Certified payroll for roofing subs (C-39) in California
What certified payroll actually looks like in the roofing trade on California public works, plus recent registration activity for the classification from WellStanding's collection of DIR project registration data.
Data updated 2026-11-20
The short answer
Roofing subcontractors on California public works file certified payroll the same way as every trade: electronic certified payroll records (eCPR) directly to DIR at least monthly on non-exempt projects, and weekly federal payroll on Davis-Bacon contracts, at the rates in DIR's determination for the project county and craft.
- DIR eCPR: filed directly with DIR at least monthly, or more often when the contract says so, unless a DIR exemption applies (Labor Code 1771.4).
- Wage rates: set by craft and by county in DIR's published determinations; check every classification before the first certified payroll on a new project (DIR prevailing wage determinations).
- Federal payroll: every week, each submission with a signed Statement of Compliance, on contracts subject to the Davis-Bacon and Related Acts (U.S. Department of Labor).
- Records on request: produce certified records within 10 days of a written request, or forfeit $100 per worker per calendar day (Labor Code 1776); $140 from January 1, 2027 (SB 909).
The roofing trade's certified payroll reality
Roofer determinations frequently carry their own sub-classifications, kettle and pitch work historically among them, plus condition-driven premiums, and roofing's seasonal reality concentrates public work into tight summer windows on occupied campuses. That combination produces the classic roofing filing failure: a compressed schedule, a crew surging from five to fifteen, and certified payroll falling weeks behind exactly when the district's payment application needs it current. Solar-adjacent roofing adds a second wrinkle, since PV install hours can read under electrician determinations rather than roofer. If you run behind, the catch-up path matters more in this trade than any other: progress payments on summer work land after school starts, and missing filings are the first thing a district business office holds against them.
Whatever the craft mix, the mechanics are the same statewide: rates come from the project county's published determination (DIR lookup), the eCPR goes directly to DIR on non-exempt projects, and the federal WH-347 rides along weekly where federal funds apply. The full picture is in the complete guide.
Where roofing public works registered recently
From WellStanding's collection of DIR's PWC-100 project registration data, as of November 20, 2026, matched to CSLB license records: C-39-classified contractors newly listed on public works projects, by home county and by awarding body. Collection paused from July 7 to September 3, 2026, so counts are a floor, not a total.
By contractor county
- Los Angeles County: 29
- San Diego County: 14
- Orange County: 13
- Riverside County: 11
- Alameda County: 10
- Fresno County: 9
By awarding body
- San Diego Unified School District: 5 listings
- Capistrano Unified School District: 3 listings
- Judicial Council of California - (PUB WORKS): 3 listings
- County of Santa Barbara General Services, Procurement Services: 3 listings
- Nevada Irrigation District - Engineering: 3 listings
- City of Corona - 01: 2 listings
Keep reading
Works with the payroll you already run
Sources
Every figure on this page links to its source where it first appears. The full list, in order:
- Labor Code 1771.4 leginfo.legislature.ca.gov
- DIR prevailing wage determinations dir.ca.gov
- U.S. Department of Labor dol.gov
- Labor Code 1776 leginfo.legislature.ca.gov
- SB 909 leginfo.legislature.ca.gov