Certified payroll requirements for Energy Resources Conservation and Development Commission projects

What California public works subcontractors owe on projects where the awarding body is Energy Resources Conservation and Development Commission. Project counts on this page come from WellStanding's collection of DIR project registration data.

Data updated 2026-11-20

The short answer

On Energy Resources Conservation and Development Commission public works projects, you file electronic certified payroll records (eCPR) directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption covers the project. An upload to an awarding body or prime contractor portal does not replace that filing.

  • DIR eCPR: filed directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption applies (Labor Code 1771.4).
  • Portal: we have not verified one for Energy Resources Conservation and Development Commission. If your contract names a system, an upload there is the awarding body's copy and does not replace the DIR filing (DIR eCPR FAQ).
  • Federal payroll: every week, each submission with a signed Statement of Compliance, on contracts subject to the Davis-Bacon and Related Acts (U.S. Department of Labor).
  • Records on request: produce certified records within 10 days of a written request, or forfeit $100 per worker per calendar day (Labor Code 1776); $140 from January 1, 2027 (SB 909).
12 projects in WellStanding's collection of DIR project registration data, as of November 20, 2026
Required direct DIR eCPR filing on this body's projects, unless a DIR exemption applies

Counts cover registrations from June 26, 2026 to November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. Filing tile sources: DIR certified payroll FAQ, DIR eCPR exemptions page.

Recent Energy Resources Conservation and Development Commission project registrations

PWC-100 project registrations naming Energy Resources Conservation and Development Commission as the awarding body, from WellStanding's collection of DIR project registration data, as of November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. The list can miss projects registered in that window.

ProjectRegistered
Woodbury Walk2026-11-03
Villa Madera2026-10-02
Marina Manor 2026-10-02
Fortuna Family Apartments2026-09-30
Sycamore Pointe2026-09-29
Ocean Park2026-09-29
Villa Garcia2026-09-29
Harvard Place 2026-09-25

The portal situation

We have not verified a dedicated compliance portal for Energy Resources Conservation and Development Commission. Your contract documents are the source of truth: if a system like LCPtracker, Elation, or PRISM is named, uploads there are the awarding body's monitoring copy. Either way the direct DIR eCPR filing under your own registration is a separate, standing obligation on non-exempt projects (DIR eCPR FAQ).

Your filing duties on Energy Resources Conservation and Development Commission projects

  • Direct DIR eCPR filing. On a registered public works project you submit electronic certified payroll records directly to DIR at least monthly, or more often when the contract says so (Labor Code 1771.4). DIR is explicit that submitting certified payroll records to other agencies does not fulfill the requirement to submit them to the Labor Commissioner/DIR (DIR eCPR FAQ).
  • Federal weekly payroll. Contracts subject to the Davis-Bacon and Related Acts require payroll information every week, each submission with a signed Statement of Compliance (U.S. Department of Labor).
  • Records on demand. You keep certified records and produce them within 10 days of receiving a written request. Miss it and you forfeit $100 for each calendar day, or part of a day, for each worker, and the Division of Labor Standards Enforcement can request that the penalty be withheld from progress payments then due (Labor Code 1776). From January 1, 2027, SB 909 (Chapter 660, Statutes of 2026) raises that penalty to $140 per worker per calendar day; what SB 909 changes.

Working for a public agency

Read the contract documents for the system or office that takes certified payroll on this agency's projects, and confirm whether the project is one DIR exempts from the direct eCPR filing. If it is not exempt, the filing duties listed on this page apply.

Trades recently listed on Energy Resources Conservation and Development Commission work

Contractor license classes listed on Energy Resources Conservation and Development Commission projects in WellStanding's collection of DIR project registration data, as of November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total.

  • General building (B): 3 contractors
  • Concrete (C-8): 1 contractor
  • General engineering (A): 1 contractor
  • Cabinet and millwork (C-6): 1 contractor
  • Plumbing (C-36): 1 contractor
  • HVAC (C-20): 1 contractor

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. Labor Code 1771.4 leginfo.legislature.ca.gov
  2. DIR eCPR FAQ dir.ca.gov
  3. U.S. Department of Labor dol.gov
  4. Labor Code 1776 leginfo.legislature.ca.gov
  5. SB 909 leginfo.legislature.ca.gov
  6. DIR eCPR exemptions page dir.ca.gov

Filing on a Energy Resources Conservation and Development Commission project? First filing free

Send the payroll export you already run. We turn it into the WH-347 and the DIR eCPR filing, checked by software and verified by a person. First filing free, before you pay us anything. $995 one time setup, then $249 per month flat for crews up to 25 workers.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallFirst filing free