Certified payroll requirements for City of Corona - 01 projects
What California public works subcontractors owe on projects where the awarding body is City of Corona - 01. Project counts on this page come from WellStanding's collection of DIR project registration data.
Data updated 2026-11-20
The short answer
On City of Corona - 01 public works projects, you file electronic certified payroll records (eCPR) directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption covers the project. An upload to an awarding body or prime contractor portal does not replace that filing.
- DIR eCPR: filed directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption applies (Labor Code 1771.4).
- Portal: we have not verified one for City of Corona - 01. If your contract names a system, an upload there is the awarding body's copy and does not replace the DIR filing (DIR eCPR FAQ).
- Federal payroll: every week, each submission with a signed Statement of Compliance, on contracts subject to the Davis-Bacon and Related Acts (U.S. Department of Labor).
- Records on request: produce certified records within 10 days of a written request, or forfeit $100 per worker per calendar day (Labor Code 1776); $140 from January 1, 2027 (SB 909).
Counts cover registrations from June 26, 2026 to November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. Filing tile sources: DIR certified payroll FAQ, DIR eCPR exemptions page.
Recent City of Corona - 01 project registrations
PWC-100 project registrations naming City of Corona - 01 as the awarding body, from WellStanding's collection of DIR project registration data, as of November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. The list can miss projects registered in that window.
| Project | Registered | Scope |
|---|---|---|
| Asphalt Pavement and Overlay Services | 2026-11-20 | Emergency asphalt repairs on Ortega and Avenida Siega. |
| City Park Revitalization Project | 2026-11-19 | 2610064 - Haynes CES - Replace Deteriorated Roofing |
| Well 22 Site Piping and Site Improvement | 2026-11-16 | ASPHALT OVERLAY TO 6,800 SQ FT WITH 1" CONVENTIONAL HOT MIX ASPHALT, ROLL AND COMPACT. |
| Citywide Sidewalk Improvements - Phase I | 2026-11-09 | |
| Well 15 Discharge Line Repair Project | 2026-11-09 | |
| ROOF COATING REPLACEMENT SERVICES | 2026-11-09 | |
| PLAYGROUND RUBBERIZED SURFACING INSTAL | 2026-11-05 | |
| Fiber Replacement- Corona Warehouse | 2026-11-02 |
The portal situation
We have not verified a dedicated compliance portal for City of Corona - 01. Your contract documents are the source of truth: if a system like LCPtracker, Elation, or PRISM is named, uploads there are the awarding body's monitoring copy. Either way the direct DIR eCPR filing under your own registration is a separate, standing obligation on non-exempt projects (DIR eCPR FAQ).
Your filing duties on City of Corona - 01 projects
- Direct DIR eCPR filing. On a registered public works project you submit electronic certified payroll records directly to DIR at least monthly, or more often when the contract says so (Labor Code 1771.4). DIR is explicit that submitting certified payroll records to other agencies does not fulfill the requirement to submit them to the Labor Commissioner/DIR (DIR eCPR FAQ).
- Federal weekly payroll. Contracts subject to the Davis-Bacon and Related Acts require payroll information every week, each submission with a signed Statement of Compliance (U.S. Department of Labor).
- Records on demand. You keep certified records and produce them within 10 days of receiving a written request. Miss it and you forfeit $100 for each calendar day, or part of a day, for each worker, and the Division of Labor Standards Enforcement can request that the penalty be withheld from progress payments then due (Labor Code 1776). From January 1, 2027, SB 909 (Chapter 660, Statutes of 2026) raises that penalty to $140 per worker per calendar day; what SB 909 changes.
Working for a city
Read the contract documents for the system or office that takes certified payroll on this city's projects, and confirm whether the project is one DIR exempts from the direct eCPR filing.
Trades recently listed on City of Corona - 01 work
Contractor license classes listed on City of Corona - 01 projects in WellStanding's collection of DIR project registration data, as of November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total.
- General building (B): 12 contractors
- General engineering (A): 10 contractors
- Electrical (C-10): 4 contractors
- Low voltage systems (C-7): 3 contractors
- Concrete (C-8): 3 contractors
- Insulation and acoustical (C-2): 3 contractors
Keep reading
Other city requirements
Works with the payroll you already run
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- Labor Code 1771.4 leginfo.legislature.ca.gov
- DIR eCPR FAQ dir.ca.gov
- U.S. Department of Labor dol.gov
- Labor Code 1776 leginfo.legislature.ca.gov
- SB 909 leginfo.legislature.ca.gov
- DIR eCPR exemptions page dir.ca.gov