The short answer

On City of Fullerton public works projects, you file electronic certified payroll records (eCPR) directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption covers the project. An upload to an awarding body or prime contractor portal does not replace that filing.

  • DIR eCPR: filed directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption applies (Labor Code 1771.4).
  • Portal: we have not verified one for City of Fullerton. If your contract names a system, an upload there is the awarding body's copy and does not replace the DIR filing (DIR eCPR FAQ).
  • Federal payroll: every week, each submission with a signed Statement of Compliance, on contracts subject to the Davis-Bacon and Related Acts (U.S. Department of Labor).
  • Records on request: produce certified records within 10 days of a written request, or forfeit $100 per worker per calendar day (Labor Code 1776); $140 from January 1, 2027 (SB 909).
20 projects in WellStanding's collection of DIR project registration data, as of November 20, 2026
Required direct DIR eCPR filing on this body's projects, unless a DIR exemption applies

Counts cover registrations from June 26, 2026 to November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. Filing tile sources: DIR certified payroll FAQ, DIR eCPR exemptions page.

Recent City of Fullerton project registrations

PWC-100 project registrations naming City of Fullerton as the awarding body, from WellStanding's collection of DIR project registration data, as of November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. The list can miss projects registered in that window.

ProjectRegisteredScope
Ash Woods Area Infrastructure Improvemen2026-11-19The abandonment and replacement of the water main and appurtenant work at Bronte Drive and Bowen Drive.
Orangethorpe/Harbor Traf Sig/Safety Ligh2026-11-18
Fire/Life Safety and Fire Sprinkler Test2026-11-09
FLOOR REPLACEMENT AT CITY HALL IT DEPT2026-11-09
FLOOR REPLACEMENT AT RICHMAN PARK BLDG2026-11-04
AMERIGE STANFORD ADA RAMPS CONSTRUCTION2026-11-03
Kimberly 2 Well Site Camera Installation2026-11-02
Valencia Mesa AC Derms Project2026-10-27FY 2024-25 Street Rehabilitation of 11 streets in the City of Villa Park

The portal situation

We have not verified a dedicated compliance portal for City of Fullerton. Your contract documents are the source of truth: if a system like LCPtracker, Elation, or PRISM is named, uploads there are the awarding body's monitoring copy. Either way the direct DIR eCPR filing under your own registration is a separate, standing obligation on non-exempt projects (DIR eCPR FAQ).

Your filing duties on City of Fullerton projects

  • Direct DIR eCPR filing. On a registered public works project you submit electronic certified payroll records directly to DIR at least monthly, or more often when the contract says so (Labor Code 1771.4). DIR is explicit that submitting certified payroll records to other agencies does not fulfill the requirement to submit them to the Labor Commissioner/DIR (DIR eCPR FAQ).
  • Federal weekly payroll. Contracts subject to the Davis-Bacon and Related Acts require payroll information every week, each submission with a signed Statement of Compliance (U.S. Department of Labor).
  • Records on demand. You keep certified records and produce them within 10 days of receiving a written request. Miss it and you forfeit $100 for each calendar day, or part of a day, for each worker, and the Division of Labor Standards Enforcement can request that the penalty be withheld from progress payments then due (Labor Code 1776). From January 1, 2027, SB 909 (Chapter 660, Statutes of 2026) raises that penalty to $140 per worker per calendar day; what SB 909 changes.

Working for a city

Read the contract documents for the system or office that takes certified payroll on this city's projects, and confirm whether the project is one DIR exempts from the direct eCPR filing.

Trades recently listed on City of Fullerton work

Contractor license classes listed on City of Fullerton projects in WellStanding's collection of DIR project registration data, as of November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total.

  • General engineering (A): 4 contractors
  • Plumbing (C-36): 2 contractors
  • Earthwork and paving (C-12): 2 contractors
  • Pipeline (C-34): 1 contractor
  • Sanitation system (C-42): 1 contractor
  • Electrical (C-10): 1 contractor

Sources

Every figure on this page links to its source where it first appears. The full list, in order:

  1. Labor Code 1771.4 leginfo.legislature.ca.gov
  2. DIR eCPR FAQ dir.ca.gov
  3. U.S. Department of Labor dol.gov
  4. Labor Code 1776 leginfo.legislature.ca.gov
  5. SB 909 leginfo.legislature.ca.gov
  6. DIR eCPR exemptions page dir.ca.gov

Filing on a City of Fullerton project? First filing free

Send the payroll export you already run. We turn it into the WH-347 and the DIR eCPR filing, checked by software and verified by a person. First filing free, before you pay us anything. $995 one time setup, then $249 per month flat for crews up to 25 workers.

Got it. If your filing is due sooner, call us at 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

Prefer the phone? Call 1-858-834-8430, Monday to Friday, 7:00 to 5:00 Pacific.

CallFirst filing free