Certified payroll requirements for City of Santa Barbara - Purchasing projects

What California public works subcontractors owe, and keep owing every payroll week, when the awarding body is City of Santa Barbara - Purchasing. With live registration data from DIR project filings.

Data updated 2026-07-01

8projects registered 2026-06-26 to 2026-07-01
1subcontractor listings on those projects
Requireddirect DIR eCPR filing on this body's projects

Recent City of Santa Barbara - Purchasing project registrations

New PWC-100 project registrations naming City of Santa Barbara - Purchasing as the awarding body, from DIR's public project registry. Every one of these projects means certified payroll for every contractor and sub on it, starting with the first week worked.

ProjectRegisteredScope
Bid No. 6081 Concrete Grinding Services2026-06-30Sidewalk grinding and repair services as needed for FY27
Concrete Sinkhole Repair2026-06-30Concrete Sinkhole Repair
Bid No. 6033 Repair for City Fuel Sites2026-06-30Bid No. 6033 Repair for City Fuel Sites
Bid No. 6091A Airport As-Needed Roof Rep2026-06-29Roof repairs on various buildings located at the Airport properties, as needed.
Generator Maintenance2026-06-29Preventative maintenance for Cater and SCCBPS generators.
Waste Disposal Services2026-06-29Waste Disposal Services
Bid #. 6187 On-Call Sewer PR & Sewer Tap2026-06-29Bid No. 6187 On-Call Sewer Maintenance Point Repairs and Sewer Tap Installations
Bid No. 6088 El Estero Street Sweeping2026-06-29El Estero Street Sweeping Services as needed FY27.

The portal situation

We have not verified a dedicated compliance portal for City of Santa Barbara - Purchasing. Your contract documents are the source of truth: if a system like LCPtracker, Elation, or PRISM is named, uploads there are the awarding body's monitoring copy. Either way the direct DIR eCPR filing under your own registration is a separate, standing obligation on non-exempt projects (DIR eCPR FAQ).

Your filing duties on these projects

  • Direct DIR eCPR filing. On a registered public works project you submit electronic certified payroll records directly to DIR at least monthly, or more often when the contract says so, under your own PWCR registration (Labor Code 1771.4). DIR is explicit that submitting certified payroll to the awarding body, the prime, or a portal "does not put you in compliance with the state unless you submit eCPRs directly to DIR" (DIR eCPR FAQ).
  • Federal WH-347 weekly when federal money is in the project, with the Statement of Compliance signed (U.S. Department of Labor).
  • Records on demand. A written request for certified payroll records starts a 10 day clock. Miss it and the penalty is $100 per worker per calendar day, enforceable by withholding from your progress payments (Labor Code 1776).

Working for a city

City projects range from small park jobs to major capital work, and city compliance practices vary just as widely. Some cities run portals, most do not. The constant is the state side: on a non-exempt city project you owe eCPRs directly to DIR at least monthly, and the city can hold progress payments over certified payroll problems.

Trades recently listed on City of Santa Barbara - Purchasing work

  • General engineering (A): 5 contractors
  • Well drilling (C-57): 1 contractors
  • Hazardous substance removal (HAZ): 1 contractors
  • D-6 (D-6): 1 contractors
  • D-40 (D-40): 1 contractors
  • Roofing (C-39): 1 contractors

Filing on a City of Santa Barbara - Purchasing project? First one is free

Send the payroll export you already run. We turn it into the WH-347 and the DIR eCPR filing, checked by software and verified by a person. Your first weekly filing is free, before you pay us anything. $995 one time setup, then $249 per month flat.

Got it. We reply the same business day.

First filing free