Certified payroll requirements for City of Burbank projects
What California public works subcontractors owe, and keep owing every payroll week, when the awarding body is City of Burbank. With live registration data from DIR project filings.
Data updated 2026-07-01
Recent City of Burbank project registrations
New PWC-100 project registrations naming City of Burbank as the awarding body, from DIR's public project registry. Every one of these projects means certified payroll for every contractor and sub on it, starting with the first week worked.
| Project | Registered | Scope |
|---|---|---|
| FY26-27 BALLFIELD MAINT | 2026-06-30 | Provide ballfield maintenance for Parks and Rec |
| FY26-27 SERVICES | 2026-06-30 | Repairs and Installs for Sports Related Equipment at various facilities |
| FY 26/27 FUEL PUMP MAINT & REPAIR - PW | 2026-06-30 | FY 26/27 - MAINTENANCE AND REPAIR OF FUEL PUMPS - CITYWIDE |
| FY 26/27 - FIBER OPTICS SYS REPAIRS - PW | 2026-06-30 | FY 26/27 PERFORM FIBER TERMINATIONS & OPTIC SYSTEM PARTS AND REPAIRS - CITYWIDE |
| Entry and Construction Agreement | 2026-06-29 | Contractor and City related to Settlement Agreement relating to real property located at 1501 N Victory Place |
| FY 26/27 BACKFLOW PREVENTION | 2026-06-27 | FY 26/27 - BACKFLOW PREVENTION DEVICES - CITYWIDE |
| FY 26/27 JAIL LOCK SYSTEM MAINT | 2026-06-27 | FY 26/27 JAIL LOCK SYSTEM REPAIRS AND MAINTENANCE - PW |
| FY 26/27 - LOW VOLTAGE INSTALL - PW | 2026-06-27 | FY 26/27 LOW VOLTAGE SYSTEM INSTALLATION AND SERVICES - CITYWIDE |
The portal situation
We have not verified a dedicated compliance portal for City of Burbank. Your contract documents are the source of truth: if a system like LCPtracker, Elation, or PRISM is named, uploads there are the awarding body's monitoring copy. Either way the direct DIR eCPR filing under your own registration is a separate, standing obligation on non-exempt projects (DIR eCPR FAQ).
Your filing duties on these projects
- Direct DIR eCPR filing. On a registered public works project you submit electronic certified payroll records directly to DIR at least monthly, or more often when the contract says so, under your own PWCR registration (Labor Code 1771.4). DIR is explicit that submitting certified payroll to the awarding body, the prime, or a portal "does not put you in compliance with the state unless you submit eCPRs directly to DIR" (DIR eCPR FAQ).
- Federal WH-347 weekly when federal money is in the project, with the Statement of Compliance signed (U.S. Department of Labor).
- Records on demand. A written request for certified payroll records starts a 10 day clock. Miss it and the penalty is $100 per worker per calendar day, enforceable by withholding from your progress payments (Labor Code 1776).
Working for a city
City projects range from small park jobs to major capital work, and city compliance practices vary just as widely. Some cities run portals, most do not. The constant is the state side: on a non-exempt city project you owe eCPRs directly to DIR at least monthly, and the city can hold progress payments over certified payroll problems.
Trades recently listed on City of Burbank work
- General building (B): 6 contractors
- Electrical (C-10): 4 contractors
- General engineering (A): 3 contractors
- Roofing (C-39): 2 contractors
- Landscaping (C-27): 1 contractors
- Sign (C-45): 1 contractors