracker page.

What you enter, and how

  • Social Security numbers. The handbook says to enter them as XXX-XX plus the last four digits. You keep full numbers and addresses and give them to NDDOT, USDOL, FHWA or your prime on request.
  • Signature. The handbook says you set up an e-signature and certify each payroll electronically. Our eSignature guide covers resets. The contractor signs. For spreadsheet uploads, see upload template errors.
  • Truck owner-operators. The handbook says a bona fide truck owner-operator goes on the contractor's payroll with the owner-operator box checked and no hours or wages.

To correct a payroll, the FAQ says you can submit a corrected one that supersedes the earlier one for 60 days. After 60 days, or after the prime approver has approved a payroll, ask the prime approver for permission to edit.

What happens when records are late, missing or wrong

The special provision, handbook and FAQ set no dollar penalty of their own for a late payroll. The consequences sit in the federal clauses. Section I, paragraph 3 of FHWA-1273 (revised June 25, 2026) says a breach of its stipulations may be grounds for withholding progress or final payment, terminating the contract, or suspension or debarment. Under 29 CFR 5.5(a)(2)(i), when a contractor fails to submit required records, the agency named in the contract may, after written notice, cause suspension of further payment, advance or guarantee of funds until the violations cease. Under 5.5(a)(3)(iv)(B), failing to submit required records on request, or refusing worker interviews, may be grounds for debarment under 29 CFR 5.12.

NDDOT's handbook says federal contracts should contain FHWA-1273 Rev. 10/23/2023, while the 2026 form says its use is now optional for the agency. Read your subcontract to see which text you got, and see FHWA-1273 changes in 2026. The handbook says the prime is responsible for subcontractors' timely submittal, and that if you kept no records and NDDOT finds for a worker in a wage dispute, the prime is responsible for restitution and may appeal to USDOL.

Overtime has its own figure. The handbook says Contract Work Hours and Safety Standards Act violations may bring liquidated damages of $10 per day per violation. The current 29 CFR 5.5(b)(2) says $33 per worker for each calendar day worked over 40 hours in a week without overtime pay, and FHWA-1273 names the same amount. Plan around $33.

Job-site interviews and wage complaints

The handbook says NDDOT or the project engineer may interview your workers on site, every prime and subcontractor gets interviews on at least one project per NDDOT district each year, and you must allow them. The form, SFN 9426, asks the worker's classification, pay rate and deductions, and says the payrolls reviewed should be for the interview week. The handbook says interviews are completed in the LCPtracker onsite application. A paper form is uploaded under the E-Documents tab, as SFN 9426 also instructs.

A worker who believes they were underpaid can complain to NDDOT, and the Labor Compliance Program page says the Civil Rights Division investigates and recovers back wages found due. The worker uses SFN 60557 (4-2026), attaches pay records, and acknowledges that the information may be shared with the employer.

Who to contact

Use NDDOT's contact page or the Civil Rights Division details on the LCPtracker page. NDDOT's LCPtracker user manual returned an access error and its 2024 procedure manual link returned not found, so this page does not cover button-level steps.

We prepare certified payroll for public works contractors. Tell us about your project.

Questions

Why can't NDDOT see my payroll in LCPtracker?
NDDOT sees a payroll only after the Prime Approver approves it. The special provision says an unapproved payroll cannot be viewed and is not deemed submitted. Ask your prime's approver.
When is NDDOT certified payroll due?
Within seven calendar days after the regular payment date of the payroll period, per the handbook. It goes through LCPtracker and needs the Prime Approver's approval.
My subcontractor cannot be added in LCPtracker. Why?
It must be on the Approved Subcontractor List or the Qualified Contractor List first. Registration runs through SFN 52243 or NDDOT's online portal and expires each December 31.
Can I fix a payroll after it is submitted?
NDDOT's FAQ says you can submit a corrected payroll for 60 days. After that, or after approval, ask your prime approver for permission to edit.
Does North Dakota have a state certified payroll form?
The handbook says NDDOT does not require weekly payrolls on state-funded-only contracts, and our state table lists no state prevailing wage law found. Federal-aid work goes through LCPtracker.

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. LCPtracker special provision dot.nd.gov
  2. Davis-Bacon Wage and Payroll Requirements Handbook dot.nd.gov
  3. LCPtracker FAQ dot.nd.gov
  4. Labor Compliance Program page dot.nd.gov
  5. 29 CFR 5.5(a)(2)(i) ecfr.gov
  6. contractor information page dot.nd.gov
  7. Registered Contractors dot.nd.gov
  8. Qualified Contractors list dot.nd.gov
  9. SFN 52243 dot.nd.gov
  10. FHWA-1273 fhwa.dot.gov
  11. SFN 9426 dot.nd.gov
  12. SFN 60557 dot.nd.gov
  13. contact page dot.nd.gov

Questions about your NDDOT project

We prepare certified payroll for public works contractors in any state: the weekly federal WH-347 from the payroll export you already run, and state or agency payroll forms by arrangement. You review, sign and submit. Tell us the state, the agency and the system your job uses, and we reply the same business day.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallContact us