Certified payroll requirements for County of Orange/OC Public Works projects
What California public works subcontractors owe on projects where the awarding body is County of Orange/OC Public Works. Project counts on this page come from WellStanding's collection of DIR project registration data.
Data updated 2026-11-20
The short answer
On County of Orange/OC Public Works public works projects, you file electronic certified payroll records (eCPR) directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption covers the project. An upload to an awarding body or prime contractor portal does not replace that filing.
- DIR eCPR: filed directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption applies (Labor Code 1771.4).
- Portal: we have not verified one for County of Orange/OC Public Works. If your contract names a system, an upload there is the awarding body's copy and does not replace the DIR filing (DIR eCPR FAQ).
- Federal payroll: every week, each submission with a signed Statement of Compliance, on contracts subject to the Davis-Bacon and Related Acts (U.S. Department of Labor).
- Records on request: produce certified records within 10 days of a written request, or forfeit $100 per worker per calendar day (Labor Code 1776); $140 from January 1, 2027 (SB 909).
Counts cover registrations from June 26, 2026 to November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. Filing tile sources: DIR certified payroll FAQ, DIR eCPR exemptions page.
Recent County of Orange/OC Public Works project registrations
PWC-100 project registrations naming County of Orange/OC Public Works as the awarding body, from WellStanding's collection of DIR project registration data, as of November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total. The list can miss projects registered in that window.
| Project | Registered |
|---|---|
| 1055 Main Air Handler #1 Repair, Aim #12 | 2026-11-19 |
| Juvenile Hall-MRC Kitchen | 2026-11-10 |
| SANTA ANA RIVER (E01) AVIO TIDE GATES RE | 2026-11-10 |
| Dana Point Library Sewer Replacement | 2026-11-10 |
| Cove Room Lighting Replacement | 2026-10-28 |
| JOC: Traffic Signal Upgrades - Esperanza | 2026-10-26 |
| JOC: OCSD GATES BUILDING ROOM 561 - PRE- | 2026-10-26 |
| JOC - Aim #- 1048-JH-Laundry Facilities | 2026-10-21 |
The portal situation
We have not verified a dedicated compliance portal for County of Orange/OC Public Works. Your contract documents are the source of truth: if a system like LCPtracker, Elation, or PRISM is named, uploads there are the awarding body's monitoring copy. Either way the direct DIR eCPR filing under your own registration is a separate, standing obligation on non-exempt projects (DIR eCPR FAQ).
DIR-approved labor compliance program. DIR's list of approved programs (data as of October 22, 2026) includes Orange County Public Works, LCP ID 2013.01193, approved March 21, 2014. An approved program does not by itself end the direct DIR eCPR filing: DIR's eCPR exemption list names only the four legacy programs. All 195 programs.
Your filing duties on County of Orange/OC Public Works projects
- Direct DIR eCPR filing. On a registered public works project you submit electronic certified payroll records directly to DIR at least monthly, or more often when the contract says so (Labor Code 1771.4). DIR is explicit that submitting certified payroll records to other agencies does not fulfill the requirement to submit them to the Labor Commissioner/DIR (DIR eCPR FAQ).
- Federal weekly payroll. Contracts subject to the Davis-Bacon and Related Acts require payroll information every week, each submission with a signed Statement of Compliance (U.S. Department of Labor).
- Records on demand. You keep certified records and produce them within 10 days of receiving a written request. Miss it and you forfeit $100 for each calendar day, or part of a day, for each worker, and the Division of Labor Standards Enforcement can request that the penalty be withheld from progress payments then due (Labor Code 1776). From January 1, 2027, SB 909 (Chapter 660, Statutes of 2026) raises that penalty to $140 per worker per calendar day; what SB 909 changes.
Working for a county
Read the contract documents for the system or office that takes certified payroll on this county's projects, and confirm whether the project is one DIR exempts from the direct eCPR filing.
Trades recently listed on County of Orange/OC Public Works work
Contractor license classes listed on County of Orange/OC Public Works projects in WellStanding's collection of DIR project registration data, as of November 20, 2026. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total.
- General building (B): 5 contractors
- Electrical (C-10): 3 contractors
- General engineering (A): 3 contractors
- Plumbing (C-36): 2 contractors
- HVAC (C-20): 2 contractors
- Hazardous substance removal (HAZ): 2 contractors
Keep reading
Other county requirements
Works with the payroll you already run
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- Labor Code 1771.4 leginfo.legislature.ca.gov
- DIR eCPR FAQ dir.ca.gov
- U.S. Department of Labor dol.gov
- Labor Code 1776 leginfo.legislature.ca.gov
- SB 909 leginfo.legislature.ca.gov
- DIR eCPR exemptions page dir.ca.gov
- DIR's list of approved programs dir.ca.gov