Certified payroll requirements for San Diego Unified School District projects
What California public works subcontractors owe on projects where the awarding body is San Diego Unified School District. Project counts on this page come from WellStanding's collection of DIR project registration data.
Data updated 2026-11-13
The short answer
On San Diego Unified School District public works projects, you file electronic certified payroll records (eCPR) directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption covers the project. An upload to an awarding body or prime contractor portal does not replace that filing.
- DIR eCPR: filed directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption applies (Labor Code 1771.4).
- Portal: we have not verified one for San Diego Unified School District. If your contract names a system, an upload there is the awarding body's copy and does not replace the DIR filing (DIR eCPR FAQ).
- Federal payroll: every week, each submission with a signed Statement of Compliance, on contracts subject to the Davis-Bacon and Related Acts (U.S. Department of Labor).
- Records on request: produce certified records within 10 days of a written request, or forfeit $100 per worker per calendar day (Labor Code 1776); $140 from January 1, 2027 (SB 909).
Counts cover registrations from June 26, 2026 to November 13, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. Filing tile sources: DIR certified payroll FAQ, DIR eCPR exemptions page.
Recent San Diego Unified School District project registrations
PWC-100 project registrations naming San Diego Unified School District as the awarding body, from WellStanding's collection of DIR project registration data, as of November 13, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. The list can miss projects registered in that window.
| Project | Registered | Scope |
|---|---|---|
| Madison HS Stage Curtain Replacement | 2026-11-10 | |
| I&M of Biofiltration Sys @ Various Sites | 2026-11-04 | |
| Replace Automatic Gate Operators @ PPO | 2026-10-29 | Replacement of doors at the Lincoln Community Center. |
| Marquee Sign Install @ Rodriguez ES | 2026-10-29 | |
| WSM @ Sunset View Elementary School LLB | 2026-10-28 | |
| Switchboard Replacement @ Various Sites | 2026-10-28 | Potholing for Multi-year modernization effort encompassing Lake McSwain, McClure point, Barrett cove, and Hors |
| CMAS Cert Sys Integration Tech Upgrades | 2026-10-28 | |
| WSM Ph 2 @ Albert Einstein ES LLB | 2026-10-28 | Warner Center Park - Roof Replacement - As-Needed Roofing Construction, Retrofit, Maintenance, and/ or Repair |
The portal situation
We have not verified a dedicated compliance portal for San Diego Unified School District. Your contract documents are the source of truth: if a system like LCPtracker, Elation, or PRISM is named, uploads there are the awarding body's monitoring copy. Either way the direct DIR eCPR filing under your own registration is a separate, standing obligation on non-exempt projects (DIR eCPR FAQ).
Your filing duties on San Diego Unified School District projects
- Direct DIR eCPR filing. On a registered public works project you submit electronic certified payroll records directly to DIR at least monthly, or more often when the contract says so (Labor Code 1771.4). DIR is explicit that submitting certified payroll records to other agencies does not fulfill the requirement to submit them to the Labor Commissioner/DIR (DIR eCPR FAQ).
- Federal weekly payroll. Contracts subject to the Davis-Bacon and Related Acts require payroll information every week, each submission with a signed Statement of Compliance (U.S. Department of Labor).
- Records on demand. You keep certified records and produce them within 10 days of receiving a written request. Miss it and you forfeit $100 for each calendar day, or part of a day, for each worker, and the Division of Labor Standards Enforcement can request that the penalty be withheld from progress payments then due (Labor Code 1776). From January 1, 2027, SB 909 (Chapter 660, Statutes of 2026) raises that penalty to $140 per worker per calendar day; what SB 909 changes.
Working for a school district
Read the contract documents for the system or office that takes certified payroll on this district's projects, and confirm whether the project is one DIR exempts from the direct eCPR filing.
Trades recently listed on San Diego Unified School District work
Contractor license classes listed on San Diego Unified School District projects in WellStanding's collection of DIR project registration data, as of November 13, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total.
- General building (B): 18 contractors
- General engineering (A): 13 contractors
- Electrical (C-10): 9 contractors
- D-12: 5 contractors
- D-34: 5 contractors
- Plumbing (C-36): 4 contractors
Keep reading
Other school district requirements
Works with the payroll you already run
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- Labor Code 1771.4 leginfo.legislature.ca.gov
- DIR eCPR FAQ dir.ca.gov
- U.S. Department of Labor dol.gov
- Labor Code 1776 leginfo.legislature.ca.gov
- SB 909 leginfo.legislature.ca.gov
- DIR eCPR exemptions page dir.ca.gov